• Title/Summary/Keyword: flow routing

Search Result 243, Processing Time 0.027 seconds

A Resource-Aware Mapping Algorithm for Coarse-Grained Reconfigurable Architecture Using List Scheduling (리스트 스케줄링을 통한 Coarse-Grained 재구성 구조의 맵핑 알고리즘 개발)

  • Kim, Hyun-Jin;Hong, Hye-Jeong;Kim, Hong-Sik;Kang, Sung-Ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.6
    • /
    • pp.58-64
    • /
    • 2009
  • For the success of the reconfigurable computing, the algorithm for mapping operations onto coarse-grained reconfigurable architecture is very important. This paper proposes a resource-aware mapping system for the coarse-grained reconfigurable architecture and its own underlying heuristic algorithm. The operation assignment and the routing path allocation are simultaneously performed with a cycle-accurate time-exclusive resource model. The proposed algorithm minimizes the communication resource usage and the global memory access with the list scheduling heuristic. The operation to be mapped are prioritized with general properties of data flow. The evaluations of the proposed algorithm show that the performance is significantly enhanced in several benchmark applications.

Applications of Mobile GIS Solution for Utility Management (시설물관리를 위한 Mobile GIS 솔루션 활용)

  • 한승희;이용욱;이형석
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.1
    • /
    • pp.69-75
    • /
    • 2002
  • The important issues of facility database management in GIS are to collect up-to-date information and to update information in accordance with new-establishment, repair and replacement of the facilities. Therefore, it is necessary to develop a system which has capability of monitoring facilities as well as managing database efficiently. The purpose of this study is to propose possibility of implementation of mobile GIS solution for the facility management. In order to achieve the goal, to process existing digital maps and to receive on-site information through the wireless communication service are required. In addition, the system is required to process spatial information obtained by GPS and digital photogrammetric technique with real-time updating database in server. The system increases efficiency both in work flow and monitoring for facility management by providing optimal routing information to the sites and real-time two-way communication using VoIP(Voice over Internet Protocol). The system is expected to perform real-time database management effectively. In consequence, the system could appropriately response on-site situations in various practical applications. The proposed technology could contribute to improve nation's leading-edge technology.

Efficient Route Determination Technique in LBS System

  • Kim, Sung-Soo;Kim, Kwang-Soo;Kim, Jae-Chul;Lee, Jong-Hun
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.843-845
    • /
    • 2003
  • Shortest Path Problems are among the most studied network flow optimization problems, with interesting applications in various fields. One such field is the route determination service, where various kinds of shortest path problems need to be solved in location-based service. Our research aim is to propose a route technique in real-time locationbased service (LBS) environments according to user’s route preferences such as shortest, fastest, easiest and so on. Turn costs modeling and computation are important procedures in route planning. There are major two kinds of cost parameters in route planning. One is static cost parameter which can be pre-computed such as distance and number of traffic-lane. The other is dynamic cost parameter which can be computed in run-time such as number of turns and risk of congestion. In this paper, we propose a new cost modeling method for turn costs which are traditionally attached to edges in a graph. Our proposed route determination technique also has an advantage that can provide service interoperability by implementing XML web service for the OpenLS route determination service specification. In addition to, describing the details of our shortest path algorithms, we present a location-based service system by using proposed routing algorithms.

  • PDF

Unsteady Flow Analysis in the Youngsan River Using Explicit and Implicit Finite Difference Methods (양해법과 음해법을 이용한 영산강에서의 부정류해석)

  • Choi, Sung-Uk;Yeo, Woon-Kwang;Choo, Cheol;Kim, Chang-Wan;O, Yu-Chang
    • Water for future
    • /
    • v.24 no.4
    • /
    • pp.49-58
    • /
    • 1991
  • Flood routing in the Youngsan River was performed for the flood event of July, 1989 by two finite difference methods. The Saint Venant eq., a kind of hyperbolic partial differential equation is employed as governing equation and the explicit scheme (Leap Frog) and implicit scheme (Preissmann) are used to discretize the GE. As for the external boundary conditions, discharge and tidal elevation are upstream and downstream BC, respectively and estuary dam is included in internal BC. Lateral inflows and upstream discharges are the hourly results from storage function method, At Naju station, a Relatively upstream points in this river, the outputs are interpreted as good ones by comparing two numerical results of FDMs with the observed data and the calibrated results by storage function method. and two computational results are compared at the other sites, from middle stream and downstream points, and thus are considered reliable. Therefore, we can conclude from this research that these numerical models are adaptable in simulating and forecasting the flood in natural channels in Korea as well as existing hydrologic models. And the study about optimal gate control at the flood time is expected as further study using these models.

