A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works (전기분야 실적공사비 적산제도에서 이윤산정 분석 및 제안)

  • Seo, S.S.;Lim, S.H.;Kwon, Y.M.;Kim, H.G.;Kim, J.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.155-159
    • /
    • 2007
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower if current rate of exceeds (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

Vegetation Effects and Properties on Green Soil Blended with Cement-Based Materials for Slope Stability (시멘트 기반 재료를 혼합한 사면 안정용 녹생토의 물성 및 식생 영향성)

  • Choi, Yoon-Suk;Kim, Joo-Hyung;Cho, Young-Keun;Kim, Ho-Kyu;Park, Ok-Yun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.2
    • /
    • pp.117-126
    • /
    • 2021
  • An experimental study was carried out to investigate the applicability of cement-based materials for green soil which is a soil for promoting plant growth. The results show that the shear strength of the green soil mixed with gypsum cement (No.3) was low, but the hardness (23.6mm) and pH value (7.4) was most suitable for the vegetation environment. In addition, the initial vegetation germination of green soil, which improved performance by adding a moisturizer, was slower than that of general green soil, and the conductivity value tended to be slightly higher. On the other hand, the slope adhesion of advanced green soil was high, and it was found that the plant growth rate and the regeneration capacity were superior after time passed.

Distributed Coordination of Project Schedule Changes by Using Software Agents (소프트웨어 에이전트를 이용한 건설공사 공정관리의 분산화)

  • Kim Kee-soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.85-90
    • /
    • 2002
  • In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become less effective as subcontractors perform most work and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subcontractors and ultimately the entire project. Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can reschedule a project dynamically. To enable the new distributed coordination of project schedule changes, I developed a novel agent-based compensatory negotiation methodology, which allows software agents to simulate negotiations on behalf of their human subcontractors. This research formalizes the necessary steps that would help construction project participants to increase the efficiency of their resource use, which in turn will enhance successful completions of whole projects.

  • PDF

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

A Study on the Digital Construction Information Structure for the Implementing Digital Twin of Road Construction Sites (도로 건설현장의 디지털트윈 구현을 위한 디지털 건설정보구조에 관한 연구)

  • Taewon Chung;Hyon Wook Ji;Jin Hoon Bok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.1
    • /
    • pp.153-166
    • /
    • 2024
  • The digitalization of tasks for smart construction requires the smooth exchange of digital data among stakeholders to be effective, but there is a lack of digital data standardization and utilization methods. This paper proposes a digital construction information structure to transform information from road construction sites into digital formats. The study targets include significant tasks, such as work planning, scheduling, safety management, and quality control. The key to the construction information structure is separating construction information into objects and activities, defining unit works by combining these two types of information to ensure flexibility in representing and modifying construction information. The objects and activities have their respective hierarchical structures, which are defined flexibly to match the actual content. This structure achieves both efficiency and detail. The pilot structure was applied to highway construction projects and implemented digitally using general formats. This study enables the digitalization of road construction processes that closely resemble reality, accelerating the digital transformation of the civil engineering industry by developing a digital twin of the entire road construction lifecycle.

A Study on the Improvement of KOSHA 18001 Utilization in Construction Industry associated with the External Evaluator (외부 심사원을 통한 건설업 KOSHA 18001 활용도 개선에 관한 연구)

  • Lee, Jin Seop;Lee, Dong Yul;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.4
    • /
    • pp.135-141
    • /
    • 2015
  • At the end of 2014, ordering organizations, 25 general contractors and 80 specialty contractors were certified by the KOSHA 18001 for the establishment of safety & health management system. However, safety management departments in the certified companies have been disrupted due to the financial difficulty and CEO's indifference, which has resulted in the cancellation of more than 30% of the certifications. Furthermore, the KOSHA 18001 due to the shortage of internal evaluators in KOSHA and the increase of applications for new certification & the extension of the certification is placed in a difficult situation in the near future. Therefore, it is necessary to enhance the KOSHA 18001 by solutions such as introducing outside evaluators, which is the key point of this study. This study was performed through the questionnaire survey & the interviews with the construction companies, ordering organization and KOSHA 18001 specialists The content is centered on the introduction of external evaluators. As a result, the introduction of external evaluators is necessary through amending certification regulation because only internal evaluators cannot afford to process all the new application and the extension of existing certifications.

