• Title/Summary/Keyword: geothermal development

Search Result 158, Processing Time 0.024 seconds

Geothermal Research and Development in Korea (한국의 지열 연구와 개발)

  • Song, Yoon-Ho;Kim, Hyoung-Chan;Lee, Sang-Kyu
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.485-494
    • /
    • 2006
  • This paper summarizes the history of geothermal research in Korea since 1920s and also describes the present status of research on heat flow, origin of thermal waters and geothermal exploitation and utilization. Geothermal research in Korea has been mainly related with hot spring investigation until 1970s. 1t was not until 1980s before heat flow study became continuous by research institute and academia and first nation-scale geothermal gradient map and heat flow map were published in 1996. Also in 1990s, geochemical isotope analysis of Korean hot spring waters and measurements of heat production rate of some granite bodies were made. Attempts to develop and utilize the deep geothermal water has been tried from early 1990s but field scale exploitations for geothermal water was activated in 2000s. Considering recent increase of demands on both deep and shallow geothermal energy utilization, outlook on future goethermal research and development is encouraging.

The Thermal conductivity analysis and performance evaluation on the pavement applying geothermal snow melting system (지열 융설시스템을 적용한 포장체의 열전도분석 및 구조안전성 검토)

  • Lee, Seung-Ha;Park, Jeong-Sik;Lee, Seok-Jin;Kim, Bong-Chan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.1
    • /
    • pp.17-22
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. For the feasibility study on geothermal snow melting system, analysis of the ground melting point when operating system, life evaluation of pavements and safety evaluation of pipes are performed.

Application of the Geothermal Hybrid System for Huge Size Common Structures with Heating & Cooling System (지열 Hybrid System 개발을 통한 대형 공동구조물 지열에너지 적용성 평가)

  • Park, Si-Sam;Na, Sang-Min;Park, Jong-Hun;Rhee, Keon-Joong;Kim, Tae-Won;Kim, Sung-Yub
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.588-591
    • /
    • 2009
  • Ground source heat pump system; GSHPs is close to most practical use for early stage investment cost and energy efficiency in new renewable energies, and currently considered utilizing to the heat and cooling system of a building. Particularly, the case to utilize 'Standing Column well heat source gathering method' in the open standards process to have the excellent capability of gathering geothermal source is increased. But the research for the optimal design technology and the assessment of a pollution level of the ground to utilize a single well for gathering geothermal is insignificant and the design is insufficient. The heating and cooling system and the equipment to utilize a large size residential development to have over 1000 households have not developed yet. Therefore, our company developed 'geothermal hybrid system' which can construct the heat and cooling system using geothermal energy for a large size residential development of over 1000 households and conducted the evaluation of economic feasibility. Moreover we developed automatic equipment for gathering geothermal source and PLC (Programmable logic controller) to have optimal efficiency and FCU (fan coil unit) considering the floors of large size apartments.

  • PDF

Review on the induced seismic event for artificial reservoir (인공저류층 생성을 위한 유도진동에 관한 사전연구)

  • Jeon, Jong-Ug;Myoung, Woo-Ho;Kim, Young-Deug
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.8 no.2
    • /
    • pp.55-60
    • /
    • 2012
  • In many cases, geothemal wells will not be opened up a geothermal reservoir under such conditions that an extraction of geothermal energy is economically viable without any further measures. Geothermal wells often have to be stimulated, in order to increase productivity. For the non-volcanic area, such as Korea, the hydraulic stimulation is necessary to complete geothermal power plant. The analysis of induced seismic event showed that the thermal resource might have a much wider extent and a much higher generation potential than previously assumed. In order to record compressional and shear waves emitted during fracture stimulation, three-component geophones are placed in a seismometer. The recorded data from one seismometer is the convolution of the source magnitude, the transmission media, and the sensitivity of the instrument.

EGS Power Generation and Hydraulic Stimulation (EGS 지열발전과 저류층 수리자극 기술)

  • Min, Ki-Bok;Song, Yoonho;Yoon, Woon-Sang
    • Tunnel and Underground Space
    • /
    • v.23 no.6
    • /
    • pp.506-520
    • /
    • 2013
  • While geothermal energy provides the only base-load power among renewable energy sources, its development has been carried out predominantly in volcanic area. EGS (Enhanced Geothermal System) is a ubiquitous technology that can allow the geothermal power generation virtually in any area. This manuscript introduces the current state-of-the-art of EGS development in the world and presents the hydraulic stimulation technology and associated microseismicity which are key technical component in EGS. Finally this paper suggests the key research areas required in Korea for further development of EGS.

