• Title/Summary/Keyword: improvement project

Search Result 2,175, Processing Time 0.034 seconds

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Analysis of Decision Factors on the Participation of Scaling Project for Private Forest Management using a Logit Model (로짓모형을 이용한 산주의 사유림 경영 규모화 사업 참여 결정요인 분석)

  • Kim, Ki Dong
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.3
    • /
    • pp.360-365
    • /
    • 2016
  • The purpose of this study is to provide the basic information for the early enforcement and extension of the improvement project of management scale of private forest land by understanding the characteristics of forest owners, who have an influence on the participation of the project as one of the private forest management vitalization plans. To achieve this goal, a questionnaire survey targeting 373 forest owners was conducted and analyzed by Binary-Logistic Regression. The variables for binary-logistic regression included gender, age, academic ability, occupation, income, residence, purpose of forest ownership, and status of cooperative membership. As a result of the analysis, 267 forest owners (71.6%) of total 373 forest owners have the intention to participate in the scaling project for private forest management. The rest of forest owners (106 forest owners, 28.4%) would not be willing to participate in the project. As a result of binary-logistic regression, the most important variables, which have an impact on the participation of private forest management scale improvement project, are age, job and forest own purpose.

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

Improvement of Project Competency for Small IT Companies through SWOT-AHP Analysis (SWOT-AHP 분석을 통한 소규모 IT업체의 프로젝트 수행 역량 개선)

  • Lee, Min-Kyung;Kang, Chang-Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.83-89
    • /
    • 2018
  • In the SW industry, the diversification of global markets and technology trends are changing due to the emergence of new services, and IT companies are in need of strategic change different from the previous one. In this study, SWOT analysis was performed by extracting the internal environmental factors and external environmental factors through the previous studies to improve the project performance competence of small IT companies, and the SWOT Matrix was reconstructed through the pairwise comparison. Based on this, the purpose of this research was to propose the project performance competency improvement plans for small IT companies based on importance and priority, and the following four strategies were derived from the result of SWOT-AHP analysis. SO strategy was drawn in direction to invest R & D in new SW industry to enhance technology competitiveness of SMEs in order to develop SMEs, and in order to secure competitiveness of SW industry, WO strategy is drawn the cultivation of professional technical manpower through SW policy. ST Strategy presented technical management through SW system improvement policy to improve SW environment, and WT Strategy presented awareness training on the construction and necessity of project management system construction. Using the strategies presented in this study, it is expected that the managers of small IT firms will be presented as references to measure the performance competence factors of current organizations and company organizations.

Analysis of Local Community Spaces Bringing Empty Homes back into Use - Focused on Empty Home Utilization Project of Nam-Gu, Incheon (빈집을 활용한 지역사회 거점공간 분석 - 인천시 남구 공가활용사업을 중심으로)

  • Park, Hae-sun;Eun, Nan-Soon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.4
    • /
    • pp.55-65
    • /
    • 2017
  • Purpose: This study is to identify the implications and improvement solutions to plan the local community spaces bringing empty homes back into use that fit for regional characteristics, by analyzing the Empty Home Utilization Project implemented in Nam-gu, Incheon. Methods: Among 20 homes sponsored by the Project, five homes being currently operated were analyzed in depth, and features of exterior and interior spaces, and operational characteristics of the subject homes having been renovated through the project sponsorship were examined. Results: A plan is being established to systematically manage deserted or empty homes by assigning classification to each home in Nam-gu, Incheon and they are being utilized as a community space, a place of business or a cultural art space. Most of the physical improvements only included minor repairs such as redoing interior finish, as no major renovation was implemented including layout change and wall removing. Absence of major changes including improvement of house structure resulted in problems regarding accessibility and safety. Also, there was a limit to utilize the spaces only with support on physical improvement cost for empty homes, and it was identified that positive support for renovation should be conducted in accordance with its uses for the purpose. Implications: To complete the Empty Home Utilization Project successfully, it is most critical to reflect the resident opinions and demands, and discover local operators. Furthermore, for sustainable operation of local community space, additional plans for support would be required including financial support and training local leaders, consulting support for operation, encouraging community participation, and connecting with neighbor community.

A Study on The Satellite image and GIS application from Urban Improvement Project (도시정비사업에서의 위성영상과 GIS 활용 방안 연구)

  • Han, In Goo;Lim, Young Taek;Choi, Bong Moon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.17-21
    • /
    • 2007
  • Recently, the satellite image is getting large spotlight as a way for getting necessary information of urban planning and management, but the satellite image is only used to explain the status or basemap instead of paper map in urban planning works. From this study we derived the detail indexes to fix the boundary of urban improvement project, for measuring these indexes used with satellite image and GIS. the linkage of GIS and satellite image let us to catch the indexes and contribute to improvement type deciding in Urban Improvement Project.

  • PDF

Comparison of Perceptions of Local Residents and Public Health Center Staffs on the Performance of Medical Service Improvement Plan in Rural Areas (농어촌 의료서비스 개선사업 성과에 대한 지역주민과 사업담당자간의 인식 비교)

  • Lee, Ju Yul;Hwang, Rah Il
    • Journal of agricultural medicine and community health
    • /
    • v.43 no.2
    • /
    • pp.74-84
    • /
    • 2018
  • Objectives: The purpose of this study is to compare the perceptions of the rural healthcare service improvement project' performance and reorganization of public health centers between project staffs and local residents. Methods: Data collection from this study was performed in 141 project areas using structured questionnaires. Data analysis was used in SPSS 22.0 version. Results: The public health center staffs were more positive about the items for improving health facilities than the local residents. Residents in the Si area generally perceived performance as more positive than residents in the Gun area, while public health center staffs in the Gun area perceived performance as more positive than public health center staffs in the Si area. Local residents expressed negative opinions about the reduction in the number of branches of public health clinics and health medical clinics. Conclusions: In conclusion, careful improvement projects for rural health care and the establishment of health care systems will be necessary, reflecting the opinions of local residents, along with a variety of regional characteristics.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

A Study on Economic Analysis of Improvement of High Accident Locations in Highway(Focused on Safety Facilities) (고속도로 사고다발지점 개선사례 경제성 분석에 관한 연구(안전시설물 중심으로))

  • Park, Je-Jin;Joo, Jae-Woong;Lee, Jong-Chul;Ha, Tae-Jun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.2
    • /
    • pp.92-99
    • /
    • 2008
  • The rapid economic growth in Korea raised the increase of transportation demands about the passengers and the goods, and caused the concentration on cities. By the rise of a nation's income level, a automobile is necessary in our modern life. However, the traffic delays and traffic accidents that are raised by automobiles decrease the evaluation about a nation's economy and then the government practices the traffic safety improvement project. In this study, by performing the improvement project, we expect to achieve the following objectives. First, this study analyses the degree of effectiveness whether or not success in the improvement. Second, to supply the data on the effectiveness of the improvement and to inform the necessity of improvement. Third, to supply the information on the improvement project to the parties concerned. In this paper, through the study about identification of high accident locations, the effectiveness for the number of accidents and accident rates before-after the improvement is analyzed. Also, the B/C analysis about this locations is performed. This study shows that the number of accident and accident rates are decreased after the improvement, and there is economic validity about improvement of high accident locations.

  • PDF

Safety Management Improvement Plan in Construction Project (건설사업 관리의 안전관리 향상 방안에 대한 연구)

  • Kim, Min-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF