• 제목/요약/키워드: flow-duration curve

검색결과 154건 처리시간 0.02초

수질오염총량관리 단위유역 장기유황곡선 구축 -낙동강수계를 대상으로- (Development of Long Term Flow Duration Curves for the Management of Total Maximum Daily Loads - in the Nakdong River Basin -)

  • 김경훈;권헌각;안정민;김상훈;임태효;신동석;정강영
    • 한국환경과학회지
    • /
    • 제26권8호
    • /
    • pp.939-953
    • /
    • 2017
  • For the development of flow duration curves for the management of 41 Total Maximum Daily Load (TMDL) units of the Nakdong River basin, first, an equation for estimating daily flow rates as well as the level of correlation (correlation and determination coefficients) was extrapolated through regression analysis of discrete (Ministry of Environment) and continuous (Ministry of Land, Infrastructure and Transportation) measurement data. The equation derived from the analysis was used to estimate daily flow rates in order to develop flow duration curves for each TMDL unit. By using the equation, the annual flow duration curves and flow curves, for the entire period and for each TMDL unit of the basin, were developed to be demonstrated in this research. Standard flow rates (abundant-, ordinary-, low- and drought flows) for major flow duration periods were calculated based on the annual flow duration curves. Then, the flow rates, based on percentile ranks of exceedance probabilities (5, 25, 50, 75, and 95%), were calculated according to the flow duration curves for the entire period and are suggested in this research. These results can be used for feasibility assessment of the set values of primary and secondary standard flow rates for each river system, which are derived from complicated models. In addition, they will also be useful for the process of implementing TMDL management, including evaluation of the target level of water purity based on load duration curves.

미계측 유역의 유황곡선 산정을 위한 지역회귀모형의 개발 (Development of Regional Regression Model for Estimating Flow Duration Curves in Ungauged Basins)

  • 이태희;이민호;이재응
    • 대한토목학회논문집
    • /
    • 제36권3호
    • /
    • pp.427-437
    • /
    • 2016
  • 본 연구에서는 지형 및 기상학적 인자만으로 미계측 유역의 저유량부 유황곡선을 추정할 수 있는 지역회귀모형을 개발하고자 하였다. 이를 위해서 16개 유역의 계측 자료로부터 저유량 영역(지속일수 185일에서 365일)에 대한 유황곡선을 작성하고, 이를 토대로 로그형태의 이변수 회귀모형을 구축하였다. 이 회귀모형을 미계측 유역에 적용할 수 있도록 유역면적, 유역경사, 수계밀도, 연평균강수량, 연평균유출량, 유출곡선지수 등의 유역특성인자를 이용하여 모형의 매개변수를 지역화 하였다. 개발한 지역회귀모형으로 평균갈수량, 평균저수량, 평균평수량을 추정하여 관측값과 비교한 결과, 유역면적, 유출곡선지수, 연평균강수량 조합으로 구성된 지역회귀모형이 가장 우수한 것으로 분석되었다.

낙동강 유역 BOD, COD 및 TOC의 수문학적 플럭스 추정 (Estimating BOD, CDO and TOC Hydrologic Flux in Nakdong River Basin)

  • 이아연;박무종;조덕준;김상단
    • 대한환경공학회지
    • /
    • 제32권9호
    • /
    • pp.830-839
    • /
    • 2010
  • 본 연구에서는 현재 시행되고 있는 오염총량관리제 모니터링 시스템에 적용가능한 부하량 추정기법에 대하여 제시하였다. 수정 TANK 모형을 통하여 8일 간격 유량자료의 1일 간격 유량자료로의 확장을 시행하여 유황곡선의 작성을 가능하게 하였다. 7변수 대수 선형 모형 적용 통한 BOD, COD 및 TOC 부하량 추정에서 만족스러운 결과를 확인할 수 있었다. 연구의 적용의 일환으로, 낙동강유역의 BOD, COD 및 TOC 항목의 부하량 유황 곡선을 작성하여 전체적인 분포를 살펴보았다. 본 연구를 통하여 파악된 부하량 유황곡선은 해당 지점의 현재 전체적인 수질현황을 확률적으로 파악할 수 있음과 동시에 이를 시각적으로 도시할 수 있는 장점을 가지고 있다.

적설 및 융설의 영향을 고려한 장기유출 모의 (Long-Term Runoff Simulation in Consideration of Snow Pack and Snow Melt)

  • 김대근;정재웅;박재현;박창근
    • 상하수도학회지
    • /
    • 제21권3호
    • /
    • pp.265-272
    • /
    • 2007
  • This study uses the SWAT model to analyze the characteristics of long-term runoff at the Ssang-cheon Basin located in the city of Sokcho, which is located in the province of Gangwon. The study considers the effect of snow packing and snow melting in a runoff simulation. In this simulation, the study examines the need to introduce a snow pack and snow melt model to evaluate the water resources of the mountainous region of the Gangwon province. The findings of this study indicate that the runoff hydrograph that was produced approximates the true measured flow when the effect of the snow pack and snow melt are considered, compared to when they are not factored in. The analysis of the flow duration curve indicates that the stream flow largely increases when the effect of the snow pack and snow melt are considered. The wet stream flow was shown to increase by nearly 3% due to the melting effect, while the normal stream flow, low stream flow and drought stream flow were shown to increase by slightly more than 10%. Specifically, it was found that as the stream flow decreases, the effect of the snow pack and snow melt on the stream flow increases.

