• Title/Summary/Keyword: highway project

Search Result 200, Processing Time 0.028 seconds

Case Study Of Reducing Specimen Disturbance Using Vertical Fixing Sample Frame (VFSF) (연직고정장치(VFSF)를 활용한 불교란시료의 교란효과 저감사례)

  • Lim, Beyong-Seok;Seo, Deok-Dong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.55-66
    • /
    • 2006
  • The existing Highway LA-1 of US is required to be replaced for covering increasing regional demands of transportation such as Hurricane evacuation and oil industry. This 28 km crosses wetlands and is a sensitive environmental area. Huge amount of soil investigation and laboratory tests were performed with best efforts to overcome inherit errors of sampling, disturbance, and testing procedures for this project. The data scattering was corrected through using central tendency theory.

  • PDF

RESEARCH OF THE BEST TIMING FOR GOVERNMENT'S TERMINATION OF FREEWAY REPAIR WORK CONTRACT

  • Jin-Fang Shr;Da-Jung Chang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.699-704
    • /
    • 2005
  • Normally, monetary penalties for breach of agreement will be stipulated in the contract. The contractor parties, who fail to fulfill the agreement, are required to pay the other parties a certain amount or proportion of money as a fine. However, it is worth our study - whether or not the scope of monetary penalty implementation and bases for determination of a fine will cover the losses of social and administrative costs incurred by the interruption of the contract. This research is about the best timing for government to cancel the freeway repair work contracts. Under the goal of the maximum social welfare, the limitation of government spending for the social and administrative costs invoked by interruption of contracts will have to be considered to attain the best timing of contracts' suspension or deferment. According to the factors of social and administrative costs, the best time point is calculated to reduce the loss of the aforesaid costs, which can also be used as theoretical basis for the future road-widening construction at home.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Methodology for Prioritizing Sidewalk Construction among 100 Candidate Sites on Rural National Highways (지방부 국도에서의 보도설치 우선순위 결정을 위한 방법론 개발 (일반국도 적용사례 중심으로))

  • Jeon, Woo Hoon;Yang, Choong Heon;Yoon, Jung Eun;Yang, Inchul
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.127-133
    • /
    • 2015
  • PURPOSES: The purpose of this study is to develop a methodology to prioritize sidewalk construction on rural national highways. METHODS : In order to determine an appropriate prioritization for sidewalk construction, we developed a specific methodology. The proposed methodology includes three main steps: 1) Analytic Hierarchy Process (AHP) methods, 2) Subjective evaluation of relevant road agencies for the candidate sidewalks along rural national highways, and 3) Field study conduction. Each step has four phases. The primary feature of this methodology is the addition of expert consultation and survey data, as well as a field study. In addition, the method could guarantee flexibility in selection for evaluation criteria. As a result, the proposed methodology could be used as a general procedure for application to other roadway classifications when considering sidewalk construction. RESULTS: In order to demonstrate the reasonableness of the proposed methodology, a case study was performed for exactly 100 candidate sites for sidewalk construction on rural national highways. All required evaluation scores were properly produced for each candidate site. By doing so, decision-makers can determine the priority for sidewalk construction at these sites by reviewing quantitatively and qualitatively considered data. CONCLUSIONS: The results of the case study can be applied to a long-term fundamental plan for sidewalk construction on rural national highways. Furthermore, this methodology could be employed to prioritize a small-scale SOC project(e. g. bicycle or pedestrian roads).

Quantitative Analysis of Safety Improvement on Smart Roads (스마트도로 안전성 향상 효과의 정량화 연구)

  • Chang, Hyun-Ho;Baek, Seung-Kirl;Oh, Sung-Ho;Kim, Ho-Jeung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.4
    • /
    • pp.44-54
    • /
    • 2011
  • Intelligent transport services on smart roads tend to have a problem at the stage of benefit-cost analysis that can not secure economic feasibility of the new services which increase early investment cost on building its infrastructure. It is expected that the number of road accidents, 'Incident/Accident', will decline through various safety services using intelligent safety facilities, intelligent transport management and so on, and that traffic congestion will also decrease. The effect of traffic congestion reduction could be the benefit by safety improvement, however current investment-analysis process in Korea does not appropriate it as a benefit. This study estimated road blocking time with 'Incident/Accident' classification and highway accident data of past three years. It also developed a generalized model by a regression analysis with a microscopical simulation. Furthermore, it suggested necessary units on quantitative analysis in order to make the developed model applicable to investment evaluation. As a result of applying the developed model to Smart-Highway Project, it showed that total safety improvement benefit is about 139 billion dollars over 30 years when it is supposed that accident decreasing rate by smart safety facilities is 10%.

