• Title/Summary/Keyword: hospital construction

Search Result 336, Processing Time 0.025 seconds

Practical use of computational building information modeling in repairing and maintenance of hospital building- case study

  • Akhoundan, Majid Reza;Khademi, Kia;Bahmanoo, Sam;Wakil, Karzan;Mohamad, Edy Tonnizam;Khorami, Majid
    • Smart Structures and Systems
    • /
    • v.22 no.5
    • /
    • pp.575-586
    • /
    • 2018
  • Computational Building Information Modeling (BIM) is an intelligent 3D model-based process that provides architecture, engineering, and construction professionals the insight to plan, design, construct, and manage buildings and infrastructure more efficiently. This paper aims at using BIM in Hospitals configurations protection. Infrastructure projects are classified as huge structural projects taking advantage of many resources such as finance, materials, human labor, facilities and time. Immense expenses in infrastructure programs should be allocated to estimating the expected results of these arrangements in domestic economy. Hence, the significance of feasibility studies is inevitable in project construction, in this way the necessity in promoting the strategies and using global contemporary technologies in the process of construction maintenance cannot be neglected. This paper aims at using the building information modeling in covering Imam Khomeini Hospital's equipment. First, the relationship between hospital constructions maintenance and repairing, using the building information modeling, is demonstrated. Then, using library studies, the effective factors of constructions' repairing and maintenance were collected. Finally, the possibilities of adding these factors in Revit software, as one of the most applicable software within BIM is investigated and have been identified in some items, where either this software can enter or the software for supporting the repairing and maintenance phase lacks them. The results clearly indicated that the required graphical factors in construction information modeling can be identified and applied successfully.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

Energy Performance Analysis for Energy Saving Potentials of a Hospital Building : A Case Study Methodology Based on Annual Energy Demand Profiles (병원건물의 에너지 저감을 위한 에너지성능 평가에 관한 사례연구)

  • Cho, Jinkyun;Moon, Junghwan;Kang, Hosuk
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.1
    • /
    • pp.29-37
    • /
    • 2017
  • Hospitals contribute to energy consumption and have a negative environmental impact. This study aims to find how meaningful energy performance, reflecting good energy management and design, can be planned for hospital buildings, a category encompassing complex buildings with different setups and large differences between them. Energy-consumption characteristics were surveyed throughout Korea to establish statistical energy models. Findings confirm that different hospital departments have hugely different energy-demand profiles. Energy efficiency and energy-saving potentials on HVAC systems are presented. The energy performance analysis can be applied to a wide range of problems in energy-system design and planning, including simulations and optimizations of community energy systems.

A Case Study on the Remodeling of K Hospital in Korea (국내 종합병원의 리모델링 사례 연구 - H병원을 중심으로 -)

  • 양내원
    • Korean Institute of Interior Design Journal
    • /
    • no.29
    • /
    • pp.173-180
    • /
    • 2001
  • The present time this country is faced with general hospital building remodeling time from the constructing age. In architecture, one of the reconstruction of consciousness, remodeling significance Is restoration of capacity a generally structure. Through this research we acquire concluding remarks. 1) In hospital extension and reconstruction works set a different counterplot proportionately with part that are the ward areas, the outpatient areas, the diagnosis/treatment areas, the supply areas, the administration areas, the education/research areas, the miscellaneous areas etc. According to department's character and use various purposes take proper measures. Then it estimation that remodeling study shall be need. 2) It is advisable the way of connection the existing facilities if it extended case. The case of K hospital has been extended outskirts the main building. As this an enlargement of a outhouse has an advantage that secure construction area at a stretch and no exert Influence on both nature lighting and construction matter. On the contrary caused [defect that is repeatedly occur a faculty relocation and the inner part alteration because of it\`s post transfer.

  • PDF

A Case Study of the Construction Project Management Applied to New Catholic Medical Center Construction Project ('가톨릭중앙의료원 새병원 및 성의회관 건립공사'CM수행사례 소개)

  • Kim, Hyo-Seong;Park, Young-Soon;Kim, Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.37-44
    • /
    • 2006
  • The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.

