• Title/Summary/Keyword: indirect costs

Search Result 245, Processing Time 0.048 seconds

A Comparison Study of Cost Components to Estimate the Economic Loss from Foodborne Disease in Foreign Countries (국외 식중독으로 인한 손실비용 추정을 위한 항목 비교 연구)

  • Hyun, Jeong-Eun;Jin, Hyun Joung;Kim, Yesol;Ju, Hyo Jung;Kang, Woo In;Lee, Sun-Young
    • Journal of Food Hygiene and Safety
    • /
    • v.36 no.1
    • /
    • pp.68-76
    • /
    • 2021
  • Foodborne outbreaks frequently occur worldwide and result in huge economic losses. It is the therefore important to estimate the costs associated with foodborne diseases to minimize the economic damage. At the same time, it is difficult to accurately estimate the economic loss from foodborne disease due to a wide variety of cost components. In Korea, there are a limited number of analytical studies attempting to estimate such costs. In this study we investigated the components of economic cost used in foreign countries to better estimate the cost of foodborne disease in Korea. Seven recent studies investigated the cost components used to estimate the cost of foodborne disease in humans. This study categorized the economic loss into four types of cost: direct costs, indirect costs, food business costs, and government administration costs. The healthcare costs most often included were medical (outpatient) and hospital costs (inpatient). However, these cost components should be selected according to the systems and budgets of medical services by country. For non-healthcare costs, several other studies considered transportation costs to the hospital as an exception to the cost of inpatient care. So, further discussion is needed on whether to consider inpatient care costs. Among the indirect costs, premature mortality, lost productivity, lost leisure time, and lost quality of life/pain, grief and suffering costs were considered, but the opportunity costs for hospital visits were not considered in any of the above studies. As with healthcare costs, government administration costs should also be considered appropriate cost components due to the difference in government budget systems, for example. Our findings will provide fundamental information for economic analysis associated with foodborne diseases to improve food safety policy in Korea.

Economic Evaluation of Underground Parking Lot PC Structural System that is Suitable for Long-Life Housing (장수명주택에 적합한 지하주차장 PC구조시스템의 경제성분석에 관한 연구)

  • Jo, Min-Joo;Kim, Jong-Sung
    • Journal of the Korean housing association
    • /
    • v.26 no.2
    • /
    • pp.103-110
    • /
    • 2015
  • Precast Concrete (PC) construction method can be the one that is suitable for long-life housing due to its merit in respect of maintenance and durability based on crack-free from mass production with indirect construction cost-saving-effect due to shortening construction period comparing to the conventional construction method, but it has the problem that causes the raise of direction construction costs. So, this study analyzed its economic feasibility of PC method whose maintenance and durability are excellent for underground parking lot of apartment house for accomplishing cost-saving long-life housing by applying the various structural system. In evaluation of unit module structural system, two-way PC system requires 10 to 28% more costs for frame work than RC rigid frames, and, one-way PC system 98~112%. Although it varies depending on the method, the costs are similar to RC rigid frame structure, provided a proper method is adopted. Also, Model 11, which was most economical in the evaluation, was applied to an real parking lot and about 2 to 6% of construction costs was reduced than RC rigid frames. This seems to be because, although PC system has a higher production cost, introduction of P.S (prestress) reduces member depth and, therefore, height, as well as the number of members per unit module.

An Analysis of Influential Factors and their Prioritization in Association with the Loss from Construction Disasters with a Focus on Uninsured Categories (건설재해손실 영향요인 및 우선순위 분석 - 비보험비용 항목을 중심으로 -)

  • Yang, Yong Koo;Kim, Byung Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.23-34
    • /
    • 2014
  • With a view to analyzing the influential factors and their prioritization in association with the loss from construction disasters, this study has presented relative weighted value and importance for each category of loss by making a systematic classification of costs for non-insured categories (indirect costs) and conducting AHP analysis based on results of a survey of specialists. Through the study, first, I have divided the larger classification of loss factors into human loss factor, financial loss factor, special cost factor, and managerial loss factor, and, second, have presented prioritization of loss categories by allotting scores based on weighted values after calculating weighted value through pairwise comparison of loss levels. Based on these results of the study, we should be able to qualitatively calculate the loss costs that construction disasters inflict on business, promote rational decision-making and efficiency in spending related to a disaster, and compare it against safety investment designed to reduce disaster loss from the perspective of business strategy.

Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges (불확실성을 고려한 철도 교량의 LCC분석 시스템 개발)

  • Cho, Choong-Yuen;Sun, Jong-Wan;Kim, Lee-Hyeon;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A Study on the Effective Management of Public Rental Housing Maintenance

  • JANG, In-Sun;KIM, Sun-Ju
    • The Journal of Economics, Marketing and Management
    • /
    • v.10 no.5
    • /
    • pp.7-14
    • /
    • 2022
  • Purpose: This study discusses efficient operation plans in terms of public rental housing maintenance in terms of LH, a major supplier. Research design, data, and methodology: After reviewing problems related to the maintenance and management of public rental housing discussed in several previous studies, problems in technology setting for repair maintenance costs for public rental housing, lack of public assistance for maintenance and management of public rental housing, management of housing funds, and lack of role of local governments in the supply and repair of public rental housing were derived. Based on this, the researcher conducted using literature research methods to present relevant improvement measures based on reasonable arguments. Results: this study presented four operational plans related to (1) realization of repair costs for public rental housing, (2) a public subsidy system for covering the maintenance costs for public rental housing, (3) efficient operation of the Housing City Fund, and (4) establishment of the public rental housing. This study aims to provide a foundation for the qualitative growth of the domestic public rental housing system. Conclusions: With this study, it is expected that social interest in maintenance of public rental housing centered on LH will be amplified to improve the quality of maintenance problems of public rental housing.

