• Title/Summary/Keyword: hub site

Search Result 74, Processing Time 0.024 seconds

A Study on the Growth of Air Cargo Volume and the Development Plan for Regional Airport Focusing on Cheonng-Ju Int'l Airport (항공화물 활성화를 위한 정책분석과 지방공항 발전방안 연구: 청주국제공항을 중심으로)

  • Won-Tae Park;Yeon-Young Sung;Sung-Sik Park
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.32 no.2
    • /
    • pp.112-123
    • /
    • 2024
  • Responding to rapid changes of global supply chain and fast increasing air cargo volume and demand for e-commerce market, this paper researched the development plans for regional airport specially focused on air cargo logostics through policy research. According to this research, political implications and development plans for Cheong Ju airport (CJJ) to become a part of global supply chain, a regional air cargo hub. Firstly, it is necessary to increase the length of the existing runway from 2,744m to 3,200m or to develop 3rd runway only for a civil aircraft use. Secondly, it is inevitable to develop new air cargo terminal to handle and export such high value-added products as semi-conductor or rechargeable battery through airport. In addition, facing re-shoring trends among global supply chain, CJJ can increase its air cargo volume and also provide feeder service to Incheon airport, inducing global distribution center near airport site.

How to Implement Quality Pediatric Palliative Care Services in South Korea: Lessons from Other Countries (한국 소아청소년 완화의료의 발전 방안 제언: 국외 제공체계의 시사점을 중심으로)

  • Kim, Cho Hee;Kim, Min Sun;Shin, Hee Young;Song, In Gyu;Moon, Yi Ji
    • Journal of Hospice and Palliative Care
    • /
    • v.22 no.3
    • /
    • pp.105-116
    • /
    • 2019
  • Purpose: Pediatric palliative care (PPC) is emphasized as standard care for children with life-limiting conditions to improve the quality of life. In Korea, a government-funded pilot program was launched only in July 2018. Given that, this study examined various PPC delivery models in other countries to refine the PPC model in Korea. Methods: Target countries were selected based on the level of PPC provided there: the United Kingdom, the United States, Japan, and Singapore. Relevant literature, websites, and consultations from specialists were analyzed by the integrative review method. Literature search was conducted in PubMed, Google, and Google Scholar, focusing publications since 1990, and on-site visits were conducted to ensure reliability. Analysis was performed on each country's process to develop its PPC scheme, policy, funding model, target population, delivery system, and quality assurance. Results: In the United Kingdom, community-based free-standing facilities work closely with primary care and exchange advice and referrals with specialized PPC consult teams of children's hospitals. In the United States, hospital-based specialized PPC consult teams set up networks with hospice agencies and home healthcare agencies and provide PPC by designating care coordinators. In Japan, palliative care is provided through several services such as palliative care for cancer patients, home care for technology-dependent patients, other support services for children with disabilities and/or chronic conditions. In Singapore, a home-based PPC association plays a pivotal role in providing PPC by taking advantage of geographic accessibility and cooperating with tertiary hospitals. Conclusion: It is warranted to identify unmet needs and establish an appropriate PPD model to provide need-based individualized care and optimize PPC in South Korea.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

A Study on Application Plan LTE Wireless Network in the Container Terminal Yard (컨테이너터미널 장치장에서 무선네트워크 LTE 적용방안에 관한 연구)

  • Cha, Sang-Hyun;Noh, Chang-Kyun
    • Journal of Navigation and Port Research
    • /
    • v.40 no.1
    • /
    • pp.43-50
    • /
    • 2016
  • Amid of the logistics hub center competition is going to intensifying between the world major port, it is essential to pre-occupied the base in the logistics hub world take advantage of advanced technology of logistics equipment than other ports. In existing container terminal, when container moves the terminal use the omnidirectional and directional antenna in order to exchange data information on the basis of 802.11 wireless network system. Case of loading height of exceeding, the blind sport will occur and a limited frequency channel can't help using in the area. A limited frequency channel usage and nested areas happen to use the closed terminal, it has a great influence to operate the terminal working. In this paper, LTE network is configured provided by the specified company ('L' Corp,.Ltd) and terminal data extracted through LBO (Local Breakout) in the cell site which is configured directly with container terminal operation server. Using this method, container terminal yard equipment operate without overlapping arises with uninterrupted data presented for ways to efficiently. I would suggest both the existing wireless AP LAN configuration of container terminal and new LTE system and applied to the real yard operating devices situations. Through these methods presented comparative the existing network traffic with new constructed LTE configuration. I admired to suggest that wireless network LTE introduction is fundamental factors to get rid of the blind spot, the problem of limited frequency channel and overlapping arises. These essential points can be a continual improving terminal services and more efficient terminal operational management.

