• 제목/요약/키워드: highway investigation

Search Result 164, Processing Time 0.034 seconds

Improvement Plan through Investigation and Analysis of Road Signs of National Highway (일반국도 도로표지 조사 및 분석을 통한 개선방안 도출)

  • Lee, Woo-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.8
    • /
    • pp.604-609
    • /
    • 2019
  • A variety of complaints about road signs have occurred for various reasons, such as new road facilities, new road signs such as road name signs, and an increase in nearby important facilities. In addition, there are many road signs that are in violation of road sign regulations. The basic principles of road signs, the connectivity of guide names, the location suitability, and a consistent road sign guidance system have not implemented. To solve these problems, various errors were investigated on major road signs on eight national highways, including direction signs, distance signs, boundary signs, and route signs. In addition, we classified the errors on road signs by grade to give them maintenance priority. We also analyzed the error status of signs for each route and grade. Based on the data, the problems of the road signs were derived, and an improvement plan is discussed. Based on this research, more systematic installation and management of road signs through cooperation between the government and local governments could increase the efficiency of road signs, as well as provide safer and more convenient road sign guidance systems for road users.

A Review of the Deterioration and Damage of the Top Flange of the Highway PSC Box Girder Bridge based on the Condition Assessment Results (상태평가 결과 기반 고속도로 PSC Box 거더교 상부플랜지 열화·손상 실태 고찰)

  • Ku, Young-Ho;Han, Sang-Mook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.6
    • /
    • pp.23-32
    • /
    • 2022
  • Although PSCB girder bridges account for 4% of the bridges in use on highways, they do not account for much, but 98% of PSCB girder bridges are 1st type and 2nd type of bridge. Also, the total length of the PSCB girder bridge is 16% (192km) of the total length of the highway bridge. Thus, the PSCB girder bridge can be one of the bridge types where maintenance is important. In order to analyze the damage types of PSCB girder bridges, a detailed analysis was conducted by selecting 62 places (477 spans) precision safety diagnosis reports considering ratio of the construction method and snow removal environment exposure class. Analysis of report and a field investigation was conducted, and as a result, most of the causes of deterioration damage were caused by rainwater (salt water) flowing into the bridge pavement soaking in between the top flange and the interface. After concrete slab deteriorate occurred then bridge pavement cracking and breaking increased and exfoliation of concrete occurred by corrosion and expansion of the reinforcing bars occurred. In addition, the cause of cracks in the longitudinal direction on the bottom of the top flange is considered to be cracks caused by restrained drying shrinkage. In conclusion, for reasonable maintenance considering the characteristics of PSCB girder bridges, it should be suggested in the design aspect that restrained drying shrinkage crack on top flange. Also, it is believed that differentiated maintenance method should be proposed according to snow removal environment exposure class.

Characteristics of Slope Failure induced by Typhoon and an Examination of a Standard Slope Inclination for Design (태풍에 의한 절개면 붕괴특성 연구 및 경사도 설계기준 검토)

  • Koo, Ho-Bon;Baek, Yong;Kwon, O-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.117-122
    • /
    • 2003
  • Every year in domestic slope failure caused by rainfall is happening frequently. Specially, causable failure accident by localized downpour accompanied when summer rainy season period and produces typhoon gets damage of large scale human life and property. Failure happened at slope of 121 places ranged whole country national highway by No.15 typhoon Rusa that strike whole country during 3 days from August 30, 2002. Slope failure that happen by typhoon are judged for major cause to effect of ground saturation and surface water by localized downpour. In this research, failure characteristic was analyzed to target 20 places attaining site investigation among failure slope. As a result, erosions by surface water was construed for major cause of failure and judged for direct relation in failure slope weathering and topography Also, result that analyze inclination of failure part, in the case of ripping rock, inclination of failure side is forming Incline of the lowest 40$^{\circ}$, because surface failure of depth 4m on or so scale happened, it is require that regulating plan gently design standard inclination of weathered rock and soil layer And it is considered that desirable preparation of design standard about measure that help smooth drainage of surface water and can restrain percolation in ground to reduce failure damage by rainfall.

