• Title/Summary/Keyword: improvement project

Search Result 2,175, Processing Time 0.027 seconds

The Effects of a Shift Improvement Pilot Project on Nurses' Shift Adjustment, Work-Life Balance, and Turnover Intention: A Mixed-Methods Study (교대제 개선 시범사업이 간호사의 교대근무 적응, 일과 삶의 균형 및 이직의도에 미치는 효과: 혼합연구방법)

  • Choi, Su Jung;Kim, Mi Soon;Jeon, Mi-Kyeong;Choi, Jin Ju;Son, Sook Yeon;Kim, Eun Hye
    • Journal of Korean Clinical Nursing Research
    • /
    • v.29 no.3
    • /
    • pp.223-237
    • /
    • 2023
  • Purpose: This study aimed to investigate the impact of a nurse shift improvement pilot project on nurses' shift adjustment, work-life balance, and turnover intention, as well as nurses' experiences of participating in the pilot project. Methods: An explanatory sequential mixed-methods study was performed. Survey data was collected from a total of 1,051 nurses both in participant and non-participant groups. For the qualitative study, focus group interviews were conducted with 22 nurses who participated in the shift improvement pilot, including 12 staff nurses, 7 nurse managers, and 3 substitute nurses. Results: There were significant positive effects on the key variables of nurses' shift adjustment, work-life balance, and turnover intention in the group that participated in the nurse shift improvement pilot project. Based on the qualitative study, participants in the shift improvement pilot project indicated that it enabled nurses to recover their circadian rhythm, and achieve a better work-life balance, and they wanted to continue working as a nurse, and hoped expanded application of the pilot project. Conclusion: In order for expanded implementation of the pilot project and continued improvement in the shift system, we recommend establishing compensation standard, systematizing the use of substitute nurses, developing guidelines for shift schedules, and expanding the shift improvement pilot project to other departments such as the emergency room.

A Study on the Regulation Improvement of the Public IT Project Contract Law (공공IT 프로젝트 계약법의 제도개선에 관한 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.231-242
    • /
    • 2005
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A International Comparative Study on the Bidding System & Policy for the Public IT Project (공공 IT 프로젝트 수발주 제도와 정책의 국제간 비고)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.

  • PDF

Policy assessment of Agricultural Infrastructure Improvement Project for Preliminary Feasibility Study - Multipurpose Rural Water Development Project in Pangyo District - (농업생산기반정비사업의 예비타당성조사 정책효과 분석 - 판교지구 다목적 농촌용수개발사업을 중심으로 -)

  • Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seunghwan;Kim, Yoonhyung;Yoon, Sungeun;Kim, Jeonghoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.1
    • /
    • pp.21-28
    • /
    • 2021
  • Since 2001, the Pangyo district multipurpose rural water development project has been promoted as a new target project for stable supply of agricultural water and improvement of the living environment of rural areas in Seocheon-gun. Detailed data analysis and logic must be reinforced, focusing on the items reorganized by the reorganization of the preliminary feasibility study. The purpose of this study is to promote the smooth promotion of projects by conducting a policy effect assessment following the reorganization of the preliminary feasibility study system. This study conducted a policy assessment of agricultural infrastructure improvement project for preliminary feasibility study. The policy assessment is divided into three parts: project implementation conditions, policy effects and special assessments. The newly established policy effect is to assess the job effects, living conditions impact, environmental evaluation, and safety evaluation that contribute to the quality of life. Sixteen policy assessment items were selected and evaluated quantitatively and qualitatively. The results of the study are expected to provide basic data for the comprehensive judgment of the preliminary feasibility study of agricultural infrastructure improvement project in the future.

A study on the evaluation for variation of revenue water ratio considering water supply area conditions and the development of proper cost estimation model of project for improvement of revenue water ratio (급수지역 여건을 고려한 유수율 변동 분석 및 적정 유수율 제고 사업비 산정 모델 개발)

  • Kiwon Kwon;Jinseok Hyung;Taehyeon Kim;Haekeum Park;Yoojin Oh;Jayong Koo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.409-423
    • /
    • 2023
  • In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project's target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.

A Study on the Linkage Strategy for Urban Regeneration Considering Local Characteristics (지역특성을 고려한 기성시가지의 연계적 재생전략 연구)

  • Kim, Cheol-Su;Jung, Byung-Doo;Kang, Seung-Kyu
    • Journal of the Korean housing association
    • /
    • v.23 no.5
    • /
    • pp.87-94
    • /
    • 2012
  • The primary purposes of this study are to suggest a medium-sized regeneration project which includes the excluded small sites near existing regeneration site, to identify urban improvement type which fits local conditions, and to suggest proper regeneration strategies for the improvement type. Main findings of this study are follows. First, the size of the living environment improvement project in urban area should be larger than 3ha and government's incentives are required for parcel merges to make the medium-size project site. Second, independent type of urban regeneration project should consider local characteristics while center-spread type of urban regeneration project should build a center by providing neighborhood facilities and proper housings. Third, urban regeneration project should be able to utilize local assets, such as cultural heritages, natural landscapes, transportation facilities. Fourth, standards for public support should be prepared to improve local competitiveness. Last, further studies are required for urban regeneration system improvement.