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF

Development of a Hospital Service-based Costing System and Its Application (병원서비스별 원가분석모형의 개발과 적용)

  • 박하영
    • Health Policy and Management
    • /
    • v.5 no.2
    • /
    • pp.35-69
    • /
    • 1995
  • The managerial environment of hospitals in Korea characterized by low levels of medical insurance fees is worsening by increasing government regulations as to the utilization of medical services, rising costs of labor, material, and medical equipments, growing patient expectations concerning the quality of services, and escalating competitions among large hospitals in the market. Hospitals should seek for their survival strategies in this harsh environment and they should have information about costs of their products in doing so. However, it has not been available due to the complexity of the production process of hospital services. The objectives of this study were to develop a service-based cost accounting model and to apply the developed model to a study hospital to obtain cost information of hospital services. A model commonly used for the job-order product cost accounting in the manufacturing industry was modified for the use in hospitals in Korea. Actual costs, instead of standard costs, incurred to produce a unit of services during a given period of time were estimated in the model. Data required to implement the model included financial information, statistics for the allocation of supportive cost center costs to final cost centers, statistics for the allocation of final cost center costs to services, and the volume of each services charged to patients during a study period. The model was executed using data of a university teaching hospital located in Seoul for the fiscal year 1992. Data for financial information, allocation statistics fo supportive service costs, and the volume of services, most of them in electronic form, were available to the study. Data for allocation statistics of final cost center costs were collected in the study. There were 15 types of evaluation and management service, 2, 923 types of technical service, and 2, 608 types of drug and material service charged to patients in the study hospital during the fiscal year 1992. Labor costs of each of seven types of pesonnel, material costs of 611 types of drugs and materials, and depreciation costs of 212 types of medical equipments, miscellaneous costs, and indirect costs incurred in producing a unit of each services were estimated. Medical insurance fees for basic services such as evaluation and management of inpatients and outpatients, injection, and filling prescriptions, and for operating procedures were found to be set lower than costs. Infrequent services which use expensive medical equipments showed negative revenuse as well. On the other hand, fees for services not covered by the insurance such as CT, MRI and Sonogram, and for laboratory tests were higher than costs. This study has a significance in making it possible for a hospital to obtain cost information for all types of services which produced income based on all types of expenses incurred during a given period of time. This information can assist the management of a hospital in finding an effective cost reduction strategy, an efficient service-mix strategy under a given fee structure, and an optimum strategy for within-hospital resource allocations.

  • PDF

Core Factors Governing Manufacturing Procedures and Systems (의류 생산 시스템을 지배하는 핵심 요소들에 대한 고찰)

  • Lee, Duck-Weon;Lim, Ho-Sun;Shim, Woo-Sub
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.33 no.12
    • /
    • pp.1910-1923
    • /
    • 2009
  • This paper reviews four factors involved in apparel and textile manufacturing procedures under international economic fluctuation. This work will be helpful to evaluate the efficiency of global manufacturing systems. Production costs including direct costs related to material and labor costs, and indirect costs associated with manufacturing running ones are significantly correlated to diverse visible and invisible elements such as infrastructure and the labor skills of foreign manufacturing areas, which might create an apparent difference in production costs. Manufacturers can consider how to improve the efficiency of manufacturing systems through a review of the co-relationship between manufacturing procedures and four factors such as manufacturing systems, production outsourcing types, manufacturing locations, and production costs in detail. In addition, the four factors are the core parameters of determining or contributing to the efficiency of a production schedule that is ultimately associated with the supply chain management (SCM) to efficiently conduct Quick Response (QR).

Therapeutic lumbar facet joint nerve blocks in the treatment of chronic low back pain: cost utility analysis based on a randomized controlled trial

  • Manchikanti, Laxmaiah;Pampati, Vidyasagar;Kaye, Alan D.;Hirsch, Joshua A.
    • The Korean Journal of Pain
    • /
    • v.31 no.1
    • /
    • pp.27-38
    • /
    • 2018
  • Background: Related to escalating health care costs and the questionable effectiveness of multiple interventions including lumbar facet joint interventions, cost effectiveness or cost utility analysis has become the cornerstone of evidence-based medicine influencing coverage decisions. Methods: Cost utility of therapeutic lumbar facet joint nerve blocks in managing chronic low back pain was performed utilizing data from a randomized, double-blind, controlled trial with a 2-year follow-up, with direct payment data from 2016. Based on the data from surgical interventions, utilizing the lowest proportion of direct procedural costs of 60%, total cost utility per quality adjusted life year (QALY) was determined by multiplying the derived direct cost at 1.67. Results: Patients in this trial on average received $5.6{\pm}2.6$ procedures over a period of 2 years, with average relief over a period of 2 years of $82.8{\pm}29.6$ weeks with $19{\pm}18.77$ weeks of improvement per procedure. Procedural cost for one-year improvement in quality of life showed USD $2,654.08. Estimated total costs, including indirect costs and drugs with multiplication of direct costs at 1.67, showed a cost of USD $4,432 per QALY. Conclusions: The analysis of therapeutic lumbar facet joint nerve blocks in the treatment of chronic low back pain shows clinical effectiveness and cost utility at USD $2,654.08 for the direct costs of the procedures, and USD $4,432 for the estimated overall cost per one year of QALY, in chronic persistent low back pain non-responsive to conservative management.