• Title/Summary/Keyword: highway agency

Search Result 55, Processing Time 0.023 seconds

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Development of Level of Service System for Road Infrastructure Asset Management (도로시설물 자산관리를 위한 서비스수준체계 개발)

  • Han, Dae Seok;Yoo, In Kyoon;Lee, Su Hyung
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.75-86
    • /
    • 2014
  • PURPOSES: The aim of this paper is developing user-oriented flexible Level Of Service (LOS) system for integrated asset management of various road facilities. It is essential to overcome limitations of general management systems which only focus on a type of assets (e.g. pavement, bridge etc.), and to serve a customizable LOS platform for smooth implementation and future improvement of the LOS considering various managerial environments of road agencies. METHODS: This study suggested a total framework of the LOS system as a process for self-development, operation and improvement of LOS system to conduct the PDCA (Plan-Do-Check-Act) in management process. In the process, we adopted user-customizable elements regarding asset definition, service index and evaluation method to match with the managerial environment of road agencies. In addition, we conducted an empirical study on the entire process of the suggested LOS system with a real road agency (Korea Express Highway) to prove applicability of the LOS system. RESULTS: From the empirical study, we confirmed that the suggested LOS system framework were suitable for development of customized LOS system. In addition, evaluation of asset conditions by LOS ratings, and quantification of vision achievement of the Korea Express Highway were successfully made. It would be the first trial in integrated management approach with LOS systems for numerous road facilities. CONCLUSIONS : It was recognized that easy application and sustainable improvement of the LOS was the most critical point in asset management. The suggested LOS system would be a powerful weapon as a managerial tool in preparing tight budget, aging infrastructures, and increased demands for more accountability both in Korea and internationally. Implementation of the LOS system needs to be expanded to the other infrastructure members to serve satisfactory level of service to taxpayers.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

The Analysis of Channel Characteristics on Downtown of Daejeon for K Band Satellite Communication (대전 도심지의 K 대역 위성통신 채널특성 분석)

  • Kwon, Kun-Sup;Heo, Jong-Wan;Hwang, Ki-Min;Lim, Chul-Min;Ryu, Heung-Gyoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.5
    • /
    • pp.620-628
    • /
    • 2014
  • This paper describes the analysis results of channel characteristics in the operating area of satellite OTM (On-The-Move) terminal. The communication channel between the Koreasat-5 and OTM terminal on a test car was measured and recorded in downtown of Daejeon, using the received beacon signal of around 20 GHz. And the measurement data were statistically analyzed and then compared with highway and national road environments. The statistical evaluation of satellite channel was conducted by using probability density function and Markov model and then presented average connection duration(ACD), average fade duration(AFD), and level crossing rate(LCR) of downtown environment.

Asset Evaluation Method for Road Pavement Considering Life Cycle Cost (생애주기비용을 고려한 도로포장의 자산가치 평가에 대한 연구)

  • Do, Myungsik;Kim, Jeunghwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.63-72
    • /
    • 2009
  • This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.

Impact Range Analysis of Small LPG Storage Tank Explosions at Highway Rest Areas (고속도로 휴게소 소형 LPG 저장탱크 폭발에 따른 영향범위 분석)

  • Seung duk Jeon;Soon Beom Lee;Jai Young Lee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.319-327
    • /
    • 2023
  • This study analyzes the risks of explosions of small LPG storage tanks installed at highway rest areas. For this purpose, the ranges of the effect of thermal radiation and overpressure caused by the BLEVE(Boiling Liquid Expansion Vapor Explosion)and VCE(Vapor Cloud Explosion) of a 2900-kg small LPG storage tank installed at highway rest areas were quantitatively evaluated by applying the Areal Location of Hazardous Atmospheres program. The ranges of influence of the derived explosion overpressure and thermal radiation were found to have a maximum radii of 336 m and 423 m, respectively. The study determined that those within 269 m could be severely injured by an explosion overpressure of 3.5 psi, and fatalities from thermal radiation of 10 kw/m2 could occur within 192 m of the exploded storage tank. The safety management plan for the LPG storage tank was discussed while considering the auxiliary facilities of highway rest areas and the extent of the damage impact. These research results will help improve safety accident prevention regulations considering the environment and facilities of the rest areas as well as the safety management of small LPG storage tanks installed at highway rest areas.

