• Title/Summary/Keyword: illuminating equipment

Search Result 240, Processing Time 0.017 seconds

Fast Contingency Ranking Algorithm of Power Equipment (전력설비의 신속한 상정사고 선택 앨고리즘)

  • 박규홍;정재길
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.12 no.1
    • /
    • pp.20-25
    • /
    • 1998
  • This paper presents an algorithm for contingency ranking using line outage distribution factors(LODF) which are established by generation shift distribution factors(GSDF) from DC load flow solutions. By using the LODF, the line flow can be calculated according to the modification of base load flow if the contingency occur. To obtain faster contingency ranking, only the loading line more than 35[%](60[%] at 154[kV]) is included in the computation of Performance Index(PI). The proposed algorithm has been validated in tests on a 6-bus test system.system.

  • PDF

A Development of Agent-Based IEDs for Integration Control of Building Microgrid in Smart Green Building (그린빌딩에서의 빌딩마이크로그리드 통합제어를 위한 에이전트용 IED 개발)

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.35-43
    • /
    • 2012
  • In this paper, a development of agent-based IEDs(Intelligent electronic devices) for integration control of building microgrid in smart green building are proposed. To manage and control this complex energy system of smart green buildings, multi-agent system based networks is needed. Thus, several IEDs for utilizing multi-agent system are developed and modified for the their verification of performance as agent modules functions in the integrated experimental equipment. The good performance of these IED agents are verified from experimental results obtained from seamless bi-directional communication by SOAP/XML protocol between PC agent and IED agent.

Development of KTX Track Error Diagnosis Program using Track Circuit Modeling Methods (궤도회로 모델링을 이용한 KTX 궤도결함 진단 프로그램 개발)

  • Ahn, Dong-Jun;Lee, Byeong-Gon;Nam, Hyun-Do
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.44-51
    • /
    • 2012
  • The purpose of this study is development of the diagnosis system to preventative maintenance in the on-board measuring systems for in-cab electric inspection systems of high speed railway. The on-board measuring systems can inspect precisely whether ground signal system operate stably. In this paper, we recognize characteristics of the track circuits and confirm whether the wave of current matches the on-board measuring data through the electric modeling method for high speed railway. it is necessary to develop GUI visual programs that can simulate abnormalities of the on-board measuring data in many ways, and the visual program is designed to diagnosis in the case of track circuit equipment's function decreased in advance.

An Analysis the Distribution Power System Voltage Sag Case by a High Capacity Motor Connection (대용량 전동기 기동시 배전계통의 순간전압강하 발생사례 분석)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.143-148
    • /
    • 2010
  • Recently, the KEPCO is constructing the PQMS(Power Quality Monitoring System) each of the distribution line and will establish the voltage sag standard based on the long time measurement data of PQMS. The voltage sag prospect is difficult for the power system manager, however, the voltage sag forecasted is very important because the damage effect of the voltage sag is very broad. This paper describes the prospect formula of the voltage sag magnitude in the PCC(Point Common Coupling) by the starting current when the high capacity equipment is connected with the distribution line. To achieve this, this paper has proposed the sag prospect formula revision of KEPCO for the reliability improvement and the proposed formula has been applied the voltage sag real case to inspect the calculation procedure and reliability.

Interface design Between AMR and DAS (AMR과 DAS의 인터페이스 구현)

  • Jung, Jum-Soo;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.126-133
    • /
    • 2008
  • Computer and communication of based IT technology use to das that remote control, monitoring, measuring automatic gas switch, recloser located far about $20{\sim}30[km]$. For increasing efficiency billing, metering of high voltage customer use to amr system. If between das and amr interface operate when generated fault in high voltage electric equipment of customer part, amr system serve to das quickly in fault information data, correct fault location.