  • PDF

A Study on Performance Warranty Criteria for Expressway Jointed Concrete Pavements (고속국도 줄눈 콘크리트 포장 성능보증 기준 연구)

  • Yeo, Hyun-Dong;Ahn, Deok-Soon;Suh, Young-Chan;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.65-73
    • /
    • 2011
  • Recently, researches to introduce the performance warranty contract are in progress for quality improvement of road pavements. The performance warranty contract is a type of contract in which contractors guarantee to maintain certain level of performance during a period from completion of construction. The contract use in Europe and the U.S is being increased because it has been known to contribute to improvement of structure quality, reduction of life cycle cost, development of construction techniques, and etc. The research on performance indicators, threshold values, and warranty durations is essential to effectively introduce the contract in Korea. In this study, literatures on the performance warranty contract for concrete pavements of the Minnesota, Indiana, and Florida of the U.S. were reviewed. Major distresses influencing the pavement performance were investigated and analyzed in the jointed concrete pavement sections of 21 Korean expressway routes to be compared to the performance indicators, threshold values, and warranty durations of the states. More accurate comparison is expected by investigation in planned sections for a long time.

Identification of the microstructural components of crumb rubber modified asphalt binder (CRMA) and the feasibility of using environmental scanning electron microscopy (ESEM) coupled with energy dispersive X-Ray spectroscopy (EDX) (ESEM과 EDX를 사용한 CRM 바인더의 미세구조 성분 분석)

  • Kim, Hyun Hwan;Mithil, Mazumder;Lee, Moon Sup;Lee, Soon Jae
    • International Journal of Highway Engineering
    • /
    • v.18 no.6
    • /
    • pp.41-50
    • /
    • 2016
  • OBJECTIVES : In this study, microstructural components of crumb rubber modified asphalt (CRMA) binder were investigated using environmental scanning electron microscope (ESEM). To clearly understand the elemental composition of the CRMA binder, energy dispersive X-ray spectroscopy (EDX) was employed on the ESEM samples. METHODS : CRMA binders were produced using open blade mixers at $177^{\circ}C$ for 30 min. The binders were artificially aged through a series of accelerated aging processes. Sample preparation was done by making a mold shape on the glass slide. Thereafter, the morphology of the CRMA binder was observed using the ESEM coupled with the EDX. RESULTS : The images captured from the ESEM indicate that the unaged CRMA binder appears to have a single-phase continuous nonuniform structure after the addition of crumb rubber particles, whereas the artificially aged CRMA binder was observed to have two different phases. ESEM coupled with EDX shows detailed internal structure of the modified binders compared to other technologies (i.e., optical microscopy, atomic force microscopy, and conventional scanning electron microscope). CONCLUSIONS : The captured images resemble the internal structures such as the viscous properties of the unaged CRMA binder and the interaction between the rubber particles and the base binder at aged condition. ESEM is a powerful instrument and with the introduction of EDX, it provided more details of the network microstructure of the asphalt binder. ESEM coupled with EDX is recommended for use in future investigation of microstructure of asphalt binders.

Slope Stability Analysis and Suggestion of Stabilization Methods on Failed Cut-Slopes Interbedded with Weakness Layer (연약층이 협재된 절개면의 안정성 해석 및 대책)

  • 구호본;이대영;김학준
    • The Journal of Engineering Geology
    • /
    • v.13 no.2
    • /
    • pp.157-170
    • /
    • 2003
  • This study is performed to investigate the cause of slope failure and to suggest suitable stabilization methods for the failed rock slopes. The slope which is located along the national highway between Maesan and Kakok in Dangjin-gun failed during the construction of roads. Site investigation, drilling program, field measurements, rainfall records, and stability analyses are used to investigate the cause of the slope failure. The problem determining the cut-slope angle based on the existing design manual for the construction of roads is reviewed based on the case history given in this paper. If weakness layer and geological structures such as folds and faults are developed in a slope, slope failure is possible even though the direction of slope and the direction of discontinuities depart more than $30^{\circ}$.

Investigation of Optimal Construction Procedures for Concrete Underpass Structures Considering Heat of Hydration (수화열을 고려한 콘크리트 지하차도 적정 시공법 분석)

  • An, Zu-Og;Kim, Seong-Min;Kim, Dong-Ryun
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.229-238
    • /
    • 2009
  • This paper describes the methods to propose the optimal material properties and construction steps that prevent cracks due to the thermal stresses induced by the hydration heat under the construction of the concrete underpass structures. To achieve the goal of this study, the heat transfer theories were employed and the three-dimensional finite element model of the underpass structure was developed and used for the structural analyses. If the volume of the concrete member that is placed at one time is significantly large, the member is assumed to be the mass concrete and is easy to induce cracks. In order to minimize the cracks during the construction, two different methods can be utilized: one is to arrange the construction steps optimally and the other is to change the materials to reduce the probability of the crack occurrence. In this study, the analyses were performed by considering the changes in material properties with time, the characteristics of the hydration heat generation for cements and admixtures, the volume of the concrete placement at one time, and the environmental conditions.

