• Title/Summary/Keyword: inspection model

검색결과 1,289건 처리시간 0.024초

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제7권2호
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

경제적(經濟的) 검사방식(檢査方式)의 채택(採擇)을 위한 계량적(計量的) 접근방법(接近方法)의 유형(類形)과 그 특징(特徵)의 비교(比較) (A Study on the Mathematical Models for determining the Economic Inspection Plan and It's Characteristics)

  • 이상용
    • 품질경영학회지
    • /
    • 제7권2호
    • /
    • pp.17-21
    • /
    • 1979
  • There are many kinds of the mathematical models which are developed for choosing the economic inspection plan. The aim of this paper is to classify these mathematical models, and to examine their characteristics. The mathematical models for choosing the economic inspection plan can be classified into three groups. The first of it is the break-even analysis, the second group of the model is to choose the inspection plan so as to minimize total sampling inspection cost function, and the third group of it is the model to choose the inspection plan which maximize the profit function of the sampling inspection. As a result of examining the characteristics of this classified group of the models the model to choose the inspection plan which minimize total sampling inspection cost is more economical than the other models.

  • PDF

품질검사의 불완전성과 회수물류를 고려한 시스템 다이나믹스 재고 모형 (System Dynamics Inventory Model with Imperfect Inspection and Reverse Logistics)

  • 유승호;박명섭
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2006년도 추계학술대회
    • /
    • pp.391-402
    • /
    • 2006
  • Most previous studies considering inventory models for imperfect quality assumed that defective items could be completely detected by inspection and fixed before delivery to customers. This makes it difficult to adopt their research results to practice. This study reduces the assumption of perfect inspection, and presents an inventory model considering reverse logistics caused by imperfect inspection. System dynamics model is used to describe complex and dynamic problem and to show the effect of imperfect inspection on profit by simulation. Then, this article provides a guideline for the inspection policy which provides the maximum profit.

  • PDF

일반용 전기설비 안전점검의 전기화재 예방효과에 대한 정량적 분석 (Quantitative Analysis on the Electrical Fire Preventive Effect of Safety Inspection for Electrical Facilities for General Use)

  • 김택희;유재근;전정채
    • 전기학회논문지P
    • /
    • 제64권2호
    • /
    • pp.45-49
    • /
    • 2015
  • This paper presents a quantitative analysis method to quantitatively indicate a electrical fire preventive effect of safety inspection for electrical facilities for general use. Logic model was developed based on whether enforcement of safety inspection for electrical facilities, and then the developed analysis model was converted to hydraulic model by using mathematical logic. The electrical fire preventive effect of safety inspection for electrical facilities was quantitatively calculated by applying electrical safety inspection results and fire statistics for five years to the developed hydraulic model. The results show that electrical fire preventive effects of 5,542 cases on annual average for five years.

기계고장을 고려한 생산및 품질검증 정책

  • 이창환
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.298-301
    • /
    • 1996
  • This paper addresses the effects of an imperfect production process on the optimal production quantity and quality inspection policies. The system is assumed to deteriorate during the production process. The results are either defective products or machine breakdown whether multiple quality inspection is worth or not. Furthermore, when multiple inspection policy is adopted, the optimal inspection schedule is shown to be equally spaced throughout the production cycle. Exact solution and approximation of the optimal production quantity and approximation of the optimal number of inspection are provided. Finally, to better understand the model of this paper, comparisons between this model and classical EMQ model are provided.

  • PDF

A BAYESIAN APPROACH TO THE IMPERFECT INSPECTION MODEL

  • Park, Choon-Il
    • Journal of applied mathematics & informatics
    • /
    • 제6권2호
    • /
    • pp.589-598
    • /
    • 1999
  • Classification errors are included in sampling -with -re-placement model where items are sampled from a Bernoulli process. Bayesian imperfect inspection model is considered. In addition con-jugate prior and predctive densities for imperfect inspection model are obtained.

다항목 검사장비를 위한 COO 모형 연구 (Cost of Ownership Model for the Inspection Equipment of Multiple Quality Attributes)

  • 손소영;문형욱;홍철기
    • 대한산업공학회지
    • /
    • 제27권3호
    • /
    • pp.297-304
    • /
    • 2001
  • Procurement decisions for inspection equipment are often made heavily based on the initial purchase price instead of the effects of inspection cost, equipment calibration and utilization over the lifetime. Cost of ownership(COO) models that take into account all of these cost factors together have been developed focusing on a single quality characteristic. In modern manufacturing environment, inspection equipment often can deal with more than one quality characteristic simultaneously. In this paper, we propose the revised COO model for the economic evaluation of the inspection equipment that can accommodate multiple quality characteristics. We also employ an engineering economy model to compare equipments with different life span. Software is developed for handy comparison of the COO of alternative equipments along with sensitivity analysis far the optimal procurement decision.

  • PDF

3D 객체 모델을 활용한 점검 정보입력 및 표출에 관한 연구 (A Study on utilizing 3D model to input and display the information of structural inspection)

  • 장정환;안호현;박상덕;강동현
    • 한국BIM학회 논문집
    • /
    • 제3권3호
    • /
    • pp.1-8
    • /
    • 2013
  • In general, a two-dimensional platform were used to manage the structural inspection information. But we performed a study on utilizing 3D model to input and display the information of structure inspection. Coarse and Fine model of structure were used to input the information. 3D model combined with database built from record plan and field inspections data and rating will provide more intuitive and effective environment for inspectors in bridge maintenance.

A Sampling Inspection Plan with Human Error: Considering the Relationship between Visual Inspection Time and Human Error Rate

  • Lee, Yong-Hwa;Hong, Seung-Kweon
    • 대한인간공학회지
    • /
    • 제30권5호
    • /
    • pp.645-650
    • /
    • 2011
  • Objective: The aim of this study is to design a sampling inspection plan with human error which is changing according to inspection time. Background: Typical sampling inspection plans have been established typically based on an assumption of the perfect inspection without human error. However, most of all inspection tasks include human errors in the process of inspection. Therefore, a sampling inspection plan should be designed with consideration of imperfect inspection. Method: A model for single sampling inspection plans were proposed for the cases that visual inspection error rate is changing according to inspection time. Additionally, a sampling inspection plan for an optimal inspection time was proposed. In order to show an applied example of the proposed model, an experiment for visual inspection task was performed and the inspection error rates were measured according to the inspection time. Results: Inspection error rates changed according to inspection time. The inspection error rate could be reflected on the single sampling inspection plans for attribute. In particular, inspection error rate in an optimal inspection time may be used for a reasonable single sampling plan in a practical view. Conclusion: Human error rate in inspection tasks should be reflected on typical single sampling inspection plans. A sampling inspection plan with consideration of human error requires more sampling number than a typical sampling plan with perfect inspection. Application: The result of this research may help to determine more practical sampling inspection plan rather than typical one.

홉필드 모델을 이용한 J-리드 검사 경로 생성 (Path planning of the J-lead inspection using hopfield model)

  • 이중호;차영엽
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1997년도 한국자동제어학술회의논문집; 한국전력공사 서울연수원; 17-18 Oct. 1997
    • /
    • pp.1774-1777
    • /
    • 1997
  • As factory automation is required, using the vision system is also essential. Especially, the pateh planning of parts with J-lead on PCB plays a import role of whole automation. Path planning is required because J-lead is scatteed compaed to L-lead on PCB. Therefore, in this paper, we propose path planning of part inspection with J-lead to use Hopfield Model(TSP : Traveling Salesman Problem). Then optical system suited to J-lead inspection is designed and the algorithm of J-lead solder joint and part inspection is proposed.

  • PDF