• Title/Summary/Keyword: gravel road

Search Result 37, Processing Time 0.03 seconds

Emergency and Permanent Repair Technology for Damaged Road Bases and Slopes using Gravel-Netting Concrete (도로 및 비탈면 유실 항구적 긴급복구를 위한 골재망 콘크리트 활용기술 개발)

  • Kim, Yongjae;Jung, Haekook;Kim, Seungwon;Park, Cheolwoo
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.9-17
    • /
    • 2018
  • PURPOSES : The frequency and severity of natural disasters such as torrential rain or typhoons have become increasingly significant worldwide. Events such as summer typhoons and localized torrential downpour can cause severe damages to a residential area and road networks, resulting in serious harm to the daily lives of people, especially in rural areas by isolating residents from road networks. An immediate and emergency repair technology for the collapsed road networks is urgently needed. This study introduces a new technology to repair road bases or slopes. METHODS : The development of new technology for emergency and permanent repair consists of first, packing of cement paste-coated gravel, second, combining appropriate equipment, and third, conducting a field applicability test. In this research, the compressive strength of cement pastecoated gravel, gravel-netting concrete properties, and packing efficiency were determined, and a full scale field mock-up test was carried out. RESULTS : The compressive strength of the cement paste-coated gravel concrete satisfied the required limit for road base of 5 MPa after 7 days. With appropriate netting materials and packing size, gravel-netting concrete was successful up to a slope of 1:1.5. The full scale field mock-up test showed efficiency in the field and penetration resistance performance. CONCLUSIONS : The new technology of emergency and permanent repair for damaged road bases and slopes, introduced in this study, showed satisfactory performance. The technology is expected to be applied in the field when construction procedures and quality specifications are made.

Development of Road Profile Realization Software (로드 프로파일 재현 소프트웨어 개발)

  • 류신호;정상화;김우영;나윤철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.265-268
    • /
    • 1997
  • In the recent day, fatigue life prediction techniques play a major role in the design of components in the ground vehicle industry. Full scale durability testing in the laboratory is an essential of any fatigue life evaluation of components or structures of the automotwe vehicle. Component testing is part~cularly important in today's highly competitive industries where the design to reduce weight and production costs must be balanced with the necessity to avoid expensive service failure. Generally, multi-axial road simulator is used to carry out the fatigue test and the vibration test. In this paper, the algorithm and software to realize the real road profile are developed. The validity of the software are verified by applying the belgian road, the city road, the highway, and the gravel road. The results of the above experiment show that the real road profiles are realized well after loth iteration.

  • PDF

Realization Software Development of Road Profile for Multi-axial Road Simulator (다축 로드 시뮬레이터의 노면 프로파일 재현 소프트웨어 개발)

  • 정상화;류신호;김우영;양성모;김택현
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.5
    • /
    • pp.190-198
    • /
    • 2002
  • Full scale durability test in the laboratory is an essential of any fatigue life evaluation of components or structures of the automotive vehicle. Component testing is particularly important in today's highly competitive industries where the design to reduce weight and production costs must be balanced with the necessity to avoid expensive service failure. Generally, hydraulic road simulator is used to carry out the fatigue test and the vibration test. In this paper, the algorithm and software to realize the real road profile are developed. The operation software for simultaneously controlled multi-axial road simulator is developed and the input and output data are displayed window based PC controller in the real time. Futhermore, the software to generate the real road profile are developed. The validity of the software are verified by applying the belgian road, the city road, the highway, and the gravel road. The results of the above experiment show that the real road profiles are realized well after 10th iteration.

Numerical Analysis of the Initiation and Development of Corrugation on a Gravel Road (수치해석적 기법을 활용한 골재 도로의 콜루게이션 발생 및 진전 분석)

  • Yun, Taeyoung;Chung, Taeil;Shin, Hyu-Soung
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.9-18
    • /
    • 2018
  • PURPOSES : In this research, the initiation and development of corrugation on a gravel road with certain wheel and boundary conditions were evaluated using a coupled discrete-element method (DEM) with multibody dynamics (MBD). METHODS : In this study, 665,534 particles with a 4-mm diameter were generated and compacted to build a circular roadbed track, with a depth and width of 42 mm and 50 mm, respectively. A single wheel with a 100-mm diameter, 40-mm width, and 0.157-kg mass was considered for the track. The single wheel was set to run slowly on the track with a speed of 2.5 rad/s so that the corrugation was gradually initiated and developed without losing contact between the wheel and the roadbed. Then, the shape of the track surface was monitored, and the movement of the particles in the roadbed was tracked at certain wheel-pass numbers to evaluate the overall corrugation initiation and development mechanism. RESULTS : Two types of corrugation, long wave-length and short wave-length, were observed in the circular track. It seems that the long wave-length corrugation was developed by the longitudinal movement of surface particles in the entire track, while the short wave-length corrugation was developed by shear deformation in a local section. Properties such as particle coefficients, track bulk density, and wheel mass, have significant effects on the initiation and development of long-wave corrugation. CONCLUSIONS : It was concluded that the coupled numerical method applied in this research could be effectively used to simulate the corrugation of a gravel road and to understand the mechanism that initiates and develops corrugation. To derive a comprehensive conclusion for the corrugation development under various conditions, the driver's acceleration and deceleration with various particle gradations and wheel-configuration models should be considered in the simulation.