  • PDF

Case study on Construction and Improvement of Rahmen Structures in Deep Soft Clay Deposit (대심도 연약지반에 설치된 라멘 구조물의 시공 및 보강사례)

  • Lee, Sa-Ik;Choi, Young-Chul;Yoo, Sang-Ho;Kim, Tae-Hyung;Kim, Sung-Ryul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.85-92
    • /
    • 2014
  • Structures that have constructed in soft clay might suffer from many issues related to consolidation settlement or lateral movement of soft-clay during long-term period. Therefore, it is important to establish proper design and construction processes related to site investigation, soil improvement, construction management, and so on. This case study focused on the construction of the rahmen structure supported by pile foundations. Especially, the structure in this case had been constructed without improving underlying soft clay and before constructing backfill embankment due to the limited construction time and the traffic connection of the old road crossing new highway. Therefore, in order to satisfy the structural stability, the construction processes and countermeasure methods were carefully planned based on the results of preliminary numerical analyses and monitoring of ground behaviors. Through the trial and error precess during the construction, the structures had been successfully constructed.

A Study on Improvement of Asphalt Concrete Pavement in Apartment Complex (단지 내 아스팔트 콘크리트 포장 설계 개선 연구)

  • Jung, Jong-Suk;Sim, Young-Jong;An, Je-Sin;Park, Yong-Boo
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.121-129
    • /
    • 2010
  • The purpose of this study is to present the resonable guideline of asphalt concrete pavements in apartment complex. To achieve this purpose was performed review of domestic and foreign guidelines, investigation of main distresses of asphalt concrete pavement, and structural analysis for the investigated cross-sections of the pavements in apartment complex. According to results of structural analysis, this study presented the standard cross-section of the pavement with subbase of 20cm, asphalt base of 5cm, and surface of 5cm in apartment complex. In urban areas, traffic is generally opened after asphalt base course is placed because of civil complaint by dust. Surface course is placed after all of work are completed. Considering these conditions, this study also presented the standard cross-section of the pavement with subbase of 20cm, asphalt base of 7cm, and surface of 5cm for urban areas that expect civil complaints by dust.

Driving Behavior Characteristics under Red Right Camera Enforcement at Signalized Intersections (신호교차로에서 무인교통단속 규제에 따른 주행 특성)

  • Han, Myungjoo;Lee, Soongbong;Kim, Hyeweon;Lee, YoungIhn;Kim, Sangok
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.63-73
    • /
    • 2016
  • PURPOSES : The objective of this study was to analyze variations in the vehicle driving behavior characteristics on signalized intersections according to the use of traffic enforcement camera (red light camera). METHODS : In order to analyze the driving behavior characteristics on signalized intersections when red light camera are installed, the target sites for investigation were selected depending on whether the red light camera is installed and accident rates increased after the installation. In particular, to analyze the characteristics of dilemma zones in signalized intersections, approach speed and deceleration speed of 3 type vehicles (passing vehicles during a yellow light, stopping at a yellow light, passing vehicles during a green light) were examined. Based on these data, the starting point, ending point, and distance of the dilemma zones were calculated. Also, the locations of increased traffic accidents and decreased accidents after the installation of the equipment were distinguished when analyzing the traffic accident characteristics. RESULTS : Analysis results revealed that there was a tendency for the dilemma zone distance to decrease after the installation of equipment(red light camera) in most sites. This tendency was found to be due to the decrease in the approaching speed of vehicles at intersections after the installation of equipment, resulting in the starting and ending points of dilemma zone to become closer to the stop line. Moreover, analysis showed that the number of traffic accidents decreased for most intersections after the installation of equipment and safety of the intersections increased somewhat. CONCLUSIONS : In general, installation of equipment(red light camera) caused the intersections approaching speed and dilemma zone distance to decrease. Decision-making is difficult for drivers in the dilemma zone, so the decrease in the dilemma zone distance implies an improvement in traffic safety. Furthermore, the number of accidents within intersections significantly decreased after the equipment was installed, leading to the conclusion that installation of the equipment affected the decrease in traffic accidents.