Ship technology has advanced in many diverse directions in recent years, a trend that can be expected to continue. The effect of this both on the physical equipment now being usedand under construction and on the attitude of mind of many of those responsible for its operation is profound. The technological changes in shipping have brought about an increasing trend towrard more delegation of authority from shoreside to ship management. With increased shipboard responsibility the shipping industry would benefit from seeming that more of the management subjects were learned by nautical students. It is clear advantage that companies should draw into their general management structure men with seafaring experience. At the same time the the boards of shipping companies should include more men with high technological qualificatiions and experience.
Journal of the Korean Recycled Construction Resources Institute
/
v.9
no.4
/
pp.478-482
/
2021
In this paper, methods for manufacturing shielding concrete by recycling steelmaking slag discarded as industrial waste and measuring the shielding effectiveness of the shielding concrete were studied. By comparing the result of shielding effectiveness measurement of this concrete block with shielding effectiveness measurement of the structure constructed with this concrete, the measurement system for measuring shielding effectiveness of the concrete block was verified. The size of the concrete stru ctu re is 2.9 × 2.9 × 3.4m and the concrete block is 0.3 × 0.3 × 0.2m. The frequ ency band u sed for mesu rement is 600MHz - 2GHz, the types of concrete u sed to measu re the shielding effectiveness are general concrete and concrete containing electric arc furnace oxidizing slag. In the case of the concrete structure, reinforcing rebars are installed at intervals of 15cm for stru ctu ral safety, as the frequ ency increase, the electromagnetic wave properties of rebars gradu ally decreased, there was a slight difference in the measurement results. In conclusion, the measurement result of shielding effectiveness of the concrete block is similar to the result of the concrete structure. It is thought that it can be sufficiently utilized for electromagnetic wave engineering design, and the concrete shielding effectiveness measurement system using standard specimens was verified.
Korean Journal of Construction Engineering and Management
/
v.13
no.6
/
pp.121-132
/
2012
The current estimation system of construction equipment cost was first introduced in 1960's when general contractors had ownership of equipment. However, most of construction equipment in construction sites has been rented from equipment leasing company these days. Therefore, the improvement of current cost estimation system is therefore inevitable in order to advance domestic construction industry. This study is aimed to suggest the improved system by analyzing nationwide market rental rates of major construction equipment. A user friendly prototype of actual database grounded on actual market rental rates collected from over 200 leasing companies in the nation was proposed. The database includes various rates and statistics analyzed by different form of contract as well as different region. Using the collected data, "The Cost Estimate System in Construction Equipment Database" was developed by using VBA(Visual Basic for Applications). The system makes users convenient to utilize the rental rates by choosing equipment and region, and various types of contract.
Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.256-261
/
2008
The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.
Journal of the Korean Institute of Landscape Architecture
/
v.26
no.2
/
pp.73-90
/
1998
The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.
Ki, Myung;Shin, Ji-Yeon;Kim, Lahee;Cho, Seong-Sik;An, Ah Reum;Kim, Yeong-Ju
Journal of agricultural medicine and community health
/
v.40
no.2
/
pp.80-92
/
2015
Objectives: To clarify the association between dust from large construction sites and allergic and respiratory conditions among residents in Sejong city. Methods: We included 379 individuals older than 50 years from three areas of Sejong city; two areas near construction sites and one area for a comparison. Prevalence of self-reported allergic and respiratory conditions was compared across the three areas using logistic regression to adjust for covariates including age, gender, smoking, and educational attainment. A total of 16 individuals were interviewed to take details of the residents' experiences of construction work. Results: Those living in the nearby areas around construction sites were generally found to have the increased prevalence for all allergic and respiratory conditions. Odds Ratio(OR)s for cough and sneezing among the six symptoms and allergic rhinitis among the three diagnosed diseases reached statistical significance but only OR for cough remained significant after adjustment: adjusted OR for cough was 2.63 (95% CI, 1.07-6.46). Two relevant themes emerged from semi-structured interview were; 1) most residents from the affected area reported a considerable level of exposure to construction dust, 2) about half of them noted that construction dust influences allergic- and respiratory health. Conclusions: General pattern provides suggestive evidence that living close to construction sites may be positively associated with elevated risks of allergic and respiratory conditions. Efforts should be made to establish preventive measures and a comprehensive in-depth health impact assessment on this issue.
Korean Journal of Construction Engineering and Management
/
v.21
no.6
/
pp.56-65
/
2020
Urban renovation projects (reconstruction and redevelopment) have a longer licensing period than general housing projects, and many consultations with the licensing authorities require expertise. Most of the members of the union do not have basic knowledge of the maintenance business, so they have a lot of authority to promote smooth business Is entrusted to the union leader. However, contrary to the original purpose entrusted by the members, it is easy to find a case where the business is suspended because the union leader is exposed to corruption for the private interests of the union, and the members' disputes could not be resolved. In order to overcome this risk, the problem of the maintenance project was found through a questionnaire survey composed of practical experts, and a solution was presented through the KCSI evaluation model. This study mentioned the necessity of a responsible CM that can make independent business decisions without interference from the union, rather than a management-type CM limited to the cooperative's work assistance. In order to promote the construction industry's national role, it was necessary to revitalize responsible CM, so six practical alternatives were proposed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.1
/
pp.9-16
/
2016
The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.
Under the circumstances of general use of Internet, the construction of on-line system has been made in various fields. We can use and share the informations will other people through the cyber communities and find many ways to promote communication tools. Project Room is a sort of Cyber Space which carry out design project using On-fine system. Users(Designers and Clients) will be able to develop their design project using Internet. The project content may be opened and will be critically contributed the construction of Knowledge-based industry. At the same time, the development of user-friendly tutorial should be fellowed. Tutorial is one of the most important factors to promote Project Room. This study presents the possibility of execution of Cyber community under the construction of Project Room and User-friendly tutorial in the On-line system.
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.6
/
pp.198-204
/
2010
The cover of truck agitator give in a part to prevent the lower flowing of fresh concrete when the concrete are transported from the ready mixed concrete plant to the construction field. As a result of the question data, it show up a dirty image to the general civil society. Due to the above image, it is predicted to affect the image of the construction company, so we did the site experiment of the flowing, the amounts of air, the temperature change of concrete with the concrete left in the site, to find out the usefulness. Also, for the comparing with this, we got the result by doing the inner experiment with the same condition. As the result of the experiment, the cover of truck agitator affect little to the reduction of slump. The change of the air amount, regardless of the existence of cover, was not effected much in proper level until 60minutes. In addition, The compression strength was proper to the goal design strength until 90minutes regardless of the cover of truck agitator exist or not exist.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.