• Title/Summary/Keyword: in-site test

Search Result 3,231, Processing Time 0.036 seconds

Construction and Data Analysis of Test-bed by Hyperspectral Airborne Remote Sensing (초분광 항공원격탐사 테스트베드 구축 및 시험자료 획득)

  • Chang, Anjin;Kim, Yongil;Choi, Seokkeun;Han, Dongyeob;Choi, Jaewan;Kim, Yongmin;Han, Youkyung;Park, Honglyun;Wang, Biao;Lim, Heechang
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.2
    • /
    • pp.161-172
    • /
    • 2013
  • The construction of hyperspectral test-bed dataset is essential for the effective performance of hyperspectral image for various applications. In this study, we analyzed the technical points for generating of optimal hyperspectral test-bed site for hyperspectral sensors and the efficiency of hyperspectral test-bed site. In this regard regions we analyzed existing construction techniques for generating test-bed site in domestic and foreign, and designed the test-bed site to acquire images from the airborne hyperspectral sensor. To produce a reference data from the image of constructed test-bed site, this study applied vicarious correction as a pre-processing and analyzed its efficiency. The result presented that it was ideal to use tarp for the vicarious correction, but it is possible to use the materials with constant spectral reflectance or with relatively low variance of spectral reflectance. The test-bed data taken in this study can be employed as the reference of domestic and foreign studies for hyperspectral image processing.

Effective Utilization of Waste Landfill by Dynamic Compaction Pilot Test (동다짐에 의한 폐기물 매립장의 유효활용에 관한 연구)

  • Chun, Byung-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.1 no.1
    • /
    • pp.71-78
    • /
    • 2000
  • In this study, the evaluation for effective utilization of waste landfill was performed by field test to use waste landfill as construction site(Nangido in Seoul). This site had been formed by dredging the household waste, building debris and industrial waste for fifteen years(78'3~93'3). The site where dynamic compaction test was divided by 4 yards. Yard-1, 2 were not eliminated widening of cover soil and Yard-3, 4 were eliminated it. Dynamic Compaction Pilot Test was carried out by the 15ton heavy tamper with drop height of 20m in Yard-1, 3 and with drop height of 15m in Yard-2, 4. We evaluated the compaction efficiency, optimum compaction number and noise vibration through field test, monitoring. As a result, if the countermeasures against vibration and noise by the method utilize, the dynamic compaction method is suitable for using in waste landfill as a construction site among the ground improvement method.

  • PDF

Preliminary Investigation for Feasibility of Wave Energy Converters and the Surrounding Sea as Test-site for Marine Equipment

  • Park, Jin-Yeong;Baek, Hyuk;Shim, Hyungwon;Choi, Jong-Su
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.5
    • /
    • pp.351-360
    • /
    • 2020
  • Of late, demand for test sites for marine equipment such as ASV, AUV, ROV, and various underwater sensors is increasing. The authors have focused on an oscillating water column (OWC), which is being constructed near Chagwido Island Jeju, as one of the test-sites. The main objective of the OWC is to produce wave energy and develop technologies. It has been built in the sea approximately 1 km off the coast. It has berth accommodation and some rooms that can be used as laboratories. To investigate the feasibility of its usage as a test site for marine equipment, we acquired bathymetric data around the OWC by using a multi-beam echo sounder and a single-beam scanning sonar. The accessibility of the OWC from nearby ports and the use of support vessels or ships were also investigated. 3D point cloud data from the multi-beam echo sounder and 2D acoustic images from the scanning sonar are expected to be used as references for identifying changes over time. In addition, through these experiments, we derived a procedure to use this facility as a test site by using the IDEF0 functional modelling method. Based on this preliminary investigation and previously reported examples, we determined the general conditions and preferences for evaluating the performance of various marine equipment heuristically. Finally, we developed five applications that were derived from this investigation.

Test Process Site Construction of X-Forms Base UI Software (X-Forms 기반 UI 소프트웨어의 테스트 프로세스 사이트 구축)

  • Lee, Seung-Hyuk;Han, Jung-Soo
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.591-594
    • /
    • 2007
  • We construct the test process site about X-Internet and X-Forms base software. This software is developed with X-Forms base web UI tool. Basically, this software is operated on the Client. Even in operating process, this kind of software could be updated because of user's request, improvement in efficiency, reformation and addition in functions and so on. In order to test a updated software, V-Model will be extended and transformed test process will be proposed. This proposed test process is starting with test plan which defines test object and activities for attainment of process's goal. The following steps are recognizing testcase and data, analysis and design for constructing process environment, setting forth testcase in detail, realization of test methodology, and the arrangement of results. This paper will be helpful to build more efficient process site by managing and recording the test process.

  • PDF

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System (온라인 및 오프라인 PD 모니터링에 관한 연구 동향)

  • Choo, Jong-Hoon;Hong, Chang-Il;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Comparative Study on the Quantity Economic Analysis of Apartment Frames Using SDS Result of Dynamic Centrifuge Test at Pile Foundation (말뚝기초의 동적실험결과를 사용한 아파트 골조의 경제성 비교분석)

  • Kim, Sang-Yeon;Park, Jong-Bae;Park, Yong-Boo
    • Land and Housing Review
    • /
    • v.6 no.3
    • /
    • pp.147-152
    • /
    • 2015
  • Site coefficient and amplification factor of current domestic Seismic Design Code based on American Seismic Code, have no consideration for the domestic ground condition in which the base rock is normally placed within 30m form the surface. By previous studies, the measured spectral acceleration of the result of dynamic centrifugal test and analysis was smaller than the design spectral acceleration for the period over 1.5 sec. Accordingly, in this study structural analysis and design using dynamic centrifugal test result for pile foundation were achieved, and the quantity of concrete and reinforcement of wall frame was compared with each other. Comparison results of cost using KBC the design spectral acceleration of SC, SD site and SDS, the quantity of reinforcement using SDS for SD site was 17~23% smaller than using the design code SD site.

A Conceptual Algorithm for Determining the Spacing of Standard Penetration Test Spots. (표준관입시험 간격 결정을 위한 개념적 알고리즘)

  • Habimana, Gilbert;Lee, Donghoon;Han, Kyung-Bo;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.185-186
    • /
    • 2015
  • The Standard penetration test determines the type of soil according to soil bearing capacity, and this classifies the subsoil into many layers. Construction project managers are willing to know the depth of the present types of subsoil on site in order to make plans on earthwork stage during excavation. However the standard penetration test may not provide accurate information on subsoil type due to incorrect spacing. To solve this problem, this study propose a conceptual algorithm for determining the spacing of standard penetration test spots to essentially tests relevant locations on which to be applied the standard penetration test. This provides the acquirement of the accurate layered model volume of earthwork revised into geological columnar section. This algorithm will determine the appropriate standard penetration test spots spacing on a given size of site to optimize the accuracy of the earthwork volume, time and cost.

  • PDF

Consideration of Geosynthetics Chemical Resistance Test for Long-Term Performance Evaluation (장기성능 평가를 위한 토목섬유 화학저항성 시험 고찰)

  • Jeon, Han-Yong;Jang, Yeon-Soo;Gong, Hak-Bong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.222-232
    • /
    • 2009
  • In this study, the real site test conditions were considered and applied to suggest the improved test method for geosynthetics chemical resistance. For this, index and performance tests were done to specify and regulate the more approached test method. Accelerated model by Arrhenius equation was applied to interpretate the experimental data. Through analysis and comparison the overall experimental results, we could suggest the possibility and setup the advanced chemical resistance test method for geosynthetics.

  • PDF