Analysis of Berth Operation Ratio in terms of Wave Response at Busan New Port Site (부산신항역 파랑반응에 따른 부두 가동율 해석)

  • Jeong, Jae-Hyun;Lee, Hak-Seung;Lee, Joong-Woo;Yang, Sang-Yong;Jeong, Young-Hwan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.57-62
    • /
    • 2006
  • Busan New Port, under construction aiming for the hub of Northeast Asia and Partly in operation, had damaged up to 48 billion Won due to Typhoon 'maemi' in 2003. The present criteria of domestic harbor design only describes about the critical wave height with respect to the size of vessel for harbor tranquility. The berth operation ratio which represents the annual available berthing days is depending on the efficiency of cargo handling work and this depends on the motion of the moored vessel due to the wave action and the characteristics of cargo gears. The motion of moored vessel might be related not only to the wave height but also to wave period. Furthermore, the berth operation ratio relies on external forces such as currents and winds, including the characteristics of mooring system and the specification of the moored vessel. In this study we only deal with berth operation ratio in normal sea state, considering wave and current by measured data and numerical calculation. Especially we tried to evaluate the berth operation ratio for each berth adopting the variation of dredging and reclamation plan and the change of wave environment during the process of the new port construction. For better understanding and analysis of wave transformation process, we applied the steady state spectral wave model and extended mild-slope wave model to the related site. This study summarizes comparisons of harbor responses predicted by two numerical predictions obtained at Busan New port site. Field and numerical model analysis was conducted for the original port plan and the final corrected plan.

  • PDF

A Study on the Birthplace of Kang Jeungsan, Gaekmang-ri, and Neighboring Areas from a Feng Shui Perspective: Focused on the Theory of Connecting Geomantic Veins (상제 강세지 객망리 일대의 풍수지리적 의미에 관한 연구 -지맥의 연결과정을 통한 형기론을 중심으로-)

  • Shin Young-dae
    • Journal of the Daesoon Academy of Sciences
    • /
    • v.46
    • /
    • pp.69-122
    • /
    • 2023
  • This study is an integral exploration of Feng Shui associated with the area around the birthplace of Kang Jeungsan, a sacred site of Daesoon Jinrihoe which holds that the Supreme God descended in human form at that location (through Kang Jeungsan). Through an on-site Feng Shui survey, the main focus of the research method was to explore the Feng Shui configurations around Kang Jeungsan's birthplace especially as it pertains to the connections among geomagnetic veins which lead to the Mount Shiru area. As a method of investigation, this study explored the Feng Shui of Gaekmang-ri Village and the geomantic veins leading up to Mount Shiru. This involved examining the landforms, topography, water flow, and geomantic veins of the area to reveal the overall Feng Shui configurations. Throughout the course of that on-site survey, this study first examined Mount Duseung and Mount Bangjang, also known as Mount Yeongju (sometimes collectively known as Mount Samshin), Mount Dongjuk, Mount Mangje-bong, Mount Maebong, and Mount Shiru. Then, this study stated some of the underlying issues through a scholarly approach based on various theories such as traditional geographical texts and theories on mountain-growth and water-flow from the perspective of Feng Shui. In particular, attention was paid to theoretical aspects of the uninterrupted and undulating flow of the terrain leading to Shiru Mountain. As a result, from a Feng Shui point of view, the connected network geomantic veins in the area of Kang Jeungsan's birthplace and the feng shui features and conditions were all examined through an on-site survey. The survey results revealed that the area forms a large Feng Shui site due to the vast interconnectivity among all the mountains that extend from the Honam vein and form organic relationships with one another. This even includes Mount Samshin in Honam. Considering the geographical conditions that formed a site that enabled harmony between divine beings and humankind, the surrounding place names also provide allusions to the understanding of the birth of Kang Jeungsan as the descent of Supreme God into the human world through the historical figure, Kang Jeungsan. This area is an ideal spot with a propitious spatial arrangement in terms of its Feng Shui. Feng Shui analysis reveals the site to be a place that holds an earth energy-hub transmitting a great energy of nature that cannot be measured by human power alone.

A Study on the Trend of New Town Planning of Malaysia (말레이시아 신도시 주거단지 개발 경향 연구)

  • Ju, Seo-Ryeung;Choi, Yun-Kyung;Lee, Li-Na
    • Journal of the Korean housing association
    • /
    • v.21 no.5
    • /
    • pp.103-113
    • /
    • 2010
  • The post-war period has witnessed the emergence of new towns in a number of countries in Southeast Asia. The new town development in Malaysia started with Petaling Jaya (PJ) as a satellite town in 1953 to accommodate the rapid growing population of Kuala Lumpur (KL). Shah Alam (SA), Subang Jaya (SJ) are all located in the Klang Valley and act as an important social and economic development hub in the nation. New towns have been designed in accordance with the British town planning principles, which were based on the model of a modern ideal city. They constituted a new regional character because they were developed taking into consideration factors such as local technologies as well as site and, climatic conditions. The initial goal of the new town construction and planning, which focused basically on resettling squatters, was later changed to focus on the improvement of the quality of living. This phenomenon was related to the emergence of the middle class, which had grown rapidly ever since. With the public agencies, the private sectors have played an important role in providing viable and sustainable human units of settlement that address the new design issues of new town planning. The goal of this study is to identify the identity of the recent new town planning principles of Malaysia, how they were developed over time and how they were regionalized and transformed in a cultural and regional context. For the analysis, we chose 3 new towns which are located in Klang Valley and which are representative recent projects of two major housing development companies in Malaysia. To identify the planning principles, we analyzed these projects in the viewpoint of the urban space, street system, and housing blocks and units.