A Study on the Development of the Model for Construction of Energy Circulating Village based on the Eco-friendly Agriculture (친환경농업을 기반으로 하는 에너지 순환형 마을조성 모델개발에 관한 연구)

  • Choi, Soo-Young;Yoo, Duck-Ki
    • Korean Journal of Organic Agriculture
    • /
    • v.18 no.2
    • /
    • pp.135-154
    • /
    • 2010
  • The green craze has hit all the world lately. The green revolution which means immense changes for sustainable development under the new environment-economy system is foretelling that we should have new angle to the environment and economy. This paper is about the development of the model and indicators for construction of ECO(Energy Circulating Organic)-Village which is the green growth option of local community. This model is composed of three concepts - SPDC (about procedural methodology of Model), Virtuous Circle (about functional relationships of three requisites), Network (about spatial relationships between communities) - and evaluation indicators. Environment, tourism, industry (Energy & Organic Agriculture) are set as the three requisites for green growth of local community. Nations of the world plunge into the green war which is silent, general, sweeping changes. We can not win this war with the existing thinking system and policy. We need revolutionary changes reconsidering of environmental value and sustainable development strategy of the region. Each of us should go through the changes and this work would be the one among those efforts.

Properties of Compressive Strength after Accelerated Carbonation of Non-Sintered Cement Mortar Using Blast Furnace Slag and Fly Ash (고로슬래그 미분말과 플라이애시를 사용한 비소성 시멘트 모르타르의 촉진 탄산화에 따른 압축 강도 특성)

  • Ryu, Ji-Su;Na, Hyeong-Won;Hyung, Won-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.297-298
    • /
    • 2023
  • In the concrete industry, efforts are being made to reduce CO2 emissions, and technologies that collect, store, and utilize CO2 have recently been studied. This study analyzed the change in compressive strength after the accelerated carbonation test of Non-Sintered Cement(NSC) mortar. Type C Fly Ash and Type F Fly Ash were mixed in a 1:1 ratio and then mixed with Blast Furnace Slag fine powder to produce NSC. The mortar produced was cured underwater until the target age. In addition, an accelerated carbonation test was conducted under the condition of a concentration of 5 (±1.0%) of CO2 gas for 14 days. The mortar compressive strength was measured before and after 14 days of accelerated carbonation test based on the 7th and 28th days of age. As a result of the experiment, the compressive strength was improved in all binder. In general, the compressive strength of NSC mortar subjected to the accelerated carbonation test was similar to that of Ordinary Portland Cement(OPC) mortar not subjected to the accelerated carbonation test.

  • PDF

Mobile-based Educational PLC Environment Construction Model

  • Park, Seong-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.1
    • /
    • pp.61-67
    • /
    • 2022
  • In this paper, we propose a model that can convert some of the simulation program resources to a mobile environment. Recently, smart factories that use PLCs as controllers in the manufacturing industry are rapidly becoming widespread. However, in the situation where it is difficult to operate due to the shortage of PLC operation personnel, the actual situation is that a platform for PLC operation education is necessary. Currently most PLC-related educational platforms are based on 2D, which makes accurate learning difficult and difficult. When a simulation program is applied to distance learning in a general PC environment, many elements are displayed on the monitor, which makes screen switching inconvenient. Experiments with the proposed model confirmed that there was no frame deterioration under general circumstances. The average response time by the request frame was 102 ms, and it was judged that the learner was not at the level of experiencing the system delay.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.