Purpose - Drone delivery is expected to revolutionize the supply chain industry. This paper aims to introduce a collaborative parcel delivery problem by truck and drone (hereinafter called "TDRP") and propose a novel heuristic method to solve the problem. Research design, data, and methodology - To show the effectiveness of collaborative delivery by truck and drone, we generate a toy problem composed of 9 customers and the speed of drone is assumed to be two times faster than truck. We compared the delivery completion times by 'truck only' case and 'truck and drone' case by solving the optimization problem respectively. Results - We provide literature reviews for truck and drone routing problem for collaborative delivery and propose a novel and original heuristic method to solve the problem with numerical example. By numerical example, collaborative delivery is expected to reduce delivery completion time by 12~33% than 'truck only' case. Conclusions - In this paper, we introduce the TDRP in order for collaborative delivery to be effective and propose a novel and original heuristic method to solve the problem. The results of research will be help to develop effective heuristic solution and optimize the parcel delivery by using drone.
The present study examined the usability of the web site design, focusing on the cognitive characteristics of the WWW. Specifically, we conducted two major non-experimental usability testing methods on the domestic web sites with various purposes. In research I. we used an on-line questionnaire method on 12 domestic web sites. As a result. several critical usability features and factors were identified. In research 2. we carried out a heuristic evaluation method to identify more specific usability problems The result of research 2 suggests that the heuristic evaluation method reveals more specific problems of the web site design than the questionnaire method.
To build an information oriented armed forces, the Korean military telecommunication networks adopt TCP/IP standard communication infrastructures based on ATM packet switched networks. Utilizing this network infrastructure, the Korean armed forces also applies to the areas of battleship management for efficient operation command controls and resource management for efficient resource allocations. In this military communication networks, it is essential to determine the least cost network topology under equal performance and reliability constraints. Basically, this type of communication network design problem is known in the literature as an NP Hard problem. As the number of network node increases, it is very hard to obtain an optimal solution in polynomial time. Therefore, it is reasonable to use a heuristic algorithm which provides a good solution with minimal computational efforts. In this study, we developed a simulated annealing based heuristic algorithm which can be utilized for the design of military communication networks. The developed algorithm provides a good packet switched network topology which satisfies a given set of performance and reliability constraints with reasonable computation times.
Traditionally, the scarce and expensive resources in communication networks has been the bandwidth of transmission facilities; accordingly, the techniques used for networking and switching have been chosen so as to optimize the efficient use of that resource. One of them is the packet switching for data communications, which is much different from the circuit switching. It allows multiple users to share the data network facilities and bandwidth, rather than providing specific amounts of dedicated bandwidth to each users. One main challenge therefore has been to design and build cost-effective packet switching networks. In this paper, we develop a mathematical programming medel and heuristic algorithm for designing the packet switching networks with hop-count constraints. To develop an efficient heuristic, we apply the Lagrangian relaxation method. Some valid inequalities, which have been known as the tight constraints, are considered to improve the bound for Lagrangian sub-problem. The computational experiments show that the performance of the proposed heuristic is very satisfactory in both the speed and the quality of design solutions generated.
Strategic decisions related to the design of a physical distribution system can be classified into three basic components : facility location, transportation, inventory decisions. In this research the interdependence of those decisions are expressed in a mathematical model such that the total relevant cost of the system is minimized. We suggested a heuristic technique for solving the model. In broad terms, our solution technique combines a heuristic method for determining which candidate DCs to open and an exact method for minimizing costs given a set of open DCs. And we also developed a decision supporting package for the design of a physical distribution system.
Journal of the Korean Society of Marine Environment & Safety
/
v.19
no.3
/
pp.277-284
/
2013
To ensure that the production system of a factory is efficient, the factory layout design should consider the location and material flow plans of facilities, workshops, and storage areas. Highly productive factories need to have an optimized layout planning process, and a customized design methodology of the production system is a necessity for feasible layout planning. This paper presents a method for designing a layout module's size and shape and provides a heuristic location-allocation algorithm for the modules. The method is implemented and validated using a rich internet application-based platform. The layout design method is based on the leisure ship production process; this method can be used for designing the layout of a new factory or remodeling an existing factory and its production system. In contrast to existing layout methods, the inputs required for the proposed method, such as target products, production processes, and human-resource plans, are simple. This layout design method provides a useful solution for the initial stage of factory design.
In this paper, a new meta-heuristic algorithm named Ranked Particles Optimization (RPO), is presented. This algorithm is not inspired from natural or physical phenomena. However, it is based on numerous researches in the field of meta-heuristic optimization algorithms. In this algorithm, like other meta-heuristic algorithms, optimization process starts with by producing a population of random solutions, Particles, located in the feasible search space. In the next step, cost functions corresponding to all random particles are evaluated and some of those having minimum cost functions are stored. These particles are ranked and their weighted average is calculated and named Ranked Center. New solutions are produced by moving each particle along its previous motion, the ranked center, and the best particle found thus far. The robustness of this algorithm is verified by solving some mathematical and structural optimization problems. Simplicity of implementation and reaching to desired solution are two main characteristics of this algorithm.
Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.
Journal of Korean Society of Industrial and Systems Engineering
/
v.28
no.4
/
pp.94-101
/
2005
This paper presents a data-mining aided heuristic algorithm development. The developed algorithm includes three steps. The steps are a uniform selection, development of feature functions and clustering, and a decision tree making. The developed algorithm is employed in designing an optimal multi-station fixture layout. The objective is to minimize the sensitivity function subject to geometric constraints. Its benefit is presented by a comparison with currently available optimization methods.
As to more efficiently manage the inventory in the retail supply chain and to meet the customer demand in a timely manner, vendor-managed inventory (VMI) has been widely accepted, which manages inventory in the retail supply chain via sharing information and collaborating with the retailers. Applying VMI generates vendor-managed inventory/distribution problem (VMIDP), which involves inventory management for both the vendor and the retailers, and the design of vehicle routes for delivery, to minimize the total operating cost in the supply chain. In this paper, we suggest a mixed integer programming (MIP) model to obtain the optimal solution for VMIDP in a two-echelon retail supply chain, and develop an efficient heuristic based on the operating principles of the MIP model. To evaluate the performance of the heuristic, its solution was compared with the one of the MIP model on a total of twenty seven test problems. As a result, the heuristic found optimal solutions on seven problems in a significantly reduced time, and generated a 4.3% error rate of total cost in average for all problems. The heuristic is applied to the case problem of the local famous franchise company together with GIS, showing that it is capable of providing a solution efficiently in a relatively short time even in the real world situation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.