The existing Highway LA-1 of US is required to be replaced for covering increasing regional demands of transportation such as Hurricane evacuation and oil industry. This 28 km crosses wetlands and is a sensitive environmental area. Huge amount of soil investigation and laboratory tests were performed with best efforts to overcome inherit errors of sampling, disturbance, and testing procedures for this project. The data scattering was corrected through using central tendency theory.
International conference on construction engineering and project management
/
2005.10a
/
pp.699-704
/
2005
Normally, monetary penalties for breach of agreement will be stipulated in the contract. The contractor parties, who fail to fulfill the agreement, are required to pay the other parties a certain amount or proportion of money as a fine. However, it is worth our study - whether or not the scope of monetary penalty implementation and bases for determination of a fine will cover the losses of social and administrative costs incurred by the interruption of the contract. This research is about the best timing for government to cancel the freeway repair work contracts. Under the goal of the maximum social welfare, the limitation of government spending for the social and administrative costs invoked by interruption of contracts will have to be considered to attain the best timing of contracts' suspension or deferment. According to the factors of social and administrative costs, the best time point is calculated to reduce the loss of the aforesaid costs, which can also be used as theoretical basis for the future road-widening construction at home.
International conference on construction engineering and project management
/
2015.10a
/
pp.606-607
/
2015
The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).
PURPOSES: The purpose of this study is to develop a methodology to prioritize sidewalk construction on rural national highways. METHODS : In order to determine an appropriate prioritization for sidewalk construction, we developed a specific methodology. The proposed methodology includes three main steps: 1) Analytic Hierarchy Process (AHP) methods, 2) Subjective evaluation of relevant road agencies for the candidate sidewalks along rural national highways, and 3) Field study conduction. Each step has four phases. The primary feature of this methodology is the addition of expert consultation and survey data, as well as a field study. In addition, the method could guarantee flexibility in selection for evaluation criteria. As a result, the proposed methodology could be used as a general procedure for application to other roadway classifications when considering sidewalk construction. RESULTS: In order to demonstrate the reasonableness of the proposed methodology, a case study was performed for exactly 100 candidate sites for sidewalk construction on rural national highways. All required evaluation scores were properly produced for each candidate site. By doing so, decision-makers can determine the priority for sidewalk construction at these sites by reviewing quantitatively and qualitatively considered data. CONCLUSIONS: The results of the case study can be applied to a long-term fundamental plan for sidewalk construction on rural national highways. Furthermore, this methodology could be employed to prioritize a small-scale SOC project(e. g. bicycle or pedestrian roads).
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.10
no.4
/
pp.44-54
/
2011
Intelligent transport services on smart roads tend to have a problem at the stage of benefit-cost analysis that can not secure economic feasibility of the new services which increase early investment cost on building its infrastructure. It is expected that the number of road accidents, 'Incident/Accident', will decline through various safety services using intelligent safety facilities, intelligent transport management and so on, and that traffic congestion will also decrease. The effect of traffic congestion reduction could be the benefit by safety improvement, however current investment-analysis process in Korea does not appropriate it as a benefit. This study estimated road blocking time with 'Incident/Accident' classification and highway accident data of past three years. It also developed a generalized model by a regression analysis with a microscopical simulation. Furthermore, it suggested necessary units on quantitative analysis in order to make the developed model applicable to investment evaluation. As a result of applying the developed model to Smart-Highway Project, it showed that total safety improvement benefit is about 139 billion dollars over 30 years when it is supposed that accident decreasing rate by smart safety facilities is 10%.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.3D
/
pp.355-361
/
2011
In order to properly evaluate ITS services exposed in SMART Highway project, a confident dynamic origin-destination (OD) is inevitably needed. This paper used WAVE communication information as a part of call and response (C&R) communication which constitutes core part of the technology for constructing OD. This information includes node information and vehicle information (e.g., latitude and longitude) as well as trajectory data and sample path volume date calculated using node information and vehicle information. A procedure developed to construct a dynamic OD and to validate OD is consist of 1) making toy network and one-hour 00 (random distribution), 2) collecting link information and vehicle information, 3) constructing five-minute OD, and 4) validating estimated OD result using traffic volume and travel time simultaneously. The constructed OD is about 84.79% correct within less than 20% error range for 15min traffic volume, and about 85.42%, within less than 20% error rate of 15 min travel time. Some limitations and future research agenda have also been discussed.
The main purpose of this paper is to apply Zone 30 system which is being experimented in advanced country for the solution of controlling the residential street's speed to our country with the consideration of the real condition of our street and traffic and to run this system as an example to analyze the effect and at the same time, analyze the problem and get appropriate preparation for this system to be widespread. The area to run this model project is Goyang City Ilsan-Gu.($0.65km^2$) which is close with the commercial area reflecting the opinion of experts and an on-site verification by the National Police Agency T/F and is having a heavy pedestrian traffic and the risk of pedestrian accident. Firstly we defined residential street and residential street area to review the system and devided the residential street type to establish a plan of operation. Afterwards, we thoroughly examined the model project area and analyzed the problem and solution. We finally completed establishing a facilities by conference with a local autonomous entity with the improvement of facility's sketch at the analysis of the model project area. The result of effects analysis which we devided after and before of establishment is that vehicle speed be reduced 5~15km/h, and traffic accidents has decreased by 24 percent.
Korean Journal of Construction Engineering and Management
/
v.15
no.6
/
pp.83-91
/
2014
The global community demands the reduction of environmental pollution such as greenhouse gas and carbon dioxide emissions. According to these requirements, the road construction project in the highest energy consuming industry is required the efficient way of reducing environmental pollution emissions. In this study, during the whole life cycle process, an environment impact assessment was performed for the several road construction projects in order to evaluate environmental stress through the road construction process. This study provides a proper process of environment impact assessment for life cycle assessment (LCA) analysis of road construction project, and figures the environmental stress regarding to the major construction materials for the case projects. In addition, this study conducted a sensitivity analysis for the key materials of environmental stress through the quantity analysis of major materials for the 1km section of a road construction. By this sensitivity analysis of total environmental stress change from the different volumes of constructing materials, it would be useful information for the environment impact assessment for the future road construction project.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.6
/
pp.1405-1412
/
2015
In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.
Journal of the Computational Structural Engineering Institute of Korea
/
v.20
no.5
/
pp.511-520
/
2007
There is a concern with worldwide deterioration of highway bridges, particularly reinforced concrete. The advantages of fibre reinforced plastic(FRP) composites over conventional materials motivate their use in highway bridges for replacement of structures. Recently, an FRP deck has been installed on a state highway, located in New York State, as an experimental project. In this paper, a systematic approach for analysis of this FRP deck bridge is presented. Multi-step linear numerical analyses have been performed using the finite element method to study the structural behavior and the possible failure mechanism of the FRP deck-superstructure system. Deck's self-weight and ply orientations at the interface between steel girders and FRP deck are considered in this study. From this research, the results of the numerical analyses were corroborated with field test results. Analytical results reveal several potential failure mechanism for the FRP deck and truss bridge system. The results presented in this study may be used to propose engineering design guideline for new and replacement FRP bridge deck structure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.