  • PDF

Effects on Conservation and Flood Control Systems According In Normal Water Level Change from Daechung Multi-Purpose Reservoir (대청 다목적댐의 상시만수위 변경에 따른 이수 및 치수 영향 검토)

  • Yi, Jae-Eung;Kwon, Dong-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.1 s.174
    • /
    • pp.1-10
    • /
    • 2007
  • Reallocation procedure of multipurpose reservoir storage capacity between flood control and conservation is presented as an alternative to secure more water resources. Storage reallocation is an adaptive management mechanism for converting existing normal pool level of reservoirs to more beneficial uses without requirement for physical alteration. This study is intended to develop a reservoir storage reallocation methodology that allows increased water supply storage without minimizing adverse impacts on flood control. The methodology consists of flood control reservoir simulation for inflows with various return periods, flow routing from reservoir to a potential damage site, analyzing river carrying capacity, and reservoir yields estimation for reallocated storages. For the flood control model, a simulation model called Rigid ROM(Reservoir Operation Method) and HEC-5 are used. The approach is illustrated by applying it to two reservoirs system in Geum River basin. Especially with and without new project conditions are considered to analyze trade-offs between competing objectives.

Integrating Resilient Tier N+1 Networks with Distributed Non-Recursive Cloud Model for Cyber-Physical Applications

  • Okafor, Kennedy Chinedu;Longe, Omowunmi Mary
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.7
    • /
    • pp.2257-2285
    • /
    • 2022
  • Cyber-physical systems (CPS) have been growing exponentially due to improved cloud-datacenter infrastructure-as-a-service (CDIaaS). Incremental expandability (scalability), Quality of Service (QoS) performance, and reliability are currently the automation focus on healthy Tier 4 CDIaaS. However, stable QoS is yet to be fully addressed in Cyber-physical data centers (CP-DCS). Also, balanced agility and flexibility for the application workloads need urgent attention. There is a need for a resilient and fault-tolerance scheme in terms of CPS routing service including Pod cluster reliability analytics that meets QoS requirements. Motivated by these concerns, our contributions are fourfold. First, a Distributed Non-Recursive Cloud Model (DNRCM) is proposed to support cyber-physical workloads for remote lab activities. Second, an efficient QoS stability model with Routh-Hurwitz criteria is established. Third, an evaluation of the CDIaaS DCN topology is validated for handling large-scale, traffic workloads. Network Function Virtualization (NFV) with Floodlight SDN controllers was adopted for the implementation of DNRCM with embedded rule-base in Open vSwitch engines. Fourth, QoS evaluation is carried out experimentally. Considering the non-recursive queuing delays with SDN isolation (logical), a lower queuing delay (19.65%) is observed. Without logical isolation, the average queuing delay is 80.34%. Without logical resource isolation, the fault tolerance yields 33.55%, while with logical isolation, it yields 66.44%. In terms of throughput, DNRCM, recursive BCube, and DCell offered 38.30%, 36.37%, and 25.53% respectively. Similarly, the DNRCM had an improved incremental scalability profile of 40.00%, while BCube and Recursive DCell had 33.33%, and 26.67% respectively. In terms of service availability, the DNRCM offered 52.10% compared with recursive BCube and DCell which yielded 34.72% and 13.18% respectively. The average delays obtained for DNRCM, recursive BCube, and DCell are 32.81%, 33.44%, and 33.75% respectively. Finally, workload utilization for DNRCM, recursive BCube, and DCell yielded 50.28%, 27.93%, and 21.79% respectively.

Development of One-to-One Shortest Path Algorithm Based on Link Flow Speeds on Urban Networks (도시부 가로망에서의 링크 통행속도 기반 One-to-One 최단시간 경로탐색 알고리즘 개발)

  • Kim, Taehyeong;Kim, Taehyung;Park, Bum-Jin;Kim, Hyoungsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.5
    • /
    • pp.38-45
    • /
    • 2012
  • Finding shortest paths on time dependent networks is an important task for scheduling and routing plan and real-time navigation system in ITS. In this research, one-to-one time dependent shortest path algorithms based on link flow speeds on urban networks are proposed. For this work, first we select three general shortest path algorithms such as Graph growth algorithm with two queues, Dijkstra's algorithm with approximate buckets and Dijkstra's algorithm with double buckets. These algorithms were developed to compute shortest distance paths from one node to all nodes in a network and have proven to be fast and efficient algorithms in real networks. These algorithms are extended to compute a time dependent shortest path from an origin node to a destination node in real urban networks. Three extended algorithms are implemented on a data set from real urban networks to test and evaluate three algorithms. A data set consists of 4 urban street networks for Anaheim, CA, Baltimore, MD, Chicago, IL, and Philadelphia, PA. Based on the computational results, among the three algorithms for TDSP, the extended Dijkstra's algorithm with double buckets is recommended to solve one-to-one time dependent shortest path for urban street networks.

