Performance Evaluation of the Samcheonpo Small-Hydro Power Plant

삼천포 해양소수력 성능평가

  • Published : 2007.06.21

Abstract

The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.