International Organizations of Geothermal Energy Resources;IGA and IEA-GIA (지열에너지자원분야 국제기구;IGA와 IEA-GIA)

  • Song, Yoon-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.441-444
    • /
    • 2007
  • International Geothermal Association (IGA) and Geothermal Implementing Agreement (GIA) under Committee on Energy Research & Technology (CERT) of International Energy Agency (IEA) are the two major international organizations leading geothermal research, development and deployment (RD&D). IGA has been established in 1988 by geothermal societies in Europe and America and presently consists of 23 affiliated societies. Current number of members of IGA reaches 2,000 from 65 countries and its most important activity may be to organize the World Geothermal Congress (WGC) every five years. IEA-GIA has been established in 1993 and its executive committee (ExCo) consists of 11 countries, 1 organization (EC) and 3 sponsor companies. Korea became a member of ExCo on September 2005 through Korea Institute of Geoscience & Mineral Resources (KIGAM) as representative. KIGAM is also actively participating in Direct Use Annex through a task leader of several tasks.

  • PDF

Development of deep-seated geothermal energy in the Pohang area, Korea (경북 포항지역에서의 심부 지열수자원 개발 사례)

  • Song, Yoonho;Lee, Tae-Jong;Kim, Hyoung-Chan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.693-696
    • /
    • 2005
  • KIGAM (Korea Institute of Geoscience and Mineral Resources) launched a new project to develop the low-temperature geothermal water in the area showing high geothermal anomaly, north of Pohang city, for large-scale space heating. Surface geologic and geophysical surveys including Landsat 1M image analysis, gravity, magnetic, Magnetotelluric (MT) and controlled-source audio-frequency MT (CSAMT), and self-potential (SP) methods have been conducted and the possible fracture zone was found that would serve as deeply connected geothermal water conduit. In 2004, two test wells of 1.1km and 1.5km depths have been drilled and various kinds of borehole survey including geophysical logging, pumping test, SP monitoring, core logging and sample analysis have followed. Temperature of geothermal water at the bottom of 1.5km borehole reached over $70^{\circ}C$ and the pumping test showed that the reservoir contained huge amount of geothermal water. Drilling for the production well of 2 km depth is on going. After test utilization and the feasibility study, geothermal water developed from the production well is going to be provided to nearby apartments.

  • PDF

A Review on World Geothermal Assessment (전세계 지열부존량 평가에 대한 개관)

  • Song, Yoon-Ho;Lee, Young-Min;Lee, Tae-Jong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.613-616
    • /
    • 2008
  • Assessment of geothermal resources like other earth resources is a starting point for decision makers or stakeholders to set up basic plan on its development and R&D policies. In this context, there have been various works on world geothermal assessment, to report different estimates from each other. In this paper, we first introduce the definition of geothermal potential mainly adopted from the article by Muffler and Cataldi (1978) and then summarize the estimates made so far referring the work by Bertani (2003). An updated estimates by Stefansson (2005) are also reviewed in terms of identified resources separately for high-temperature resources for power generation and low-temperature ones for direct-use. Recent estimate of US geothermal resources by MIT (2006) using a volumetric method with extensively accumulated data base is discussed. Finally, we introduce the first geothermal assessment in Korea recently made and discuss its importance.

  • PDF

A Case Study for the Economic Feasibility Model and Analysis of a GDHS Given Geothermal Temperature (기대지열온도하에서 GDHS의 경제성분석 사례연구)

  • Yang, Moon-Hee;Kim, Tai-Yoo;Lee, Sang-Kyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.1
    • /
    • pp.115-127
    • /
    • 1997
  • A GDHS(Geothermal District Heating System) is a heating system supplying a group of districts with heat extracted from geothermal sources. The advantages of GDHS include saving fuel consumption as well as reducing air pollution. This paper presents a case study for the economic feasibility model and analysis of a GDHS with which central/individual heating systems are replaced. Configuring to a simplified GDHS which consisits of subsurface systems, surface systems, and transmission/distribution systems, we find out the properties of the system and the model parameters affecting the initial investment/operating costs in order to develop a classical economic feasibility model given geothermal temperature. Based on our model parameter space, we analyzed the geothermal development project of the Jejoo Island probabilistically given prior information such as the expected geothermal power, the demand size and the length of transmission/distribution pipes.

  • PDF

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.