• Title/Summary/Keyword: in-construction monitoring

Search Result 1,716, Processing Time 0.03 seconds

Prediction and Assessment on Consolidation Settlement for Soft Ground by Hydraulic Fill (준설매립 연약지반에 대한 압밀침하 예측 및 평가)

  • Jeon, Je-Sung;Koo, Ja-Kap;Oh, Jeong-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.9
    • /
    • pp.33-40
    • /
    • 2008
  • This paper describes the performance of ground improvement project using prefabricated vertical drains of condition, in which approximately 10m dredged fill overlies original soft foundation layer in the coastal area composed of soft marine clay with high water content and high compressibility. From field monitoring results, excessive ground settlement compared with predicted settlement in design stage developed during the following one year. In order to predict the final consolidation behavior, recalculation of consolidation settlements and back analysis using observed settlements were conducted. Field monitoring results of surface settlements were evaluated, and then corrected because large shear deformation occurred by construction events in the early stages of consolidation. To predict the consolidation behavior, material functions and in-situ conditions from laboratory consolidation test were re-analyzed. Using these results, height of additional embankment is estimated to satisfy residual settlement limit and maintain an adequate ground elevation. The recalculated time-settlement curve has been compared with field monitoring results after additional surcharge was applied. It might be used for verification of recalculated results.

Signalling System Standardization for Linear Induction Motor Type Light Rail Transit (선형유도모터형식 경전철 신호제어시스템 표준사양 연구)

  • Cho, Bong-Kwan;Hwang, Hyeon-Chyeol;Cho, Hong-Shik;Hong, Jai-Sung;Ryu, Sang-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1183-1184
    • /
    • 2007
  • Light Rail Transit (LRT) is optimized vehicle system for complex urban circumstance. LRT systems have many merits such as improved accuracy and safety. There are many LRT systems such as monorail, tram, automated guideway transit, linear induction motor propulsion and so on. These systems have been operated in Japan and other advanced countries. In Korea, local government has many projects to apply the advanced LRT system. But there are no standards regulation, performance test regulation and construction regulation for monorail system, linear induction motor system and tram in Korea. We expect that standardization brings economical construction and safety. The linear induction motor system has been usually applied to subway in Japan and ART(Advanced Rapid Transit) in Canada. In Korea, the linear induction motor system has been adopted for Yong-In LRT and currently under construction. This paper presents signalling system and TCMS(train control and monitoring system) of linear induction motor system.

  • PDF

Sequential prediction of TBM penetration rate using a gradient boosted regression tree during tunneling

  • Lee, Hang-Lo;Song, Ki-Il;Qi, Chongchong;Kim, Kyoung-Yul
    • Geomechanics and Engineering
    • /
    • v.29 no.5
    • /
    • pp.523-533
    • /
    • 2022
  • Several prediction model of penetration rate (PR) of tunnel boring machines (TBMs) have been focused on applying to design stage. In construction stage, however, the expected PR and its trends are changed during tunneling owing to TBM excavation skills and the gap between the investigated and actual geological conditions. Monitoring the PR during tunneling is crucial to rescheduling the excavation plan in real-time. This study proposes a sequential prediction method applicable in the construction stage. Geological and TBM operating data are collected from Gunpo cable tunnel in Korea, and preprocessed through normalization and augmentation. The results show that the sequential prediction for 1 ring unit prediction distance (UPD) is R2≥0.79; whereas, a one-step prediction is R2≤0.30. In modeling algorithm, a gradient boosted regression tree (GBRT) outperformed a least square-based linear regression in sequential prediction method. For practical use, a simple equation between the R2 and UPD is proposed. When UPD increases R2 decreases exponentially; In particular, UPD at R2=0.60 is calculated as 28 rings using the equation. Such a time interval will provide enough time for decision-making. Evidently, the UPD can be adjusted depending on other project and the R2 value targeted by an operator. Therefore, a calculation process for the equation between the R2 and UPD is addressed.

A Case Study of Road Upheaval caused by Slope Movement, and Verification of Reinforcement using Real-Time Monitoring (암반비탈면 활동에 의한 도로 융기현상 사례 연구 및 실시간 모니터링을 이용한 대책공법 검증)

  • Lee, Jong-Hyun;Koo, Ho-Bon;Kim, Seung-Hyun;Kim, Seung-Hee
    • The Journal of Engineering Geology
    • /
    • v.21 no.3
    • /
    • pp.221-230
    • /
    • 2011
  • The movement of rock cut slopes may result in upheaval of an adjacent road. Because most cut slopes consist of rock, road upheaval due to the movement of a cut slope is a rare phenomenon in Korea. We found that the movement of rock slopes which are heavily weathered and with strongly developed weak zones is governed by circular failure of the overall rock formation rather than by failure along discontinuities. The results of a numerical analysis revealed that the application of a ubiquitous joint model in a continuum analysis is appropriate for anisotropic rocks (e.g., schist) and for slopes for which the stability is influenced by a particular discontinuity. The results of a field investigation and numerical analyses suggest that retaining walls and anchors should be used to stabilize rock slopes and that real-time monitoring equipment should be installed to assess the reinforcing effect of the remedial measures.

Development of a Quality Analysis Program for Laser Fusion Cutting (레이저 용융 절단 해석 프로그램 개발)

  • 이성환;민헌식
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.11 no.3
    • /
    • pp.72-79
    • /
    • 2002
  • Though the laser cutting process is increasingly used in industry, a process automation and systematic database is still yet to be developed. In this study, as the fundamental step toward the construction of a reliable process expert system, a laser cutting quality monitoring/analysis system is developed based on simulations and experimental results. The relations between laser process parameters and laser cutting surface quality parameters such as kerf geometry, striation, surface roughness and dross formation are characterized and analyzed. A graphical user interface is used to visualize the results.

A Study on Development of Owner's Standard Specification Structure for Modular Building (모듈러 전문 시방서 개발을 위한 체계 구축)

  • Nam, Sunghoon;Park, Honggeon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.12-21
    • /
    • 2019
  • Specification is an important document for securing safe construction and improving quality as well as the contract document. Currently, the specifications used in modular buildings in Korea are only the construction specification, and most of the contents are used by borrowing the standard specifications of the building, so the contents of the modular buildings can not be reflected and it is contents are similar to the guideline book. The current status of domestic specification for modular buildings is affecting the quality of modular buildings. Therefore, we analyze activity through monitoring the modular process of modular buildings and analyze systematically relationship by applying IDEF modeling with analyzed activity. As result this paper proposes a structure of special specification specialized in modular building through generalization. The major classifications were divided into three stages : factory construction, transportation, and on-site installation. The specification structure was divided into 32 types of construction items from the floor slab assembly of the factory production to the joint finish of the on site installation in accordance with the opinion of experts.

A Study on the Establishment of Water Supply and Demand Monitoring System and Drought Response Plan of Small-scale Water Facilities (소규모수도시설의 공급량-수요량 모니터링 체계 구축 및 가뭄 대응 방안 연구)

  • Choi, Jung-Ryel;Chung, Il-Moon;Jo, Hyun-Jae
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.469-481
    • /
    • 2019
  • In addition to structural stabilization measures such as the construction of Sand Dam, non-structural management measures such as reasonable water demand and supply volume management are needed to prevent limited water supply damage due to drought. In this study, water supply-demand monitoring system was established for drought response in Seosang-ri basin in Chuncheon, the main source of domestic water for small water facilities. The flow rate of the stream was measured for monitoring the supply volume, and the daily flow rate was calculated by using it to calibrate the parameters of the SWAT (Soil and Water Assessment Tool). To monitor demand, the daily usage was calculated by measuring the change in the water level of the water tank. The relationship between the finally calculated daily supply and demand amount was analyzed to identify the shortage of water.

Implementation of condition monitoring system in underground utility tunnels using inductive coupler (유도성 커플러를 이용한 지하공동구의 상태감시시스템)

  • Ju, Woo-Jin;Kim, Hyun-Sik
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.8
    • /
    • pp.1597-1603
    • /
    • 2017
  • The incidence of fire in underground utility tunnel is lower than other fires, but the damage caused by fire can cause social loss due to social management paralysis as well as economic loss. Hereupon, this paper presents the results of an empirical test on the construction of the underground utility tunnel condition monitoring system using the leakage coaxial cable installed in the underground utility tunnel. For this reason, a verification test was conducted by connecting a inductive coupler 200 Mbps power line communication modem with insertion loss characteristics of $-6{\pm}2dB$ to the installed the leakage coaxial cable installed in the underground utility tunnel. As a result, We confirmed sending/receiving of IP cameras up to 500 m. Therefore, it is judged that it is possible to construct a condition monitoring system for underground utility tunnel by using the leakage coaxial cables installed in the underground utility tunnels without installing additional communication lines for data transmission.

Smart Safety Management System of Industrial Site using Zigbee Communication (Zigbee 통신을 활용한 산업현장의 스마트 안전관리 시스템)

  • Min, Ji-Hyeon;Jeong, Ga-Yeong;Ha, Hyun-Dong;Hwang, In-Tae;Kim, Nam-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.546-549
    • /
    • 2022
  • In recent years, to prevent the increase in accidents at industrial sites, various innovative technologies from the 4th industrial era have been incorporated into the construction administration to promote the advancement of safety management. As a result, smart safety management systems using intelligent monitoring that prevent and manage risks in industrial sites in real time are attracting attention. Smart safety management systems provide users with real-time, remote monitoring of factors such as noise, gas concentration fine dust concentration, building material quality, building tilt, and RFID-based worker access through sensors located everywhere. This paper presents a method for collecting and monitoring various data for smart safety management systems via Zigbee communication using Raspberry Pi.

  • PDF

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF