본 논문은 가스 안전에 대한 신기술의 도입 및 훈련 교육이 가스사고 방지에 미치는 영향을 분석하고자 한다. 이러한 연구목적을 위해 한국가스안전공사에서 시행되고 있는 검사, 안전 시험, 그리고 훈련프로그램들이 조사되었다. 그리고 지난 20년 동안의 가스 사고, 가스 안전장치 보급률 및 훈련, 가스 검사 자료를 수집하였다. 실증분석을 위해 SPSS를 이용하여 다중회귀분석을 수행하였다. 결과는 도시가스 및 액화석유가스 시스템 모두에서 휴즈콕의 보급률 및 훈련 프로그램이 가스사고율 감소에 통계적으로 유의한 영향을 미친다는 것을 보여주었다.
Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.
Objective: This study aims to draw the characteristics of occupational accidents occurred in cabling work, and assess accident severity based on occupational injury data. Background: Accident factors and accident risk are different by the place of work in cabling work. Field managers require information on accident prevention that can be easily understood by workers. However, there has been a lack of studies that focus on cabling work in Korea. Method: This study classifies 450 injured persons caused in cabling work by process, and analyzes the characteristics of occupational injuries from the aspects of age, work experience and accident type. This study also analyzes accident frequency and severity of injury. Results: Results show that preparing/finishing (33.3%) was the most common type of cabling process in injuries, followed by maintenance (28.4%), routing/income (23.1%) and wiring/installation (15.1%) process. The critical incidents in the level of risk management were falls from height in the routing/incoming process, and falls from height in the maintenance process. And, incidents ranked as 'High' level of risk management were slips and trips, fall from height and vehicle incident in the preparing/finishing process, and fall from height in the wiring/installation process. Conclusion and Application: The relative frequency of accident and its severity by working process serve as important information for accident prevention, and are critical for determining priorities in preventive measures.
The number of fire and explosion accidents caused by pyrolysis oil and gas at waste plastic pyrolysis plants is increasing, but accident status and safety conditions have not been clearly identified. Therefore, the aim of the study was to identify the risks of the waste plastic pyrolysis process and suggest appropriate safety management measures. We collected information on 19 cases of fire and explosion accidents that occurred between 2010 and 2021 at 26 waste plastic pyrolysis plants using the Korea Occupational Safety and Health Agency (KOSHA) database and media reports. The mechanical, managerial, personnel-related, and environmental problems within a plant and problems related to government agencies and the design, manufacturing, and installation companies involved with pyrolysis equipment were analyzed using the 4Ms of Machines, Management, Man, and Media, as well as the System-Theoretic Accident Model and Processes (STAMP) methodology for seven accident cases with accident investigation reports. Study findings indicate the need for establishing legal and institutional support measures for waste plastic pyrolysis plants in order to prevent fire and explosion accidents in the pyrolysis process. In addition, ensuring safety from the design and manufacturing stages of facilities is essential, as are measures that ensure systematic operations after the installation of safety devices.
Korea's elevator industry is one of the world's eighth-largest industrial sectors and the third largest in the world by new installations. This year, the number of elevators has exceeded 700,000, and the number of new installations is 30,000-40,000 every year. However, the news of elevator-related accidents is reported continuously through the media and the accident rate is not decreasing. In particular, among the recent accidents related to elevators, accidents related to elevator workers are increasing, causing social problems. This year, the National Assembly's Environmental Labor Relations Commission's National Auditors lost five lives a year and 12 elevator workers were killed in fall and stenosis accidents during the installation, maintenance and replacement of the elevators for about two years since 2018. It took place to adopt the representatives of four domestic elevator companies as witnesses. An elevator worker is a collective term for workers involved in the design, manufacturing, installation, replacement, maintenance, inspection, management, and supervision related to the elevator industry, and the related accidents are called elevator worker accidents. Analysis of elevator-related accidents in the past has shown that the fault of the user accounted for 70% of the total, and the fault of the worker accounted for about 2.5%, and the accident occurred to the user or the user due to carelessness of the worker during the lift-related work. Currently, elevator-related accidents are reported by the Korea Elevator Safety Agency under Article 48 of the Elevator Safety Management Act under the Ministry of Interior and Safety. If deemed necessary for the prevention and prevention of recurrence of an elevator accident, the cause and condition of the elevator accident may be investigated. However, the current draft law is limited only to elevators after installation inspection, and is separated from the Ministry of Employment and Labor's data on accidents occurring in the manufacturing and installation stages related to the elevator industry. This study analyzes the recent safety accidents of elevator workers and prepares safety measures to prevent them through the risk analysis, and also draws out the problems and improvements of the current elevator worker accident investigation to find the elevator worker accident rate that is on the increase trend.
This paper describes the effectiveness of continuous water removal in oil immersed transformers. Insulation oil in which insulation papers were immersed were prepared for tests and water concentrations in oil with heating time were measured at five oil temperatures. Also, the tests that water dissolved in $100^{\circ}C$ oil was removed at once and continuously at $50^{\circ}C$ and $100^{\circ}C$ were performed for consideration of effective method for water removal. Test results indicated that the oils for water measurement have to be extracted at similar temperatures and water in oil has to be continuously removed at higher temperatures for more effective water management of transformers.
The necessity of Power Quality(PQ) Management grow bigger because the disturbance strength in power system is increasing, on the other hand, the tolerance of electrical components is reducing with widely use of the IT and digital equipments. The domestic management standards on power quality are enacted based on the IEC standards in recent. Since the IEC standards defines the measurement and evaluation point on PQ as PCC(Point of Common Coupling) which is normally the point of penetration between customer and power company, the PQ monitoring system(PQMS) should be made to measure and manage the PQ of custom effectively. In this paper, therefore, the economical construction plan on PQMS using the wireless communication channel in distribution automation system is suggested, and the usefulness of the PQMS are shown by analyzing the PQM data with IEC standards.
In this paper, ESS capacity installed in industrial customer is calculated using economic analysis. To do this, electric charge for industrial customer is analyzed and power management system(PMS) of ESS is selected. Reduction of kW cost and kWh cost are set to 'benefit' according to operation of ESS. Also, installation cost and maintenance cost of ESS are set to 'cost'. Proper ESS capacity is determined as a result of benefit-to-cost(B/C) analysis according to the variation of ESS installation cost. In case study, B/C is analyzed for the specific industrial customer and minimum capacity of ESS to make a profit are proposed for the customer.
Electric utility companies have the responsibility of providing good electricity for their customers. They have introduced the DAS(Distribution Automation System) to automate the power distribution networks. DAS engineers require state-of-the-art applications, such as a way to actively manage the distribution system and gain economic benefits from a flexible DAS architectural design. The existing DAS is not capable of handling these needs. It requires operator intervention whenever feeder overloading is detected while operator error could cause the feeder overload area to be extended. It also utilizes a closed architecture and it is therefore difficult to meet the system migration and future enhancement requirements. This paper represents a web based, platform-independent, flexible DAS architectural design and active database application. Recent advanced Internet technologies are fully utilized in this new DAS architecture allowing it to meet the system migration and future enhancement requirements. By using an active database, the DAS can minimize the feeder overloading area in the distribution system without operator intervention, thereby minimizing mistakes due to operator error.
Various database and analysis system has been used for the cost effective maintenance of distribution facility but it is not effective because of the lack of interconnection among these systems. In order to overcome this problem this paper proposes reliability centered maintenance system based on the on-line monitoring of distribution system through intelligent distribution equipment. This system is made by the interconnection of distribution automation system, asset management system, failure analysis system and failure mode effect analysis system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.