A Dynamic OD Construction Methodology using Vehicle Trajectory in Ideal C&R Communication Environment (이상적 C&R 환경에서의 궤적자료를 이용한 동적 OD 구축에 관한 연구)

  • Lee, Jungwoo;Choi, Keechoo;Park, Sangwook;Son, Bumsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.355-361
    • /
    • 2011
  • In order to properly evaluate ITS services exposed in SMART Highway project, a confident dynamic origin-destination (OD) is inevitably needed. This paper used WAVE communication information as a part of call and response (C&R) communication which constitutes core part of the technology for constructing OD. This information includes node information and vehicle information (e.g., latitude and longitude) as well as trajectory data and sample path volume date calculated using node information and vehicle information. A procedure developed to construct a dynamic OD and to validate OD is consist of 1) making toy network and one-hour 00 (random distribution), 2) collecting link information and vehicle information, 3) constructing five-minute OD, and 4) validating estimated OD result using traffic volume and travel time simultaneously. The constructed OD is about 84.79% correct within less than 20% error range for 15min traffic volume, and about 85.42%, within less than 20% error rate of 15 min travel time. Some limitations and future research agenda have also been discussed.

The Effects Analysis and Model Project on Speed Management in Commerical Area Street (상업지역 생활도로 속도관리 시범운영 및 효과분석)

  • Shim, Kywan-Bho;Heo, Nak-Won
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.119-127
    • /
    • 2011
  • The main purpose of this paper is to apply Zone 30 system which is being experimented in advanced country for the solution of controlling the residential street's speed to our country with the consideration of the real condition of our street and traffic and to run this system as an example to analyze the effect and at the same time, analyze the problem and get appropriate preparation for this system to be widespread. The area to run this model project is Goyang City Ilsan-Gu.($0.65km^2$) which is close with the commercial area reflecting the opinion of experts and an on-site verification by the National Police Agency T/F and is having a heavy pedestrian traffic and the risk of pedestrian accident. Firstly we defined residential street and residential street area to review the system and devided the residential street type to establish a plan of operation. Afterwards, we thoroughly examined the model project area and analyzed the problem and solution. We finally completed establishing a facilities by conference with a local autonomous entity with the improvement of facility's sketch at the analysis of the model project area. The result of effects analysis which we devided after and before of establishment is that vehicle speed be reduced 5~15km/h, and traffic accidents has decreased by 24 percent.

Evaluation of Environmental Stress for Highway Construction Project by Life Cycle Assessment Method (전과정평가기법에 의한 도로건설공사 환경부하량 평가 연구)

  • Moon, Jinseok;Ju, Kibeom;Seo, MyoungBae;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.83-91
    • /
    • 2014
  • The global community demands the reduction of environmental pollution such as greenhouse gas and carbon dioxide emissions. According to these requirements, the road construction project in the highest energy consuming industry is required the efficient way of reducing environmental pollution emissions. In this study, during the whole life cycle process, an environment impact assessment was performed for the several road construction projects in order to evaluate environmental stress through the road construction process. This study provides a proper process of environment impact assessment for life cycle assessment (LCA) analysis of road construction project, and figures the environmental stress regarding to the major construction materials for the case projects. In addition, this study conducted a sensitivity analysis for the key materials of environmental stress through the quantity analysis of major materials for the 1km section of a road construction. By this sensitivity analysis of total environmental stress change from the different volumes of constructing materials, it would be useful information for the environment impact assessment for the future road construction project.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

Study of Failure Mode and Static Behavior of Lightweight FRP Truss Bridge Deck System (복합재료 트러스 교량시스템의 정적거동 및 파괴모드에 관한 해석적 연구)

  • Jung, Woo-Young;Lee, Hyung-Kil
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.5
    • /
    • pp.511-520
    • /
    • 2007
  • There is a concern with worldwide deterioration of highway bridges, particularly reinforced concrete. The advantages of fibre reinforced plastic(FRP) composites over conventional materials motivate their use in highway bridges for replacement of structures. Recently, an FRP deck has been installed on a state highway, located in New York State, as an experimental project. In this paper, a systematic approach for analysis of this FRP deck bridge is presented. Multi-step linear numerical analyses have been performed using the finite element method to study the structural behavior and the possible failure mechanism of the FRP deck-superstructure system. Deck's self-weight and ply orientations at the interface between steel girders and FRP deck are considered in this study. From this research, the results of the numerical analyses were corroborated with field test results. Analytical results reveal several potential failure mechanism for the FRP deck and truss bridge system. The results presented in this study may be used to propose engineering design guideline for new and replacement FRP bridge deck structure.