The Engineering and Environmental Properties of Reclaimed Concrete Materials as Road Materials (도로건설재료로 순환골재의 공학적·환경적 특성에 관한 기초연구)

  • Lee, Yong-Soo;Kwan, Yong-Wan;Hyun, Jae-Hyuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.3
    • /
    • pp.17-23
    • /
    • 2005
  • In Korea, the production of reclaimed concrete materials has been increased due to the increase in the concrete structures taken down every year. The reclaimed concrete materials have been reused as road materials. However, the studies on their mechanical and environmental properties have been very limited. The recycled rate of the materials is currently low in Korea. This paper presents the investigation of mechanical and environmental properties of the reclaimed concrete materials, as well as the comparisons with those of gravel. For the evaluation of the mechanical and environmental characteristics, following tests were conducted on both reclamed materials and gravel; liquid limit, plasticity index, CBR, sand equivalent test, abrasion test, pH test, and column leaching test. The test results showed that the reclaimed concretes satisfy the requirements for use as roadbase, subbase, and subgrade materials, except base materials. The pH of reclaimed concrete materials was less than 11 and the leaching test results satisfied the regulatory requirement of Waste Management Act in Korea. Based on the investigations, it appears that the reclaimed concrete materials are environmentally safe and applicable for use as road materials.

  • PDF

Leaching of Arsenic in Soils Amended with Crushed Arsenopyrite Rock

  • Lee, Kyosuk;Shim, Hoyoung;Lee, Dongsung;Yang, Jae E.;Chung, Dougyoung
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.47 no.2
    • /
    • pp.113-119
    • /
    • 2014
  • Arsenic and its compounds which is one of the most toxic elements that can be found naturally on earth in small concentrations are used in the production of pesticides, herbicides, and insecticides. Most arsenic that cannot be mobilized easily when it is immobile is also found in conjunction with sulfur in minerals such as arsenopyrite (AsFeS), realgar, orpiment and enargite. In this investigation we observed the leaching of arsenic in soils amended with several levels of gravel size of arsenopyrite collected from a road construction site. Soil and gravel size of arsenopyrite were characterized by chemical and mineralogical analyses. Results of XRF analysis of arsenopyrite indicated that the proportion of arsenate was 0.075% (wt $wt^{-1}$) while the maximum amount of arsenic in soil samples was 251.3 mg $kg^{-1}$. Cumulative amounts of effluent collected from the bottom of the soil column for different mixing rate of the gravel were gradually increased where proportion of the gravel mixed was greater than 70% whereas the effluent was stabilized to the maximum after approximately 45 pore volumes of effluent or greater were collected. The arsenic in the effluent was recovered from the soil columns in which the proportion of arsenopyrite gravel was 60% or greater. The total amount of arsenic recovered as effluent was increased with increasing proportion of gravel in a soil, indicating that the arsenic in the effluent was closely related with gravel fraction of arsenopyrite.

An Experimental Study of Tire-Road Friction Coefficient by Transient Brake Time (실차 실험을 통한 제동순시간에 의한 타이어-노면마찰계수에 관한 연구)

  • Han, Chang-Pyoung;Park, Kyoung-Suk;Choi, Myung-Jin;Lee, Jong-Sang;Shin, Un-Gyu
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.24 no.7 s.196
    • /
    • pp.106-111
    • /
    • 2007
  • In this paper, the transient brake time was studied on the van type vehicle with accelerometer. Experiments were carried out on the asphalt(new and polished), unpacked road(earth and gravel) and on wet or dry road conditions. The transient brake time is not effected bzy the vehicle speed. The transient brake time is about 0.41$\sim$0.43second on the asphalt road surface and the error range is within 0.1$\sim$0.16second. For the asphalt road condition, the transient brake time is not effected by both new asphalt road surface and the polished asphalt road surface. With compared by dry and wet road surface condition, the transient brake time of wet condition is longer than dry road condition and compared with unpacked road condition and packed road condition, unpacked road condition is shorter than packed road condition. It is considered that the transient brake time is effected by the road surface fraction coefficient. In other words, the transients brake time increases as friction coefficient decreases.