Design and Development of Carbon Emission Monitoring System in Sejong City, Korea (세종시 탄소배출 모니터링시스템(CEMS)의 설계)

  • Leem, Yountaik
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.2
    • /
    • pp.482-493
    • /
    • 2014
  • Many kinds of carbon emission monitoring systems or integrated systems have been developed so far. However, despite of the development of related techniques, they tend to be lack of statistic processing functions for feedback and policy-making data for users. In this study, a new CEMS (Carbon Emission Monitoring System) has been suggested and implemented in Sejong City, Korea. This system adapted automatic remote reading system from the site management agency as data hub to collect the electricity, gas and water usage of each household. The CEMS is consisted of 6 parts; carbon emission measurement, carbon emission standard setup and management, statistic analysis and the incentives. CEMS is distinguished with other systems for its UIs for users and the administrators. Also, data sharing with urban information system(UIS) of local government to produce information for users and policy-makers. This system makes it possible to investigate the change of energy consumption patterns, especially depending on the family structure and the housing characteristics. Furthermore, analyzing their correlation with carbon emission, it is expected to provide basic data used to establish urban environmental policies.

Implementation of PC based Motor Fault Diagnosis System (PC 기반 전동기 고장 진단 시스템의 구현)

  • Doo, Seung-Ho;Park, Jin-Bae;Kwak, Ki-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2006.07d
    • /
    • pp.2195-2196
    • /
    • 2006
  • This study is for implementation of PC based Motor fault diagnosis system. By using harmonics and current signals of the motor, this system diagnoses the motor condition by accumulated harmonic contribution rate. In this proposed system that was composed of 5 parts. A sensor, connection box, evaluation board, device server, and main computer are those. There were two types of sensor, one was harmonic sensor the other was current sensors. The signal was acquired by sensor, and transferred to evaluation board. Second one is connection box. Because the output type of sensor and input type of evaluation board is different, connection box was necessary. Third one was evaluation board. The signal from the sensor was converted to digital signal in evaluation board. And this signal was transferred to device server. Fourth one was device server. Device server transferred the data from evaluation board to main computer. And the last one was other parts controlled by main computer. In main computer, there were communication and diagnosis algorithms. The result was derived by main computer. In the result, there were 12 categories and 5 levels of motor conditions. The proposed system had some advantages comparing with stand alone type commercial motor fault diagnosis system. The first, by using remote access it was easier to get the conditions of motor. The second, there was no need to handle the sensors when users measured the motor signals. By this property, no one was necessary at motor location site. The third, this system was less restricted by times and places than commercial stand alone type diagnosis system. Therefore users can operate this system only using the main computer. Once the sensors are installed at the motor, users doesn't need to move to check up the condition of motors. Moreover, if there is ethernet hub, many motors can be not only diagnosed at once but also decreased its cost.

  • PDF

Implementation of PC based Motor Fault Diagnosis System (PC 기반 전동기 고장 진단 시스템의 구현)

  • Doo, Seung-Ho;Park, Jin-Bae;Kwak, Ki-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.563-564
    • /
    • 2006
  • This study is for implementation of PC based Motor fault diagnosis system. By using harmonics and current signals of the motor, this system diagnoses the motor condition by accumulated harmonic contribution rate. In this proposed system that was composed of 5 parts. A sensor, connection box, evaluation board, device server, and main computer are those. There were two types of sensor, one was harmonic sensor the other was current sensors. The signal was acquired by sensor, and transferred to evaluation board. Second one is connection box. Because the output type of sensor and input type of evaluation board is different, connection box was necessary. Third one was evaluation board. The signal from the sensor was converted to digital signal in evaluation board. And this signal was transferred to device server Fourth one was device solver. Device server transferred the data from evaluation board to main computer. And the last one was other parts controlled by main computer. In main computer, there were communication and diagnosis algorithms. The result was derived by main computer. In the result, there were 12 categories and 5 levels of motor conditions. The proposed system had some advantages comparing with stand alone type commercial motor fault diagnosis system. The first, by using remote access it was easier to get the conditions of motor. The second, there was no need to handle the sensors when users measured the motor signals. By this Property, no one was necessary at motor location site. The third, this system was less restricted by times and places than commercial stand alone type diagnosis system. Therefore users can operate this system only using the main computer. Once the sensors are installed at the motor, users doesn't need to move to check up the condition of motors. Moreover, if there is ethernet hub, many motors can be not only diagnosed at once but also decreased its cost.

  • PDF