• Title/Summary/Keyword: high speed train maintenance

Search Result 148, Processing Time 0.027 seconds

Characteristics of Track and Train Behaviors on High-Speed Railway Bridge/Earthwork Transiton Zone (고속철도 교량/토공 접속부에서의 궤도 및 차량 거동 특성)

  • Lee, Il-Wha;Kang, Yun-Suk;Kim, Eun;Son, Ki-Jun;Park, Chan-Kyoung
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.129-134
    • /
    • 2003
  • It is very important to pay careful attention to construction of bridge/earthwork transition zone for high-speed railway. The transition zone of the railway is the section which roadbed stiffness is suddenly varied. Differences in stiffness have dynamic effects and these increase the forces in the track and the extent of deformation. An abrupt change of stiffness across two adjacent track portions cause irregular settlement of roadbed, track irregularity, lack of girder bending moment and reduction of lateral resistance. Especially on high-speed railway, track irregularity of transition zone cause sincere effect to track stability and train safety. And so continuous maintenance is needed. To verify this effect and to improve transiton zone capacity, In situ test, track irregularity and train acceleration test were performed on high-speed railway bridge/earthwork Transiton Zone.

  • PDF

Investigation of the IPMSM Parameter Variation Effect to the System Operation Characteristics of the Multi Inverter Driven High Speed Train System (다중 인버터 구동 고속전철 시스템의 IPMSM 파라미터 변동에 따른 운전 특성 고찰)

  • Park, Dong-Kyu;Jin, Kang-Hwan;Chang, Chin-Young;Kim, Sung-Je;Kim, Yoon-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.193-199
    • /
    • 2011
  • The next generation domestic high speed railway system is a power distributed type and uses vector control method for motor speed control. Nowadays, inverter driven induction motor system is widely used. However, recently PMSM drives are deeply considered as a alternative candidate instead of an induction motor driven system due to their advantages in efficiency, noise reduction and maintenance. The next-generation high-speed train is composed of 2 converter units, 4 inverter units, and 4 Traction Motor units. Each motor is connected to the inverter directly. In this paper, the effects of IPMSM parameter variation to the system operation characteristics of the multi inverter driven high speed train system are investigated. The parallel connected inverter input-output characteristics are analyzed to the parameter mismatches of the IPMSM in 1C1M control using Matlab/Simulink, then the reliability of the simulation results are verified through experimental results.

Dynamic Characteristics Analysis on the Power Factor Correction (PFC) System for Propulsion System of KTX High Speed Train (KTX 고속전철 추진제어시스템의 역률제어장치(PFC) 동작특성 분석)

  • Lee, Eul-Jae;Lee, Eun-Gyu;Yoon, Cha-Jung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.82-92
    • /
    • 2011
  • This paper presents a PFC(Power Factor Correction) system to control the power factor of input current of the converter system which is working in the propulsion system of KTX high speed train. In the KTX train system, initially introduced from ALSTOM, the thyristor converter with phase controlling technique is adopted in the current fed type powering system. The input current induces harmonic losses highly because the waveform becomes rectangular shapes according to the filter inductor current increased as the train speed increasing gradually. Especially the interference with the signalling systems is severe concerned due to high current harmonics on the catenary line. To protect this problem, a frequency trap filter(notch filter) is operating with the input converter system. In this paper, an analysis work and PC simulation have been done on the PFC system to upgrade its performance and maintenance efficiency.

  • PDF

Research of the Turnout Maintenance Training System using Mixed Reality (혼합현실을 이용한 분기기 유지보수 교육시스템 연구)

  • Song, Yong-Soo;Kim, Yong-Kyu;Shin, Duck-Ho;Chang, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1511-1516
    • /
    • 2011
  • The maintenance of the turnout is composed of signal field and track field on business, the electrical and mechanical field on system. adjustment and maintenance carry forward through coordination with these fields. In the case of turnout equipment used in a first phase of Seoul-Busan high-speed train, it is treated by classifying as mechanical adjustments and electrical adjustments. Mechanical adjustment is conducted with focus on fine adjustment to meet maintenance standards limits(1mm or less) about interval of basic rail and tongue rail about each part of track transition equipment. This refers to mechanical adjustments performed mainly with physical changes and movement characteristics between basic rail and tongue rail by considering the overall environment surrounding track side of section installed track transition equipment. However, these series of maintenance are conducted in state that high-speed train is not in the process from 1 am to 4 am at night, but common workers for maintenance are not familiar with the operation and checking about various situation, and the workers are even insufficient. Maintenance training using mixed reality is conducted in the place of business, we tried to overcome several problems of safety and time reduction through this training.