  • PDF

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA (ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가)

  • Kwon, Soon Jung;Yu, Yeo Kyoung;Kim, Jihyun;Bang, Seol Ah
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.1
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

A Study on the Zoning of Wards and Intensive Care Units (ICUs) in the Infectious Disease Hospital (감염병전문병원의 병동부 및 중환자부 영역 구성에 관한 연구)

  • Lee, Joorang;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.29 no.3
    • /
    • pp.17-28
    • /
    • 2023
  • Purpose: This study aims to provide basic data for the future construction plans of the Infectious Disease Hospitals by analyzing the area composition and required room ratios in the wards and ICU of currently under-construction infectious disease hospitals. Methods: 3 Methods have been used in this paper. 1) This study conducted a literature review on major considerations and related guidelines for hospitals specializing in infectious diseases using existing data. 2) Based on the objects and activities of the hospital space, zones and areas were set for each department according to infection control. 3) Based on the established zones and areas, basic plan drawings of three hospitals specializing in infectious diseases currently under construction were collected and architectural drawing analysis was performed. Results: 1) Infectious Diseases Hospital must have a spatial organization that can accommodate patient isolation, infection control, efficiency of medical service, and changes. 2) Zones for infection control are divided into negative pressure and non-negative pressure zones based on airborne precaution isolation. It is divided into clean and contaminated zone according to class of cleanliness by Aseptic technique. Areas are classified by objects (patients, healthcare workers, supplies) and activities (access, medical treatment, support), and a system for organizing space is established based on this. 3) By analyzing the area composition of each departmental area, each required room, and each required space in the wards and intensive care units, it provides basic data for the spatial organization for architectural planning of the infectious disease hospital. Implication: It can be used as basic data when planning related facilities by analyzing the characteristics of the space plan of the required room according to the relationship between activities, movement lines, and operation plans based on user behavior.

The Relationship between Hospital Selection by Employer and Disabilities in Occupational Accidents in Korea

  • Ahn, Joonho;Jang, Min;Yoo, Hyoungseob;Kim, Hyoung-Ryoul
    • Safety and Health at Work
    • /
    • v.13 no.3
    • /
    • pp.279-285
    • /
    • 2022
  • Background; In the event of an industrial accident, the appropriate choice of hospital is important for worker health and prognosis. This study investigates whether the choice of hospital by the employer in the case of industrial accidents affects the prognosis of injured employees. Methods; Data from the 2018 Panel Study of Workers' Compensation Insurance in Korea were used in an unmatched case-controlled study. The exposure variable is "hospital selection by an employer," and the outcome variable is 'worker's disability." Odds ratios (ORs) were estimated by modified Poisson regression and adjusted for age, gender, underlying disease, injury severity, and workplace size and stratified by industrial classification. The group at increased risk was analyzed and stratified by age, gender, and area. Results; In the construction industry, hospital selection by the employer was significantly associated with increased risk of disability (adjusted OR 1.26; 95% confidence interval [CI]; 1.20-1.32) and severe disability (adjusted OR 1.38; 95% CI; 1.08-1.76) among the injured. Female and younger workers not living in the Seoul capital area were more at risk of disability and severe disability than those living in the Seoul capital area. Conclusions; Hospital selection by employers affects the prognosis of workers injured in an industrial accident. For protecting workers' health and safety, workplace emergency medical systems should be improved, and the selection of appropriate hospitals to supply treatment should be reviewed.

An Analysis of Important Factors for Energy Efficient Healthcare Facilities on Experts' Survey (전문가 설문조사를 통한 에너지 효율적인 병원시설을 위한 중요한 영향요소의 분석)

  • Choi, Yeo-Jin;Choi, Yool
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.45-50
    • /
    • 2017
  • Purpose: There have been more researches focused on eco-friendly construction practices in order to save energy consumed and these practices have been extensively applied for constructing buildings. However, researches on energy consumption saving and efficiency for hospital facilities have been still insufficient. This research aims to draw factors that affect energy efficiency of hospital buildings through literature reviews and perform an expert-survey using AHP(Analytical Hierarchy Process) method in order to analyze the importances and priorities of these energy efficient factors. Method: Using the AHP method, this paper suggests the importances and priorities of factors to affect energy efficiency in hospital buildings. The survey of experts at a architectural design and a construction management companies was conducted via e-mail and mail. Result: As a result, factors of window and door, insulation, ventilation, and natural lighting turned out relatively important as respectively 0.104, 0.102, 0.101, and 0.095 n the energy efficiency in hospital buildings, while factors of artificial lighting, geothermal, solar heat, and control did unimportant as 0.027, 0.033, 0.043, and 0.053.