Evaluation of Side-ditch Erosion Factors and Judgment of Side-ditch Stability in Forest Road (임도(林道) 옆도랑의 침식요인(浸蝕要因) 평가(評價)와 안정성(安定性) 판별(判別)에 관(關)한 연구(硏究))

  • Lee, Hae-Joo;Ji, Byoung-Yun;Jung, Do-Hyun;Kim, Jong-Yoon;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.3
    • /
    • pp.397-404
    • /
    • 2000
  • This study was carried out to investigate the influence of the road structure and site conditions on side-ditch stability of forest road. For experimental purposes, the forest road in the Kwangrung Experimental Forest, Korea Forestry Research Institute, was chosen as a study site. A total of 556 plots wes set up as every longitudinal gradient changing points by belt-transect method. Data of 10 road structural characteristics and side-ditch stability were collected from each plot and analysed by Quantification II. The main factors in order of partial correlation coefficient were longitudinal gradient, road position, inclination of cut-slope, constituent material of cut-slopes, distance of surface flow, cross-sectional shape of road, pavement material, vegetation of cut-slopes and length of cut-slope. The erosion of side-ditch of forest road occurred in the following cases; more than 8% of the longitudinal gradient, road position of hill under side and foot hill, more than $50^{\circ}$ of inclination of cut-slope, constituent material of cut-slopes of hard soil and gravel soil, more than 80m of distance of surface flow, pavement material with earth or gravel, more than medium covered of vegetation of cut-slopes, and the straight and convex form of road-bed.

  • PDF

Changing of Vegetation Coverage through Elapsed Years on Cutting Slope in Forest Roads (시간경과에 따른 임도 절토비탈면의 식생피복도 변화)

  • Jeon, Kwon-Seok;Ma, Ho-Seop
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.3
    • /
    • pp.14-25
    • /
    • 2004
  • The purpose of this study was investigated to the change of vegetation coverage by elapsed years on the cut slope of forest road in Jinju-si. The results obtained could be summarized as follows; The plant coverage on the cut slope of forest road was decreased hastily in first and second year after seeding. The plant coverage on the cut slope of forest road was increased as growth of seed-sprayed from third year. But the plants were began to competition with between sprayed seeds and invaded plants from third to fifth year after seed-spray. The numbers of invading plants were gradually increased as 581 individuals from sixth year after seed-spray. The cut slopes of the forest roads turned to a good site condition for growing of invasion plants. And also the total coverage on cut slope of forest roads by invading of surrounding plants was increased more. It showed that plant invasion on cut-slopes of forest roads would be mostly influenced by surrounding plants. The number of surrounding plants on the cut-slopes of forest roads was 59 species, and the number of invading plants showed 65 species. The invading species were high in order of Boehmeria tricuspis, Oplismens undulatifolius, Miscanthus sinensis var. purpurascens, Erechtites hieracifolia and Artemisia princeps var. Orientalis In the stepwise regression analysis, main factors affecting the coverage of vegetation on the cut-slopes of forest road showed in order of elapsed years, gravel contents(30~50%), middle, sandy loam, sandy clay-loam, soil hardness, aspect(NS), concave(凹) type and gravel contents(15~30%).

Fundamental Study of Mix Proportions of High-Flow Cement-Based Mortar for Gravel-Fill Used in Restoration of Collapsed Roads (도로유실 복구를 위한 골재 충전 고흐름도 모르타르의 기초 배합 연구)

  • Cho, Hyun Myung;Jeon, Sang Pyo;Kim, Seung Won;Yun, Kyong Ku;Park, Cheol Woo
    • International Journal of Highway Engineering
    • /
    • v.17 no.2
    • /
    • pp.63-70
    • /
    • 2015
  • PURPOSES: As a part of our research into repair techniques for roads that have collapsed as a result of a natural disaster, this study set out to find the optimum mix proportion for gravels to be used to restore a damaged area. METHODS: This study considered flow and strength-development characteristics. The experimental variables were the W/C ratio, the usage of the admixture, the types of cement, and the quantity of fine aggregate over three different experimental stages. The compressive strength was measured at 12 hours, one day, three days, and seven days. RESULTS : The flow varied with the amount of fine aggregate and the use of a high-range water-reducing (HRWR) admixture. The compressive strength also varied with respect to the type of cement and the W/C ratios. The strength satisfied the expected requirement of 21 MPa after one day, provided the mix proportion was appropriate. CONCLUSIONS: A gravel-filling high-flow cement-based mortar exhibited strength and consistency with a W/C ratio in the range of 0.40 to 0.45, assuming the use of HRWR at 0.5 to 0.7% and a fine aggregate/cement ratio of 1.0 to 1.5.