• Title/Summary/Keyword: initial setting time

Search Result 223, Processing Time 0.03 seconds

Effect of Carbon Dioxide-reduced Cement on Properties of Lightweight-foamed Concrete (이산화탄소 저감형 시멘트 함량에 따른 경량기포 콘크리트의 물성평가)

  • Im, Donghyeok;Lee, Won-Ki
    • Journal of Environmental Science International
    • /
    • v.29 no.6
    • /
    • pp.605-612
    • /
    • 2020
  • To improve the initial strength and stability of lightweight-foamed concrete, which shows suitable sound absorption and insulation characteristics, the effect of CO2-reduced cement on the properties of the concrete was investigated. Various mixing ratios were applied by substituting a certain amount of slag and Calcium Sulfo Aluminate (CSA) in CO2-reduced Ordinary Portland Cement (OPC) and the physical properties of the samples were examined using the Korean Standard. The kiln temperatures of the CSA were 100-200℃ ; these values are lower than those of OPC and can lead to energy saving. In addition, the low limestone content reduces greenhouse gas emissions by 20 %. Adding a small amount of CSA in OPC content activates Ca-Al-H2-based hydrates, and the initial compressive strength of the concrete is improved. As the CSA content increased, the thermal conductivity of the concrete decreased by up to 8% compared to plain concrete, thus indicating an improvement in its insulation. Therefore, the settlement stability was improved as the addition of CSA shortened the setting time.

Analog Celluar Nonlinear Circuits-Based Dynamic Programming with Subgoal Setting (서브 골 설정에 의한 아날로그 셀룰라 비선형 회로망 기반 동적계획법)

  • Kim, Hyong-Suk;Park, Jin-Hee;Son, Hong-Rak;Lee, Jae-Chul;Lee, Wang-Hee
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.10
    • /
    • pp.582-590
    • /
    • 2000
  • A fast optimal path planning algorithm using the analog Cellular Nonlinear Circuits(CNC) is proposed. The analog circuits based optimal path planning is very useful since most of the optimal path planning problems require real time computation. There has already been a previous study to implement the dynamic programming with analog circuits. However, it could not be applied for the practically large size of problems since the algorithm employs the mechanism of reducing its input current/voltage by the amount of cost, which causes outputs of distant cells to become zero. In this study, a subgoal-based dynamic programming algorithm to compute the optimal path is proposed. In the algorithm, the optimal paths are computed regardless of the distance between the starting and the goal points. It finds subgoals starting from the starting point when the output of the starting cell is raised from its initial value. The subgoal is set as the next initial position to find the next subgoal until the final goal is reached. The global optimality of the proposed algorithm is discussed and two different kinds of simulations have been done for the proposed algorithm.

  • PDF

An Initial clinical Experience of Nursing Students (간호학생의 첫 임상실습 경험에 대한 연구)

  • Go, Seong-Hui;Kim, Gi-Mi
    • The Korean Nurse
    • /
    • v.33 no.2
    • /
    • pp.59-72
    • /
    • 1994
  • This study was conducted to identify an initial clinical experience of nursing students, so to better understanding to students' experience in clinical setting. The study subjects were 39 nursing students working in C department of nursing in C city. This study was approached by phenomenological method, collected data were analyzed by Colaizzi's method. The results were followed. From the protocol, 236 significant statements were organized into 56 formulated meanings. From formulated meanig, 27 themes were identified, organized into 13 theme clusters, and then into 6 categories. Theose nursing students experienced $\mathbb{\ulcorner}$tension$\mathbb{\lrcorner}$ in adjusting themselves to new clinical settings, $\mathbb{\ulcorner}$fear and anxiety$\mathbb{\lrcorner}$ in using unskillful nursing skills. They also went through $\mathbb{\ulcorner}$stress> by difficulties in applying their knowledge and skill to nursing practice, in lack of nursing knowledge and skill, in dealing with making interpersonal relationship with clinical staffs, in insufficiency of clinical instructions and in role ambiguity among nursing students. Physical $\mathbb{\ulcorner}$fatigue$\mathbb{\lrcorner}$ and $\mathbb{\ulcorner}$disappointment and doubt$\mathbb{\lrcorner}$ by the difference between reality and expectation caused by clinical experience. However, clinical experience enabled nursing students to enhance their understanding of human beings, learning, their satisfaction. to nursing practice, to identify the confirmation of nursing identity, so to gain $\mathbb{\ulcorner}$sense of accomplishment$\mathbb{\lrcorner}$. The results of this study are to use as basic data for students attending clinical experience for the first time.

  • PDF

Parameter analysis in Fast Global Registration to improve accuracy and speed (고속 전역 정합법에서 정밀도 및 속도 향상을 위한 매개변수 분석)

  • Lim, Sukhyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.6
    • /
    • pp.799-806
    • /
    • 2021
  • The transforming process of point clouds with its local coordinates into a global coordinate is called registration. In contrast to the local registration which takes a long time to calculate and performs precision registration after initial rough positioning, the global registration calculates the corresponding points for registration and performs at once, so it is generally faster than the local registration, and can perform it regardless of the initial position. Among the global methods, the Fast Global Registration is one of the widely used methods due to its fast performance. However, lots of parameters should be set to increase the registration accuracy and speed. In this paper, after analyzing and experimenting the parameters and propose parameters that work effectively in actual registration. The proposed result will be helpful in setting the direction when it is necessary to use the Fast Global Registration method.

