• Title/Summary/Keyword: hydro energy

Search Result 484, Processing Time 0.027 seconds

A study on internal flow characteristics and performance analysis of a micro hydro tubular turbine (소수력발전용 튜블러 수차의 내부유동특성 및 성능해석)

  • Lee, Seung-Yeob;Choi, Young-Do;Hwang, Young-Chul;Lee, Young-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.606-609
    • /
    • 2009
  • Development of renewable energy is very important because of environmental problems caused by greenhouse effect. This is due to the use of fossil fuels which has serious consequences. Therefore, development of small hydropower can be a good countermeasure for the problems. The small hydropower is clean energy because the small hydropower generates few $CO_2$. Moreover, as the energy density by the small hydropower is high, it is economical for a society which wants to introduce the system. The purpose of this study is to improve the turbine performance. This study is about tubular-type hydro turbine among renewable energy that is based using the different water pressure level in pipe lines. The analysis was performed using the commercial CFD code ANSYS-CFX.

  • PDF

Determination of the Optimal Contract Amount of the Hydropower Energy Considering the Reliabilities of Reservoir Inflows (저수지(貯水池) 유입량(流入量)의 신뢰도(信賴度)를 고려한 최적(最適) 계약전력량(契約電力量)의 결정(決定))

  • Kwon, Oh Hun;Yoo, Ju Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.141-149
    • /
    • 1993
  • Production of hydro-energy is random in its output amount due to the characteristics of the reservoir inflows. Therefore, it is necessary to provide the rationality in determining the amount of energy for a supply contract. This study presents a methodology for determining reasonably reliable amount of the energy supply considering the energy sale-incomes associated with the penalties which are subject to inflow-reliabilities. The objective function consists of the returns of energy sales and the risk-loss function to reflect statistically relevant risks. A range of the coefficient of the risk-loss function was figured out by its sensitivity analysis. The risk-loss herein means the penalty which should be paid by the energy supplier in case that the level of the energy supply is behind the contracted amount. And the reliability of reservoir inflow is defined by the exceedance probability of the inflow. The log-normal distribution was accepted as the probability density function of monthly inflows on the level of significance at 5%. Golden-ratio searching was applied to identify the optimal reliability and Incremental Dynamic Programming was used to maximize generation of the hydro-power energy in reservoir operation. The algorithm was the applied to the Daechung multi-purpose reservoir and hydro-power plant system in order to verify its usefulness.

  • PDF

Review of the 21th Energy (21세기의 에너지에 관한 고찰)

  • Lee, Hyun-Hwa
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.5 s.188
    • /
    • pp.20-24
    • /
    • 2006
  • The energy of 97% consumed by our country depends on it's import from foreign market. This article covers hydrogen, fuel-cell, coal liquefaction gasification energy, and solar, wind, photovoltaic, hydro power, ocean, waste, geothermal, bio energy that is renewable energy, and so on, which are new-generation energy sources, increasing the concern on new & renewable source of enenrgy in future.

  • PDF

Effect of Venturi System on Acceleration of Low-speed Water Flow at the Venturi Throat Installed at the Inlet of Hydro Turbine

  • Jung, Sang-Hoon;Seo, In-Ho;Kim, Chul-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.7
    • /
    • pp.914-920
    • /
    • 2011
  • For a hydro turbine electricity generation system in river or bay, a venturi system could be applied to accelerate flow speed at the inlet of the turbine system in a flow field. In this study, a steady flow simulation was conducted to understand the effect of venturi system on the acceleration of current speed at the inlet of a hydro turbine system. According to the continuity equation, the flow speed is inversely proportional to the cross-section area in a conduit flow; however, it would be different in an open region because the venturi system would be an obstruction in the flow region. As the throat area is 1/5 of the inlet area of the venturi, the flow velocity is accelerated up to 2.1 times of the inlet velocity. It is understood that the venturi system placed in an open flow region gives resistance to the upcoming flow and disperses the flow energy around the venturi system. The result of the study should be very important information for an optimum design of a hydro turbine electricity generation system.

Development of the Preventive Maintenance Template for Static Exciter in the Nuclear Power Plant (원자력발전소 정지형 여자기의 예방정비기준(PMT) 개발)

  • Chin, Soo-Hwan;Park, Jin-Youb;Hong, Young-Hee
    • Journal of Energy Engineering
    • /
    • v.20 no.2
    • /
    • pp.154-162
    • /
    • 2011
  • PMT(Preventive Maintenance Template) is a standardized maintenance program that describes maintenance items & period as operation condition to increase component reliability at the component level. The existing maintenance programs are focused on time based maintenance to inspect and repair component depend on fixed period. But recently, we have developed advanced maintenance program(named PMT) to increase reliability and optimize maintenance program of the plant significant component. This paper presents how to develop the PMT for nuclear power plant's static exciter.