Determining the flow curves for an inverse ferrofluid

  • Ekwebelam, C.C.;See, H.
    • Korea-Australia Rheology Journal
    • /
    • 제20권1호
    • /
    • pp.35-42
    • /
    • 2008
  • An inverse ferrofluid composed of micron sized polymethylmethacrylate particles dispersed in ferrofluid was used to investigate the effects of test duration times on determining the flow curves of these materials under constant magnetic field. The results showed that flow curves determined using low duration times were most likely not measuring the steady state rheological response. However, at longer duration times, which are expected to correspond more to steady state behaviour, we noticed the occurrence of plateau and decreasing flow curves in the shear rate range of $0.004\;s^{-1}$ to ${\sim}20\;s^{-1}$, which suggest the presence of nonhomogeneities and shear localization in the material. This behaviour was also reflected in the steady state results from shear start up tests performed over the same range of shear rates. The results indicate that care is required when interpreting flow curves obtained for inverse ferrofluids.

HSPF를 이용한 비점오염원 삭감에 따른 효과 분석 (Assessing Impact of Reduction of Non-Point Source Pollution by BASINS/HSPF)

  • 배다혜;하성룡
    • 환경영향평가
    • /
    • 제20권1호
    • /
    • pp.71-78
    • /
    • 2011
  • This paper aims to assessing impact of reduction of non-point source pollution in the Bokha Stream watershed. The BASINS/HSPF model was calibrated and verified for water flow and water qualities using Total Maximum Daily Load 8days data from 2006 to 2007. Accuracy of the BASINS/HSPF models in simulating hydrology and water quality was compared and there were somewhat differences of statistical results, but water flow and water quality were simulated in good conditions over the study period. The applicability of models was tested to evaluate non-point source control scenarios to response hydrology and water quality in the Bokha stream using various measures which include BMPs approach and change of landuse. The evaluation of reduction of non-point source pollution was developed using load-duration curve. Despite strong reduction of non-point source, there are not satiated target quality at low flow season.

도시 하천유지유량 공급의 저수지 운영 방법 (Operation rule curve for supplying urban instream flow from reservoir)

  • 노재경;이재남
    • 농업과학연구
    • /
    • 제38권1호
    • /
    • pp.163-172
    • /
    • 2011
  • To provide the operation rule curve for suppling instream flow to urban stream from reservoir, the Soho reservoir with watershed area of 7.4 $km^2$ and total water storage of 2.58 $Mm^3$ was planned at the headwaters of the Daejeoncheon. Daily streamflow was simulated and using the simulated streamflow and desired instream flow, the operation rule curve by Senga method was drawn and evaluated through reservoir operation. Senga method is derived by accumulating the differences between streamflow and desired instream flow adversely. Water storages were simulated on a daily basis to supply urban instream flow from Soho reservoir, but the amount of supplying instream flow to urban stream was not nearly increased comparing with that of normal operation that does not used the rule curve. Thereafter the new simulation-based operation rule curve was derived and applied to supply instream flow from Soho reservoir. In normal operation, the amount of instream flow was shown to 15,000 $m^3$/d, but it was increased to 27,700 $m^3$/d in withdrawal limited operation using the new derived rule curve, in which the applicability of this rule curve was proved. Also comparing with the flow duration curves at station just before urban Daejeoncheon stream without and with upstream Soho reservoir, the 95th flow was decreased from 1.64 mm/d to 1.51 mm/d, and the 355th flow was increased from 0.17 mm/d to 0.30 mm/d. Monthly streamflows during October to March were increased from 10.6~24.1 mm to 24.1~34.0 mm with the increasing rate of 141~227%.

부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds)

  • 김은경;류지철;김홍태;김용석;신동석
    • 한국물환경학회지
    • /
    • 제31권6호
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

환경부 8일 간격 유량·수질 관측자료와 분포형 모형을 이용한 연속오염부하곡선의 유도 (Derivation of Continuous Pollutant Loadograph using Distributed Model with 8-Day Measured Flow and Water Quality Data of MOE)

  • 김철겸;김남원
    • 한국물환경학회지
    • /
    • 제25권1호
    • /
    • pp.125-135
    • /
    • 2009
  • Reliable long-term flows by SWAT-K model were applied to the relationship between stream flow and pollutant load derived from 8-day measured data of Ministry of Environment (MOE) in order to obtain continuous loadograph and evaluate accuracy in water quality modeling for the Chungju dam watershed. The measured flow were compared with flow duration curve from the model, and it showed that measured values corresponded to the almost full range of stream flow conditions except at Odae A. And there was significant relationship ($R^2=0.60{\sim}0.97$) between measured flow and water quality load at all unit-watersheds. Applying this relationship to simulated flows, continuous loadograph was obtained and compared with modeled pollutant loads. Although there were some differences during some dry and flood seasons, those were not significant and overall trend showed a good agreement. From the results, we would be able to derive a continuous loadograph based on measured data at total maximum daily loads (TMDLs) unit-watersheds on a national scale, in which stream flow and water quality have been measured at 8-day intervals since 2004, and this could be helpful to utilize distributed water quality models with difficulty in calibrating and validating parameters from lack of measured data at present.