Evaluation of Reasonableness of the Recommended Spraying Amount Equation for De-icing Chemicals (도로 제설제 권장 살포량 산정식의 적정성 평가)

  • Kim, Jin Guk;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.19 no.4
    • /
    • pp.9-18
    • /
    • 2017
  • PURPOSES : This study evaluates the reasonableness of the recommended amount of deicing chemicals based on historical data for snow removal. The result can be used to aid decision-making for the reservation of cost-effective de-icing chemicals. METHODS : First, the recommended amount of de-icing chemical to use and historical usage data were evaluated to identify specific usage characteristics for each region. Road maintenance length and snow-removal working days were analyzed over the past five winter seasons. Next, differences in the recommended amount of chemical to use and actual use were compared using the Kolmogorov-Smirnov test. Last, the two types of data were analyzed using a chi-square test to verify if the two distributions of variation pattern are statistically significant. We found that there are significant differences between the data from each region during the past five winter seasons. RESULTS : The results showed that the equation for calculating the amount of de-icing chemical to use appears to be revised. CONCLUSIONS : The results imply that the equation for calculating the amount of de-icing chemical to apply as a national standard is very important when the public agency makes decisions related to snow-removal.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

A Study on Economic Feasibility of Highway Maintenance Considering Carbon Amount by Using KPRP (Korea Pavement Research Program) (탄소량을 고려한 도로 유지보수 경제성에 관한 연구: KPRP (Korea Pavement Research Program) 활용)

  • Nguyen, Dinh Thanh;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.879-890
    • /
    • 2017
  • The US Pavement Design method (AASHTO) and HDM-4, a road pavement maintenance decision system, are not suitable for domestic pavement design, construction and maintenance. KPRP(Korea Pavement Research Program) has been developed to reflect Korea's environmental conditions and vehicle characteristics, thereby, extending pavement life. The main objective of this study is to select the best alternative through Life Cycle Cost $CO_2$ (LCCC) calculations among three representative maintenance strategies using KPRP design software since the environment cost resulting from the extended pavement life will also differ. The analysis of this study illustrates that cumulative carbon emissions for 40 years in alternative 2 (Cutting and Overlaying at Year 30) is the lowest option among them, and the basic cost of $CO_2$ emission by various road maintenance and repair work can be used for suggesting an optimal maintenance strategy for highway agency.

Evaluation of a Traffic Lane Closure and Pavement Repair for a Certain Period (Focusing on the Gimcheon~Sunsan Project) (1차로 전면차단 후 도로포장 보수방법의 효과분석 (김천~선산 사례중심))

  • Ryu, Sung Woo;Park, Kwon-Je;Han, SeungHwan;Choi, InGu;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.11-19
    • /
    • 2016
  • PURPOSES : This study supports the evidence that it is possible to rehabilitate a damaged pavement with a lane closure specifically based on the Gimcheon~Sunsan project. METHODS : The prediction results from the simulation programs were compared with field monitoring, which focused on traffic management planning, congestion (length, time, and passing speed), bypass, and user cost, among others. RESULTS : The research results showed that lane closure application and pavement repair of the aged pavement in Korea were possible, even though the prediction results were minimally different from the field monitoring. The road agency contributes to service life extension of the rehabilitated pavement using this method. CONCLUSIONS : A marginal effect caused by the lane closure was observed on travelling users or vehicles, and the user cost of pavement repair decreased. Therefore, introducing the repair method or rehabilitation in Korea is possible. Information dissemination through various media was properly done to execute the project well. Moreover, the construction area traffic utilized nearby alternative roads. Therefore, improving the repaired pavemen's service life while ensuring that the pavement management agency can provide a road with comfortable user riding quality was possible.