  • PDF

Dynamic Behavior Analysis of PSC Train Bridge Friction Bearings for Considering Next-generation High-speed Train (차세대 고속철의 증속을 고려한 PSC 철도교 마찰 교량받침의 동적 거동 해석)

  • Soon-Taek Oh;Seong-Tae Yi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.39-46
    • /
    • 2023
  • In this study, the dynamic behavior of friction bearings of PSC (Pre-Stressed Concrete) box train continuous bridge was numerically analyzed at 10 km/h intervals up to 600 km/h according to the increasing speed of the next-generation high-speed train. A frame model was generated targeting the 40-meter single-span and two-span continuous PSC box bridges in the Gyeongbu High-Speed Railway section. The interaction forces including the inertial mass vehicle model with 38 degrees of freedom and the irregularities of the bridge and track were considered. It was calculated the longitudinal displacement, cumulative sliding distance and displacement speed of the bridge bearings at each running speed so that compared with the dynamic behavior trend analysis of the bridge. In addition, long-term friction test standards were applied to evaluate the durability of friction plates.

A Study on High-Speed Railway Track Maintenance Scheduling Using ILOG (ILOG를 이용한 고속선 궤도 유지보수 일정계획에 관한 연구)

  • Nam, Duk-Hee;Kim, Ki-Dong;Kim, Sung-Soo;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1177-1190
    • /
    • 2010
  • The high-speed railway track occurs train operating result track irregularity, subsidence of the track, ballast abrasion. This is the unusual condition. High-speed railway track maintenance task is the behavior which repairs unusual section by using the human resource or machine resource. The resource used to maintenance task is restrictive. A resource can be efficiently used if the high-speed railway track maintenance scheduling is used. So the more task can be performed in the fit time. In conclusion, this manages the unusual condition of a track efficiently. So additional expenses is minimized cause by deteriorating unusual condition. And it offers comfortable ride to passenger. However, maintenance scheduling has to reflect well practical situation and environment. That's maintenance scheduling is used. We gather the opinions of the hands-on workers. So in this paper define field situation and condition. And suggest mathematical model about this. And we developed the track maintenance scheduling software engine using ILOG.

  • PDF

A Dynamic Analysis of Rotations at the center of Vehicle Running High Speed KTX Train on the PSC Box Bridges (PSC 교량 위를 고속주행 중인 KTX 전동차의 중심회전각 동적해석)

  • Oh, Soon-Tack;Lee, Dong-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.1
    • /
    • pp.59-67
    • /
    • 2014
  • A dynamic analysis is carried out to provide an evaluation method of running safety for a PSC box bridge located on the Gyung-Bu high speed railway. The numerical models of bridge and train vehicle are developed in detail with corresponding interaction system. Three dimensional skeleton element model of PSC box bridge and 38-degree-of-freedom of vehicle are adopted from the existing properties of KTX bridge and train vehicle. Analysed three direction rotations of vehicle on the bridge and ground tracks are compared for running speeds up to 500 km/h with 10 km/h constant increments. The comparison of the rotations will be an improved evaluation method of Running Safety in stead of the existing standard method.

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

A Study on Conceptual Design and Dynamic Model of Roller Rig for Maintenances with Maximum Speed of 350km/h (350km/h 급의 유지보수용 주행시험기의 개념설계 및 동적모델 제시 연구)

  • Goo, Jun-Sung;Ryu, Bong-Jo;Lee, Dae-Bong;Lee, Eun-Gyu;Shin, Kwang-Bok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.296-300
    • /
    • 2007
  • Roller rigs have been built widely to study and evaluate the dynamic behaviors of railway vehicles, and they have particularly been applied to the development and routine maintenance of high-speed trains. However, there is no roller rig for routine maintenances of high speed train in Korea, although high speed train is running on the lines. Therefore, it is very important issue to check and evaluate the dynamic responses of high speed train after several years of operation. This paper presents a study on the conceptual design and dynamic model to develop the roller rig for the routine maintenances of high speed trains. The roller rig has two independent electronic motor and maximum speed of 350km/h, which can simulate running on straight and curved track. CATIA V5 was used to design the 3D geometrical models and ADAMS was used to verify and analyze the dynamic behaviors of roller rig.

  • PDF

Vibration sources and its countermeasures of high speed electric trains for subway (지하철용 고속전동차의 진동원 및 개선대책)

  • Park, Ki-Soo;Choi, Yeon-Sun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.244-250
    • /
    • 2007
  • The electric train in the first line subway runs faster in the block from Suwon to Cheonan than the general block. The faster run results in the deterioration of ride quality due to the increase of noise and vibration. To reduce the noise and vibration of the electric train, a running test of the electric train was performed in the block from Suwon to Cheonan. The experimental results show that the sources of the noise and vibration basically comes from the irregularity of the railroad track and the connection part between car body and bogie. The possible countermeasure of the high speed electric train can be the reinforcement of the center pivot to have more flexibility and the frequent maintenance of electric train.

  • PDF