Performance evaluation facilities and evaluation methods for hydropower equipment (해외 수력발전설비 성능평가설비 및 평가 방법)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.194-194
    • /
    • 2010
  • The variable demand on the energy market, as well as the limited energy storage capabilities, requires a great flexibility in operating hydraulic turbines. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and/or maximum steady-state runaway speed, as well as guarantees related to cavitation. Performance test are conducted by the test standard. Test codes based on extensive research data are written under the leadership of an IEC. Performance evaluation is carry out several test(performance test, cavitation test and runaway test). The paper presents the international turbine test laboratory and performance test standard.

  • PDF

Desorption Characteristics of $H^{14}CO_3$ ion from Spent Ion Exchanged Resin by Solution Stripping Technology

  • Park Geun-IL;Kim In-Tae;Kim Kwang-Wook;Lee Jung-Won;Won Jang-Sik;Yang Ho-Yeon
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.214-221
    • /
    • 2005
  • Spent ion-exchanged resin generated from various purification systems in CANDU reactor is causing concern due to a limited storage capacity and safe disposal. As a suggestion for a proper treatment technology for the spent ion-exchanged resin containing a high activity of C­14 radionuclide which would be classified as Class A and C wastes, a fundamental study for the development of C-14 removal technology from a spent resin was performed. The adsorption characteristics of the inactive $HCO_3^-$ ion and other ions in a stripping solution on IRN-150 mixed resin was evaluated and the removal technology of the $HCO_3^-$ ion adsorbed on IRN-150 by an alkaline stripping method was proposed.

  • PDF

Thermal Analysis of a Spent Fuel Storage Cask under Normal and Off-Normal Conditions

  • Lee, J. C.;K. S. Bang;K. S. Seo;Kim, H.D.;Park, B. I.;Lee, H. Y.
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.601-608
    • /
    • 2003
  • Thermal analyses have been carried out for a spent fuel dry storage cask under normal and off-normal conditions. Environmental temperature is assumed to be $15^{\circ}C$ under the normal condition. The off-normal condition has an environmental temperature of $38^{\circ}C$. An additional off-normal condition is considered as a partial blockage of the air inlet ducts. Two of the four air inlet ducts are assumed to be completely blocked. The maximum temperatures of the fuel rod and concrete overpack were lower than the allowable values under the normal condition. Temperature distributions for the off-normal conditions were slightly higher than the normal conditions.

  • PDF

A REVIEW ON THE ODSCC OF STEAM GENERATOR TUBES IN KOREAN NPPS

  • Chung, Hansub;Kim, Hong-Deok;Oh, Seungjin;Boo, Myung Hwan;Na, Kyung-Hwan;Yun, Eunsup;Kang, Yong-Seok;Kim, Wang-Bae;Lee, Jae Gon;Kim, Dong-Jin;Kim, Hong Pyo
    • Nuclear Engineering and Technology
    • /
    • v.45 no.4
    • /
    • pp.513-522
    • /
    • 2013
  • The ODSCC detected in the TSP position of Ulchin 3&4 SGs are typical ODSCC of Alloy 600MA tubes. The causative chemical environment is formed by concentration of impurities inside the occluded region formed by the tube surface, egg crate strips, and sludge deposit there. Most cracks are detected at or near the line contacts between the tube surface and the egg crate strips. The region of dense crack population, as defined as between $4^{th}$ and $9^{th}$ TSPs, and near the center of hot leg hemisphere plane, coincided well with the region of preferential sludge deposition as defined by thermal hydraulics calculation using SGAP computer code. The cracks developed homogeneously in a wide range of SGs, so that the number of cracks detected each outage increased very rapidly since the first detection in the $8^{th}$ refueling outage. The root cause assessment focused on investigation of the difference in microstructure and manufacturing residual stress in order to reveal the cause of different susceptibilities to ODSCC among identical six units. The manufacturing residual stress as measured by XRD on OD surface and by split tube method indicated that the high residual stress of Alloy 600MA tube played a critical role in developing ODSCC. The level of residual stress showed substantial variations among the six units depending on details of straightening and OD grinding processes. Youngwang 3&4 tubes are less susceptible to ODSCC than U3 and U4 tubes because semi-continuous coarse chromium carbides are formed along the grain boundary of Y3&4 tubes, while there are finer less continuous chromium carbides in U3 and U4. The different carbide morphology is caused by the difference in cooling rate after mill anneal. There is a possibility that high chromium content in the Y3&4 tubes, still within the allowable range of Alloy 600, has made some contribution to the improved resistance to ODSCC. It is anticipated that ODSCC in Y5&6 SGs will be retarded more considerably than U3 SGs since the manufacturing residual stress in Y5&6 tubes is substantially lower than in U3 tubes, while the microstructure is similar with each other.

A Study on Output Increase of Small Hypro Power using Nature Energy (자연에너지를 이용한 소수력 출력증대 방안 연구)

  • Chae, Ji-Seog;Yoon, Lee-Soo;Kim, Tae-Ho;Kim, Young-Il;Ma, Bem-Gu;Choi, Jang-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1129-1130
    • /
    • 2011
  • The output of small hydro power plant was generated less than rated output under high temperature. We Installed the artificial ventilation that blow cold wind from water supply pipe tunnel to small hydro power plant. The temperature of small hydro power has been decreased. The output of small hydro power plant has been increased from 405kW to 445kW.

  • PDF