Development of aFailure Diagnosis Expert System for Rotational Equipment of Generation Facilities (발전설비의 회전기기 고장진단을 위한 전문가 시스템의 구현)

  • 김창종
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.12 no.4
    • /
    • pp.47-54
    • /
    • 1998
  • As higher reliability on generator facilities is required to early detect incipient faults, a diagnostic system for predictive maintenance of the facility is highly recommended. In this paper, an expert system is developed suing the CLIPS - expert system tool - utilizing the knowledge on the insulation diagnosis and the vibration diagnosis on the rotating machines. This expert system, with user - friendly interface for operator, is easy to revise and add diagnostic rules and knowledge.

  • PDF

Characteristics of DC Surface Discharge for the Development of UV Camera (자외선 카메라 개발을 위한 직류 연면방전 특성)

  • Pang, Man-Sik;Choi, Jae-Hyeong;Kim, Woo-Jin;Kim, Young-Seok;Kim, Sang-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.5
    • /
    • pp.98-103
    • /
    • 2011
  • Recently, UV(ultra-violet rays) camera has attracted a great deal of interest from the view point of easy judgement in inspections and diagnoses of the safety of power equipment. Especilly, UV camera is applied the inspection of UV with corona discharge. One of the most important and difficult problems is the basic research of filter design, materials and corona discharge. In this paper, we will report on the UV generation, corona pulse count and the polarity effect of positive and negative DC surface discharge in air. Also, corona discharge characteristics are analyzed using prototype UV camera of Korea. UV generation and corona pulse count due to surface discharge in positive needle is higher than that of negative needle.

A Study on the Improvement of Electrode Installation for Measurement of Ground Resistance through Investigation on the Spot in Buildings (현장조사를 통한 건축물 접지저항 측정용 전극 설치의 개선에 관한 연구)

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kil, Gyung-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.5
    • /
    • pp.92-97
    • /
    • 2011
  • This paper deals with the improvement of electrode installation for measurement of ground resistance through investigation on the spot in buildings. The investigation was carried out for an earthing terminal board for measurement of ground resistance, installation of auxiliary electrode, etc. The criteria value is set up by measuring method of ground resistance in international standard. In case of inadequate installation of auxiliary electrode, a relative error is analyzed and adequate installation method of auxiliary electrode is proposed. As a consequence, it is necessary to write direction of ground and equipment, and separate auxiliary electrode for measurement of ground resistance in order to minimize measuring error.

A Study on Railway Vehicles Fire Detection using HMI Touch Screen (HMI 터치스크린을 이용한 철도차량용 복합화재수신기 개발 연구)

  • Park, In-Deok;Kim, Chang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.30 no.1
    • /
    • pp.38-43
    • /
    • 2016
  • Recent social needs for promoting traffic safety increased and the demand social security in economic, increasing the demand for environmentally friendly rail transport. In particular, when train express such as to secure reliability KTX(Korea Train eXpress) from potential disaster(fire) in the train operation caused by the train express running has been very important. Railroad fire extinguishing system is operated to fire exploding before reaching the flashing point more important than early to quickly detect because of CAN(Controller Area Network) communication to fire suppression and fire receiver, interface, fire fighting equipment from HMI((Human Machine Interface) and fire high-performance to research and development for intelligent composite fire receiver is required.

The Development of Real-Time Harmonic Analysis Algorithm in Distribution Transformer (배전용 변압기의 실시간 고조파 분석 알고리즘 개발)

  • Park, Chul-Woo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.3
    • /
    • pp.43-49
    • /
    • 2013
  • Recently harmonics flowing into power system is increasing as the usage of semiconductor equipments and switching mode power equipments are increasing. Harmonics cause problems such as heat increasing and reduction in capacity of transformers, especially the harmonics flowing into a distribution transformer can lead to the lifetime reduction of transformer. In this paper, we are about to develop a device that can monitor harmonics in real-time as it is affixed to a distribution transformer. Unlike the existing expensive harmonic analysis device, a new harmonic analysis algorithm is proposed in order to implement low-cost equipment. The real-time harmonic analysis algorithm proposed in this paper allows implementation on low performance microcontrollers, thus it can monitor the harmonic in real-time as it is individually affixed to the transformer. Therefore, it would improve the reliability of the transformer and stable power system operation would be possible as it can prevent the transformer accidents in advance.