• Title/Summary/Keyword: installation/management

Search Result 1,166, Processing Time 0.032 seconds

Safety Case for AREX's E&M System (공항철도 기전시스템의 종합안전대책기술서)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

Design Considerations of Electronic Display in Part 23 Airplanes (소형 항공기의 전자식 디스플레이 설계시 고려사항)

  • Yi, Baeckjun;Jin, Youngkwon
    • Journal of Aerospace System Engineering
    • /
    • v.7 no.1
    • /
    • pp.26-31
    • /
    • 2013
  • A glass cockpit is an aircraft cockpit that features electronic (digital) instrument displays, typically large LCD screens, rather than the traditional style of analog dials and gauges. While a traditional cockpit relies on numerous mechanical gauges to display information, a glass cockpit uses several displays driven by flight management systems, that can be adjusted to display flight information as needed. This study introduces design considerations of electronic display in KAS Part 23 airplanes.

A Study on the Stone Icehouses in Korea (석빙고고(石氷庫考))

  • Sohn, Young-Sik
    • Journal of architectural history
    • /
    • v.2 no.2 s.4
    • /
    • pp.9-25
    • /
    • 1993
  • The storehouse for ice was an installation to use the ice during summer season. Even though it shows various versions of styles according to the different periods and regions, it consistently developed through the history with structural characteristics. In this study, first, the management of the icehouse system through the history is examined; second, seven existing icehouses in Korea are investigated in terms of their size, material, history, structure ; and finally, the structural patterns of the ice houses are examined.

  • PDF

Installation and Management of the Software using Security Mechanism and Registry Monitoring (보안과 레지스트리 감시를 이용한 소프트웨어 설치 관리 시스템)

  • 황기태;주희경;고진수;김남윤
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10a
    • /
    • pp.799-801
    • /
    • 2003
  • 본 논문은 불법 소프트웨어가 조직 내에 설치 사용될 수 없도록 소프트웨어를 설치하고 관리하는 시스템 모델을 제안한다. 모든 소프트웨어는 서버에서 압축 관리되며. 인증 받은 클라이언트만이 반드시 서버로부터 소프트웨어를 다운로드받아 설치한다. 또한 주기적으로 클라이언트는 레지스트리를 검색하여 불법 소프트웨어의 설치 여부를 검사하여 서버에 보고한다. 본 논문에서 제안된 시스템은 정품 소프트웨어의 불법 사용 방지뿐만 아니라 라이센스 통제와 소프트웨어 관리의 용이성의 장점을 가진다.

  • PDF

A Study on the Installation of Combined Turnout Management System (분기기 통합 관리 시스템 구축에 관한 연구)

  • Kong, Hyun-Jin;Kim, Doo-Guym;Ko, Young-Hwan;Song, Joong-Ho;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1077-1083
    • /
    • 2011
  • Turnout is one of railroad track components. The turnout is used to change train routes to near other sections when keeping the train speed. There are many accidents in the section including the turnout. The number of accidents and errors is 363 for ten years in the section including the turnout and annual average is 36.3. To ensure safety of the turnout, it is necessary to install monitoring systems. By using the monitoring systems, it is able to accumulate related information, develop maintenance and take a step for accidents in advance. Hence, The number of accidents and errors is decreased in the section including the turnout. So, when new turnout is installed, it is needed to use monitoring systems. Therefore, combined turnout management system is needed in Korea. It is possible to perform efficient maintenance because real-time monitoring system by using sensors and data-base management system. In this paper, accidents in the section including domestic turnout are analyzed and foreign combined turnout management system is presented. Hence, articles for installing the combined turnout management system in Korea are proposed.

  • PDF

The Management of Nonpoint Source and Storm Water Reduction with LID Techniques in Inchon City, South Korea

  • Lim, Dohun;Lee, Yoonjin
    • Journal of Environmental Science International
    • /
    • v.24 no.10
    • /
    • pp.1239-1251
    • /
    • 2015
  • Impervious areas have been expanded by urbanization and the natural structure of water circulation has been destroyed. The limits of centralized management for controlling storm water runoff in urban areas have been suggested. Low impact development (LID) technologies have been promoted as a crucial alternative, establishing a connection with city development plans to build green infrastructures in environmentally friendly cities. Thus, the improvement of water circulation and the control of nonpoint source were simulated through XP-SWMM (storm water and wastewater management model for experts) in this study. The application of multiple LID combination practices with permeable pavements, bioretention cells, and gutter filters were observed as reducing the highest runoff volume by up to 70%. The results from four different LID installation scenarios indicated that permeable paving is the most effective method for reducing storm water runoff. The rate of storm water runoff volume reduced as the rainfall duration extended. Based on the simulation results, each LID facility was designed and constructed in the target area. The LID practices in an urban area enable future studies of the analysis of the criteria, suitable capacity, and cost-efficiency, and proper management methods of various LID techniques.

A Study on the Intensive Safety Management Items of Small-Sized Construction Sites (소규모 건축공사 중점안전관리항목에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Jang, Yun-Ra
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.27-34
    • /
    • 2013
  • Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.