Study on ALDT Optimal Setting Considering Retention Level of Repair Items (수리품목 보유수준을 고려한 ALDT 최적화 설정방안 연구)

  • Jun, Joon-Hyung;Hwang, Kyoung-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.269-275
    • /
    • 2020
  • RAM of elements to support weapon systems is conducted at the initial development phase and standard is suggested to accomplish strategy requirement performance from a design spec. Operational availability is a key point of the military's ability to ensure combat readiness and to win the battle. In the weapon system development phase, operational availability is used as a development standard. The military provides ALDT, operation and standby time, which are elements of operational availability. ALDT is a key element of operational availability that must be maintained for combat readiness, as it depends on the aging of a weapon system, maintenance policies and geographical conditions. Operational Availability to be set at the development phase has many differences from the operational availability that is analyzed in the actual operational phase because ALDT is applied as a simple assumption. In the paper, we analyzed ALDT applying the decision tree method through failure data acquired from initial operation. Through this study, we have devised the optimal ALDT setting method to achieve operational availability about operation when the weapons system is unstable.

Application of Flood Discharge for Gumgang Watershed Using GIS-based K-DRUM (GIS기반 K-DRUM을 이용한 금강권 대유역 홍수유출 적용)

  • Park, Jin-Hyeog;Hur, Young-Teck
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.1
    • /
    • pp.11-20
    • /
    • 2010
  • The distributed rainfall-runoff model which is developed in the country requires a lot of time and effort to generate input data. Also, it takes a lot of time to calculate discharge by numerical analysis based on kinematic wave theory in runoff process. Therefore, most river basins using the distributed model are of limited scale, such as small river basins. However, recently, the necessity of integrated watershed management has been increasing due to change of watershed management concept and discharge calculation of whole river basin, including upstream and downstream of dam. Thus, in this study, the feasibility of the GIS based physical distributed rainfall-runoff model, K-DRUM(K-water hydrologic & hydraulic Distributed RUnoff Model) which has been developed by own technology was reviewed in the flood discharge process for the Geum River basin, including Yongdam and Daecheong Dam Watersheds. GIS hydrological parameters were extracted from basic GIS data such as DEM, land cover and soil map, and used as input data of the model. Problems in running time and inaccuracy setting using the existing trial and error method were solved by applying an auto calibration method in setting initial soil moisture conditions. The accuracy of discharge analysis for application of the method was evaluated using VER, QER and Total Error in case of the typhoon 'Ewiniar' event. and the calculation results shows a good agreement with observed data.

Examination of the Characteristics of Mortar Mixed with Boron Compounds Presenting Various Levels of Alkalinity (다양한 알칼리도를 가진 붕소화합물이 혼입된 모르타르의 특성 검토)

  • Lee, Binna;Lee, Jong-Suk;Min, Jiyoung;Lee, Jang Hwa
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.85-92
    • /
    • 2017
  • This study examines the characteristics of mortar mixed with various boron compounds. The adapted boron compounds, classified into acid, slightly alkaline and strongly alkaline with respect to the value of the pH are acid-based boron (AA), low-alkaline-based boron (AB), and high-alkaline-based boron (HB). The pH test, setting test and compressive strength test are performed to evaluate the physical and chemical properties of mortar, and SEM imaging is conducted to analyze the microstructure of mortar. The measured pH shows that the specimens mixed with boron compounds have lower pH than the basic mortar without boron and that loss of pH occurs according to time. The setting test reveals that the initial and final setting times of the specimens mixed with boron compounds occur later than the basic mortar, which disagrees slightly with the previous literature stating that the setting time can be shortened according to the alkalinity. From the compressive strength test and SEM imaging results, it is recommended to determine the optimal content of boron considering type and composition of the boron compounds.

The Properties of Multi-Component Blended High Fluidity Mortar (다성분계 고유동 모르타르의 특성)

  • Kim, Tae-Wan;Kang, Choonghyun;Bae, Ju-Ryong;Kim, In-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.124-132
    • /
    • 2018
  • This research presents the results of an investigation on the characteristic of multi-component blended high fluidity mortars. The binder was blended ordinary Portland cement(OPC), ground granulated blast furnace slag(GGBFS), calcium sulfoaluminate(CSA) and ultra rapid setting cement(URSC). The GGBFS was replaced by OPC from 30%(P7 series), 50%(P5 series) and 70%(P3 series), CSA and URSC was 10% or 20% mass. The superplasticizer of polycarboxylate type were used. A constant water-to-binder ratio(w/b)=0.35 was used for all mixtures. Test were conducted for mini slump, setting time, V-funnel, compressive strength and drying shrinkage. According to the experimental results, the contents of superplasticizer, V-funnel and compressive strength increases with an increase in CSA or URSC contents for all mixtures. Moreover, the setting time and drying shrinkage ratio decrease with and increase in CSA or URSC. CSA decreased dry shrinkage but URSC had less effect. However, the mixed binders of CSA and URSC had a large effect of reducing drying shrinkage by complementary effect. This is effective for improving the initial strength of URSC, and CSA is effective for the expansion and improvement of long-term strength.

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (열차운행속도 상승에 따른 레일마모 및 캔트조정 연구)

  • Shin, Gil-Cheol;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1121-1128
    • /
    • 2007
  • Subway routes $1{\sim}4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF