• Title/Summary/Keyword: improvement project

Search Result 2,170, Processing Time 0.032 seconds

Study on the Process of Setting the Boundary in the Improvement Promotion Project (재정비촉진사업 구역설정 및 평가에 관한 연구)

  • Kim, Gyeong-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.4
    • /
    • pp.76-84
    • /
    • 2008
  • In this study, we try to select the sites and set the boundary in the Improvement Promotion Project as a case analysis of Busan Metropolitan City Area. Specifically speaking, we build the database of the city improvement promotion project area, spread out collectively in the Busan City, select the possible sites recommended by the basic units of local government, and analyse these sites through applying our physical standards. The result is as follows ; The degree of advancement and driving willpower from the basic units of local government are largely effective on the improvement project, but in terms of accessibility, decrepitude, and development density, there are relatively negligible differences among the possible sites.

  • PDF

A Study on the Structural Safety of the Roof Improvement Project (슬레이트지붕 개량사업 구조안전성 검토)

  • Kang, Kyung-Soo
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.20 no.1
    • /
    • pp.19-26
    • /
    • 2018
  • The roof improvement project is being carried out under the government's leadership for the sake of national welfare. The project is to replace the asbestos slate roof with a metallic one. In this study, the structural safety of the improved roof was examined and the project guidelines were reviewed. The causes of the roof damage were investigated and the structural analysis was performed for the roof frame subject to wind and snow loads. Metallic roof assemblies have higher strength and load resistance capability than usual slate ones, so the structural safety is governed by the frame. The stresses of the roof frame elements caused by the wind and snow loads were analyzed according to roof frame with various spacings between the rafters and the purlins. Wind load analysis was performed by 24, 28, and 38 m/sec of the basic wind speed. Snow load analysis was carried out by 0.5, 1.0 and $2.0kN/m^2$ of the ground snow load. As the analysis result, the current spacing and the size of the lumber did not satisfy the Korean building code specification. To secure the safety of the roof improvement project, the spacing of the roof frame elements and the size of the lumber should be determined based on the analysis results by structural engineers.

A Study on the Feasibility analysis model for Housing Environment Improvement Project of Depressed region - Focused on the project by the public sector - (낙후지역 주거환경개선사업 타당성분석 평가모델 연구 - 공공(公共) 시행사업을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • The purpose of this study was to set and analyze the standard model for prioritizing and deciding to take part in housing environment improvement project in the perspective of the public sector. The results of this study were as follows. The location competitiveness, potential demand, marketability and competitive price, etc were selected by assessment indicators. And Various indicators, including of the size of the area, public transportation, accessibility, convenience of living and the influx of the population, were used by weights indexes. The profit of local residents and the public promoter, variability of earnings, sensitivity analysis and the ratio of money in reserve, etc were also established as detailed indexes for the profitability and business risk analysis. To analyze the cash flow of the project process and review the necessary capital in advance, the payback, total working expenses, gearing ratio and sensitivity of a risk, etc were also set as additional detailed indexes. Lastly, considering it is quasi-public projects, the measure to protect tenants, necessity need of redevelopment and local government's will were additionally used by indexes. And Points were distributed on the importance of each index and scored out of 100. It will allow for the public project promoter to decide rationally whether to come in on the project. The public project promoter like the Korea Land and Housing Corporation will be able to make use of various indexes are based on this study to make decision whether joining the housing environment improvement project in depressed region.

Practice and Limitations of the Environment Improvement Project in the Delinquent Residential Areas for Promoting Mental Health - Focusing on the Area of Saeddeul Maeul Project in Donghae City - (정신건강증진을 위한 노후 불량주거지역 환경개선사업의 실천과 한계 - 동해시 새뜰마을 사업 지역을 중심으로 -)

  • Lee, Sang-Soo;Park, Hoon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.3
    • /
    • pp.49-60
    • /
    • 2019
  • This study is on the practice and limitation of the environment improvement project in the delinquent residential areas implemented as part of the urban restoration project that this study was carried out with the subject of the Saeddeul Village Project in Balhan Dongmunsan District of Donghae City that is implemented as part of resident-participating urban rehabilitation that has emerged as a socially important issue. In particular, at a time the issues of increasing senior population and poverty resulted thereof have surfaced in the society that this study has taken a look at the characteristics in the planning and practice process in the Saeddeul Village Project area for the purpose of improving the mental health. In the planning process and practice process, those human-care project and resident competency strengthening projects, together with physical environment improvement, are implemented, and the contents implemented by respective project are purported to establish the community identity through voluntary participation of local residents together with the environment improvement of the villages on the basis of resident participation as well as leading the economic independence by the village with its own discretion. However, the limitations in the practice process and exposure of problems that may be experienced in the field have made difficulties in such approach and provokes the difficulties of project performance depending on the conflicts in community constituents. Under such a relationship, it is required to have the endeavors to facilitate the community and solution of issued, and this study presents the need of access for revitalizing the regional welfare system.

A Study on the Evaluation for the Improvement of Streetscape through Analysis of Visual and Perceptual Characteristics - Focused on the Gwangbok Street, Busan - (시지각적 분석을 통한 가로경관개선사업 평가에 관한 연구 - 부산시 광복로를 대상으로 -)

  • Yang, Jae Hyuk;Lee, Kang Hee
    • KIEAE Journal
    • /
    • v.9 no.3
    • /
    • pp.37-46
    • /
    • 2009
  • This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of visual and perceptual characteristics by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of the environmental factors which influence subjects' satisfaction degrees including physical street equipments and street view factors which are main contents of this project. Using a satisfaction analysis and factor analysis, each factor's significance was verified quantitatively. As a result of the analysis, physical components of the streetscape were classified into 4 types according to project's effectiveness and improvement priorities. These 4 types include (1) Components for maintenance because of higher satisfaction and higher importance, (2) Components for improvement because of lower satisfaction and higher importance, (3) Components for good business fruits because of higher satisfaction and lower importance, and (4) Components for unnecessity because of lower satisfaction and lower importance.

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

A Study on Improvement Method of Rural Community Development Project (농촌마을종합개발사업의 개선방안 연구)

  • Kim, Kang-Sub;Jun, Taek-Ki
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.11 no.4
    • /
    • pp.59-66
    • /
    • 2009
  • This paper presents the change and contents of rural community development project by literature review. And this paper analyzes the results and problems of rural village in rural community development project. The aim of this study is to suggest the improvement method of rural community development project. Based on this study, mainly three results can be drawn as follows ; first, rural community development project must establish sustainability and locality to main direction of project. Second, this project demand new system and role of local government. And the third, this project are performed by residents, and an educational program and public information to inspire participation consciousness are necessary.

  • PDF

A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Efficiency Improvement of Existing School Facilities to Improvement Project through the Enhancement of the Integrated (기존학교 시설개선사업의 통합적 추진을 통한 효율화 방안 -K-TEGS 평가기법을 통한-)

  • Lee, Sang-Min;Kim, Seong-Joong;Meang, Joon-Ho
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.42-52
    • /
    • 2011
  • The importance of education and training facilities and education facilities on the relationship between effective as demonstrated in many studies can be very big. In this study, the status of existing school facilities improvement project is done individually, based on the systematic integration of the improvement project was to evaluate the feasibility. Furthermore, it was based on looking for ways to effectively pursue. Training School Facilities Improvement Program to be competitive, the country continued to be pursued systematically and very large scale as a whole must be a great national project. So much to promote efficient business environment, quality of education for children with detractors of the national budget to ensure efficient and most importantly in terms of economic investment that can be. In this study, the proposed K-TEGS existing school facilities, such as the development of techniques for the assessment based on this effort to promote an efficient business should be done on a continuous basis.