A Post Assessment of Streetscape Improvement Projects Based on District Unit Plans (환경정비형 지구단위계획의 효과분석 - 건대앞 노유거리, 성신여대앞 하나로거리, 이대앞 찾고싶은거리를 중심으로 -)

  • Kang, Junmo;Park, Hyun Shin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.89-98
    • /
    • 2010
  • The goal of this study is to investigate the achievement of street improvement projects based on district unit plans aiming at improving the urban streetscape. Post assessments are conducted for three streetscape improvement projects - Noyu street improvement project, Hanaro street improvement project next to Sungshin women's university, Chatgoshipun street improvement project in front of Ehwa women's university. The results of the post assessment indicate that the initial quality of streetscape has been improved after the projects. The long-term sustainability of the streetscape, however, was not achieved for the street improvement project applied at the street next to Sungshin women's university due to the lack of support from the community. It is found that the key component of success for the street improvement project is the strong cooperation between public and private parties.

Project evaluation by the rural villagers on and spatial analysis of the reconstructed villages under the Rural Village Improvement Project (Type A) (취락구조 개선(신촌형) 마을의 주민의식 및 공간구조 분석에 관한 연구)

  • Im, Seung-Bin;Jo, Sun-Jae;Park, Chang-Seok
    • Journal of Korean Society of Rural Planning
    • /
    • v.1 no.2
    • /
    • pp.53-66
    • /
    • 1995
  • This study aims at analyzing of residents'attitudes and spatial structures in the rural villages reconstructed by the Rural Village Improvement Project(type A), and suggesting the guiding directions for planning rural villages. Six rural villages located in KyungGi province were selected for case study. The Major findings can be summarized as follows : 1) The ratio of type A project(newly planned village) in the total cases of the Rural Village Improvement Project has increased since 1990, In the majority(91.2%) of the type A project, the project area is below 2 ha and density of dwelling unit is below 40 households/ha. 2) The three spatial structures of newly planned rural village, i.e., Loop pattern, Cul-de-sac pattern, and Dendritic pattern, are identified. And the barns in the newly-build houses are categorized into the five types : the vertical addition type, the horizontal addition type, the vertical- horizontal addition type, the no- barn type, and the reused -barn type. 3) In the newly planned rural villages, the level of satisfactions for the quality of house and water & sewer system is remarkably higher than in the existing rural villages. These are the positive effects caused by the Rural Village Improvement Project. 4) The majority of the villagers think the improvement of the existing rural village, instead of redevelopment or newly planned village, is most desirable, which means the improvement of houses, roads, and sanitary facilities while preserving the spatial structures of the existing village.

  • PDF

Research on make-or-buy decision making strategy using system dynamics: Focused on Korea's military improvement project (시스템 다이내믹스를 이용한 제조-구매 결정 전략: 한국의 방위력 개선 사업을 중심으로)

  • Choi, Jeong-Hwan;Ko, Seong-Pil;Lee, Jeong-Dong
    • Korean System Dynamics Review
    • /
    • v.13 no.1
    • /
    • pp.159-182
    • /
    • 2012
  • Strategic decision on the execution of national security improvement project is greatly important for the present and future national security. Though, the importance of strategic decision, decision making process has been executed under one-way thinking framework. This research provides a decision-making tool with make-or-buy approach for the national security improvement policy execution methods: foreign purchase and military R&D project, and, via simulation, confirms dynamic change of military capability index respect to change in ratio of foreign purchase and military R&D. A result shows that current ratio of foreign purchases and military R&D is insufficient for national security improvement policy goal. Applying the model from this research provides an appropriate ratio for short term and long term defense strategy and policy goal, and consequent result of increase in national security capability. Thus, this research model can be effectively utilized for national security improvement project.

  • PDF

Analysis of Income Variation of Professional Rice Cultivators Supported by the Farmland Scale Improvement Project (영농규모화사업의 지원을 받은 쌀전업농가의 소득분석)

  • Kim, Kyung-Jin;Kim, Jai-Hong
    • Korean Journal of Agricultural Science
    • /
    • v.34 no.2
    • /
    • pp.189-200
    • /
    • 2007
  • The purpose of this study is to evaluate the farmland scale improvement project and to present basic data for establishing a long-term improvement scheme of this project. Professional rice cultivators' farming scale after receiving the farmland scale improvement fund has increased compared to the situation before receiving the fund support. The average paddy fields increased by 220% (from 2.75ha to 8.82ha), the average upland increased by 27% (from 0.44ha to 0.56ha), and the average orchard land increased by 44% (from 0.25ha to 0.36ha). The rice production costs per 10a are estimated as 608,678won for below 3ha, 488,721won for 3-6ha, 487,431won for 6~10ha, and 425,313won for over 10ha, which decreased with increasing farming scale. The effects of the farmland scale improvement project on income variation are summarized as follows. 1) Average farm household income for all subjects has increased by 223 % (from 40,517,000won to 90,295,000won). 2) For each category, the results show that average farm household income has increased by 9,766,000won for below 3ha, 35,898,000won for 3~6ha, 42,822,000won for 6~10ha, and 72,697,000won for over 10ha.

  • PDF