• 제목/요약/키워드: high speed train maintenance

검색결과 148건 처리시간 0.027초

CAMS에 의한 고속선 열차제어시스템의 장애 분석 (Failure Analysis of Train Control System for Hign Speed Line by CAMS)

  • 김용규;백종현;김종기;신덕호
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2006년도 하계종합학술대회
    • /
    • pp.973-974
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in maintenance, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS (Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high-speed railway train control systems, by comparison between the analysis result of fundamental causes, from high-speed railway train control system failures occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF

CAMS에 의한 고속선 열차제어시스템 장애 분석에 관한 연구 (A Study on the Fault analysis of train control system by CAMS)

  • 김용규;백종현;류상환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1436-1441
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in High Speed Line Train Control System, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS(Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high speed railway train control systems, by comparison between the analysis result of fundamental causes, from high speed railway train control system failure occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF

틸팅열차 상용화대비 기존선 인프라시스템의 효율적 유지보수체계 검토 (Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service)

  • 유근수;이창훈;안광열;김종태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.79-87
    • /
    • 2008
  • The major objective of this study is to investigate the effective maintenance system for the infrastructure on the conventional lines in which the tilting train runs. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks was developed. Besides, the efficiency prediction and the linear fitness of the existing conventional lines for a tiling train service were examined on the preceding study which was the development of track system innovation technology for speed-up of them. So, in this paper we propose the more effective maintenance method than the existing it in order to securing the high reliability and safety classified by the infrastructure, in analyzing foreign materials and the maintenance as well as the inspection cycle concerning domestic infrastructures of the track and the catenary etc. on the railway. And we look forward to playing a decisive role as reference material for the effective improvement of the existing maintenance about the infra on the conventional lines for the commercial service of the tilting train.

  • PDF

TCN(Train Communication Network) 통신 시험용 WTB(Wire Train Bus) Analyzer 개발 (The development of WTB(Wire Train Bus) Analyzer for the TCN(Train Communication Network) testing)

  • 전성준;백진성;손강호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1936-1945
    • /
    • 2008
  • In Korea, TCN has applied to the Korean High-speed Train (HSR350X) through G7 High-speed Train development project. TCN is the most suitable international standard communication network for distributed control systems that is adopted for high-speed of vehicle, safety and flexibility. TCN is the network exclusively for the high-speed train and electrical trains. This TCN satisfies the network standards. The network standards are real time communication, fault tolerance design, integrated data system, resistance of environment, automated recognition for modification of vehicle formation and maintenance. The purpose of this research is applying the development of WTB analyzer which is part of communication network system TCN, to check the communication of high-speed trains and electrical trains.

  • PDF

경부고속철도 토공부의 자갈도상에 대한 진동특성 연구 (A Study on Dynamic characteristics in the Ballast gravel in Gyeongbu High Speed Railway)

  • 박준오;강태구;홍원표
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.84-90
    • /
    • 2009
  • The gravel ballast in the ballasted track has the function to not only transfer/scatter the train loads to subgrade through rail and sleeper but also elastically support the train loads. Because track irregularities results inevitably from the repetitive train loads, the track maintenance should be undertaken for correcting them. By analyzing the track maintenance history in the Gyeongbu high speed railway, this study tries to choose the local two spots in the railway in which the repair frequencies are maximum and relative small; to analyze their dynamic characteristics as well as grade; and to compare them with maintenance history. As the dynamic characteristics of track, the vertical displacement and vibrating acceleration of sleeper as well as acceleration of ballast are measured/analyzed. Furthermore, by collecting soil and gravel on the reinforced roadbed and undertaking ballast screening test, the size distributions are compared with grade distribution standards of high speed railway.

  • PDF

고속전철 와전류 제동장치 설계와 특성해석 및 실험 (Design and Analysis of Eddy-Current Braker for High-Speed Train)

  • 정수진;강도현;김동희
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제51권12호
    • /
    • pp.659-663
    • /
    • 2002
  • The brake systems of high-speed train are to be equipped with three different brake systems, such as regenerative brake with regenerative feedback in driving car, a pneumatic disc brake, and non-contact linear eddy-current brake(ECB). The regenerative brake and the pneumatic disc brake are acting on the wheels. Their achievable braking force depends on the adhesive coefficient, which is influenced by the weather condition and speed, between the wheel and The linear eddy current brake gets an economical solution in the high-speed train because of the independence of the adhesive coefficient, no maintenance needed. and the good control characteristics. The braking force and the normal force of ECB for korean high-speed train are analysed by the 2D FEM(Finite Element Method). Finally the normal force is compared with the experiential values to verify the analysis.

차세대 고속열차 통신네트워크 기술개발 동향 (Technology development trend of the train network for high speed train)

  • 최권희;심재철;백정현;이병원;강기석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1005-1009
    • /
    • 2005
  • The On Board Computer System (ORCS) used for rolling stocks is one of the core equipments in trains, which deals with collecting real-time data of a train to display and record the train's statuses, control the train, and support the driver and maintenance function. Resides, due to high reliability and high speed communication required lately for various electronics including signal1ing devices, train protection system, and multimedia, the necessity of a more robust train communication network is on the lise. This study aims at understanding the technological trend of the current train communication network in order to rapidly cope with the tendency above and providing fundamental data for designing a more advanced communication network for high-speed trains hereafter.

  • PDF

차상제어시스템 엔지니어링 설계 (An Engineering Design of On-Board Computer System)

  • 이주훈;이재덕;조창희;박도영;김국헌;김용주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1433-1435
    • /
    • 2000
  • Currently KERI is participating a project whose goal is to develop the Korean High-Speed Train(KHST) with maximum speed of 350kph. KERI's responsibility is the electrical system engineering that includes engineering design of an on-board computer system for diagnosis and control of train set and electrical/mechanical devices. A system engineering approach of the design is performed in order to guarantee the passenger safety and economically viable train for on-board control system construction, operation and maintenance. This paper presents the draft engineering des on-board computer system that ensures the s and reliability of KHST. The draft is focuse network interfaced distributed processing system.

  • PDF

The Dynamic Interactive Analysis of track and train system with Roadbed Displacement in Subgrade Concrete Slabtrack

  • 홍철기;양신추;김연태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.379-386
    • /
    • 2007
  • Recently the concrete slab tracks are being constructed on roadbed in the Kyong-bu 2nd stage high speed railways. In responding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides the design standards and the maintenance system. The proposed standards and the maintenance system are based on the track theory and the track-train interaction program developed, where the roadbed displacement and train speed are utilized as mediating variables. In the analysis, the dynamic response of track-train interaction apply to various speeds and displacements. the roadbed displacement is shown in a sine curve, the scope of the displacement occurrence, presented in its wavelenths, include 6meters, 10meters, 15meters, 20meters, 30meters. the train speeds involved are 50,100, 150,200,250,300,350,400 kilometers per hour.

  • PDF

토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구 (A Study on the Criteria of Settlement in Concrete Slabtrack)

  • 홍철기;양신추;김연태
    • 한국철도학회논문집
    • /
    • 제10권3호
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.