• Title/Summary/Keyword: hydro-power plant

Search Result 321, Processing Time 0.028 seconds

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계 사례)

  • Ko, Sung-Ho;Jeong, Yong-Chae;Choi, Seong-Pil;Kwack, Young-Kyun;Han, Seung-Yeul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

A Study on the Performance Prediction for Small Hydro Power Plants (소수력발전소의 성능예측)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.448-451
    • /
    • 2005
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction for small hydro power(SHP) plants and its application. The flow duration curvecan be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique. Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated. It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

  • PDF

Performance Evaluation of the Samcheonpo Small-Hydro Power Plant (삼천포 해양소수력 성능평가)

  • Cho, Hong-Yeon;Cho, Beom-Jun;Kang, Geum-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.617-620
    • /
    • 2007
  • The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.

  • PDF

THINNED PIPE MANAGEMENT PROGRAM OF KOREAN NUCLEAR POWER PLANTS

  • Lee, S.H.;Lee, Y.S.;Park, S.K.;Lee, J.G.
    • Corrosion Science and Technology
    • /
    • v.14 no.1
    • /
    • pp.1-11
    • /
    • 2015
  • Local wall thinning and integrity degradation caused by several mechanisms, such as flow accelerated corrosion (FAC), cavitation, flashing and/or liquid drop impingements, are a main concern in carbon steel piping systems of nuclear power plant in terms of safety and operability. Thinned pipe management program (TPMP) had been developed and optimized to reduce the possibility of unplanned shutdown and/or power reduction due to pipe failure caused by wall thinning in the secondary side piping system. This program also consists of several technical elements such as prediction of wear rate for each component, prioritization of components for inspection, thickness measurement, calculation of actual wear and wear rate for each component. Decision making is associated with replacement or continuous service for thinned pipe components. Establishment of long-term strategy based on diagnosis of plant condition regarding overall wall thinning is also essential part of the program. Prediction models of wall thinning caused by FAC had been established for 24 operating nuclear plants. Long term strategies to manage the thinned pipe component were prepared and applied to each unit, which was reflecting plant specific design, operation, and inspection history, so that the structural integrity of piping system can be maintained. An alternative integrity assessment criterion and a computer program for thinned piping items were developed for the first time in the world, which was directly applicable to the secondary piping system of nuclear power plant. The thinned pipe management program is applied to all domestic nuclear power plants as a standard procedure form so that it contributes to preventing an accident caused by FAC.

A Study on the Power Plant Application of Engine Condition Diagnosis Technology for Diesel Generator (디젤발전기 엔진 상태 진단 기술의 발전소 적용 연구)

  • Choi, Kwang-Hee;Lee, Sang-Guk
    • Journal of Power System Engineering
    • /
    • v.17 no.4
    • /
    • pp.17-22
    • /
    • 2013
  • Diesel generator of nuclear power plant has a role for supply of emergency electric power to protect reactor core system in event of loss of off-site power supply. Therefore diesel generator should be tested periodically to verify the function that can supply specified frequency and voltage at design power level within limited time. For this purpose, appropriate maintenances in case that abnormal conditions were found are required in allowed time. In this paper, results of development of engine condition diagnosis technology and study on power plant of its technology for diesel generator are described.

Radioactive effluents released from Korean nuclear power plants and the resulting radiation doses to members of the public

  • Kong, Tae Young;Kim, Siyoung;Lee, Youngju;Son, Jung Kwon;Maeng, Sung Jun
    • Nuclear Engineering and Technology
    • /
    • v.49 no.8
    • /
    • pp.1772-1777
    • /
    • 2017
  • Korean nuclear power plants (NPPs) periodically evaluate the radioactive gaseous and liquid effluents released from power reactors to protect the public from radiation exposure. This paper provides a comprehensive overview of the release of radioactive effluents from Korean NPPs and the effects on the annual radiation doses to the public. The amounts of radioactive effluents released to the environment and the resulting radiation doses to members of the public living around NPPs were analyzed for the years 2011-2015 using the Korea Hydro & Nuclear Power Co., Ltd's annual summary reports of the assessment of radiological impact on the environment. The results show that tritium was the primary contributor to the activity in both gaseous and liquid effluents. The averages of effective doses to the public were approximately on the order of $10^{-3}mSv$ or $10^{-2}mSv$. Therefore, even though Korean NPPs discharged some radioactive materials into the environment, all effluents were within the regulatory safety limits and the resulting doses were much less than the dose limits.

Safety Analysis of Concrete Treatment Workers in Decommissioning of Nuclear Power Plant

  • Hwang, Young Hwan;Kim, Si Young;Lee, Mi-Hyun;Hong, Sang Beom;Kim, Cheon-Woo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.3
    • /
    • pp.349-356
    • /
    • 2022
  • Nuclear power plant decommissioning generates significant concrete waste, which is slightly contaminated, and expected to be classified as clearance concrete waste. Clearance concrete waste is generally crushed into rubble at the site or a satellite treatment facility for practical disposal purposes. During the process, workers are exposed to radiation from the nuclides in concrete waste. The treatment processes consist of concrete cutting/crushing, transportation, and loading/unloading. Workers' radiation exposure during the process was systematically studied. A shielding package comprising a cylindrical and hexahedron structure was considered to reduce workers' radiation exposure, and improved the treatment process's efficiency. The shielding package's effect on workers' radiation exposure during the cutting and crushing process was also studied. The calculated annual radiation exposure of concrete treatment workers was below 1 mSv, which is the annual radiation exposure limit for members of the public. It was also found that workers involved in cutting and crushing were exposed the most.