Blocking Intelligent Dos Attack with SDN (SDN과 허니팟 기반 동적 파라미터 조절을 통한 지능적 서비스 거부 공격 차단)

  • Yun, Junhyeok;Mun, Sungsik;Kim, Mihui
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • With the development of network technology, the application area has also been diversified, and protocols for various purposes have been developed and the amount of traffic has exploded. Therefore, it is difficult for the network administrator to meet the stability and security standards of the network with the existing traditional switching and routing methods. Software Defined Networking (SDN) is a new networking paradigm proposed to solve this problem. SDN enables efficient network management by programming network operations. This has the advantage that network administrators can flexibly respond to various types of attacks. In this paper, we design a threat level management module, an attack detection module, a packet statistics module, and a flow rule generator that collects attack information through the controller and switch, which are components of SDN, and detects attacks based on these attributes of SDN. It proposes a method to block denial of service attacks (DoS) of advanced attackers by programming and applying honeypot. In the proposed system, the attack packet can be quickly delivered to the honeypot according to the modifiable flow rule, and the honeypot that received the attack packets analyzed the intelligent attack pattern based on this. According to the analysis results, the attack detection module and the threat level management module are adjusted to respond to intelligent attacks. The performance and feasibility of the proposed system was shown by actually implementing the proposed system, performing intelligent attacks with various attack patterns and attack levels, and checking the attack detection rate compared to the existing system.

Derivation of the Synthetic Unit Hydrograph Based on the Watershed Characteristics (유역특성에 의한 합성단위도의 유도에 관한 연구)

  • 서승덕
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.17 no.1
    • /
    • pp.3642-3654
    • /
    • 1975
  • The purpose of this thesis is to derive a unit hydrograph which may be applied to the ungaged watershed area from the relations between directly measurable unitgraph properties such as peak discharge(qp), time to peak discharge (Tp), and lag time (Lg) and watershed characteristics such as river length(L) from the given station to the upstream limits of the watershed area in km, river length from station to centroid of gravity of the watershed area in km (Lca), and main stream slope in meter per km (S). Other procedure based on routing a time-area diagram through catchment storage named Instantaneous Unit Hydrograph(IUH). Dimensionless unitgraph also analysed in brief. The basic data (1969 to 1973) used in these studies are 9 recording level gages and rating curves, 41 rain gages and pluviographs, and 40 observed unitgraphs through the 9 sub watersheds in Nak Oong River basin. The results summarized in these studies are as follows; 1. Time in hour from start of rise to peak rate (Tp) generally occured at the position of 0.3Tb (time base of hydrograph) with some indication of higher values for larger watershed. The base flow is comparelatively higher than the other small watershed area. 2. Te losses from rainfall were divided into initial loss and continuing loss. Initial loss may be defined as that portion of storm rainfall which is intercepted by vegetation, held in deppression storage or infiltrated at a high rate early in the storm and continuing loss is defined as the loss which continues at a constant rate throughout the duration of the storm after the initial loss has been satisfied. Tis continuing loss approximates the nearly constant rate of infiltration (${\Phi}$-index method). The loss rate from this analysis was estimated 50 Per cent to the rainfall excess approximately during the surface runoff occured. 3. Stream slope seems approximate, as is usual, to consider the mainstreamonly, not giving any specific consideration to tributary. It is desirable to develop a single measure of slope that is representative of the who1e stream. The mean slope of channel increment in 1 meter per 200 meters and 1 meter per 1400 meters were defined at Gazang and Jindong respectively. It is considered that the slopes are low slightly in the light of other river studies. Flood concentration rate might slightly be low in the Nak Dong river basin. 4. It found that the watershed lag (Lg, hrs) could be expressed by Lg=0.253 (L.Lca)0.4171 The product L.Lca is a measure of the size and shape of the watershed. For the logarithms, the correlation coefficient for Lg was 0.97 which defined that Lg is closely related with the watershed characteristics, L and Lca. 5. Expression for basin might be expected to take form containing theslope as {{{{ { L}_{g }=0.545 {( { L. { L}_{ca } } over { SQRT {s} } ) }^{0.346 } }}}} For the logarithms, the correlation coefficient for Lg was 0.97 which defined that Lg is closely related with the basin characteristics too. It should be needed to take care of analysis which relating to the mean slopes 6. Peak discharge per unit area of unitgraph for standard duration tr, ㎥/sec/$\textrm{km}^2$, was given by qp=10-0.52-0.0184Lg with a indication of lower values for watershed contrary to the higher lag time. For the logarithms, the correlation coefficient qp was 0.998 which defined high sign ificance. The peak discharge of the unitgraph for an area could therefore be expected to take the from Qp=qp. A(㎥/sec). 7. Using the unitgraph parameter Lg, the base length of the unitgraph, in days, was adopted as {{{{ {T}_{b } =0.73+2.073( { { L}_{g } } over {24 } )}}}} with high significant correlation coefficient, 0.92. The constant of the above equation are fixed by the procedure used to separate base flow from direct runoff. 8. The width W75 of the unitgraph at discharge equal to 75 per cent of the peak discharge, in hours and the width W50 at discharge equal to 50 Per cent of the peak discharge in hours, can be estimated from {{{{ { W}_{75 }= { 1.61} over { { q}_{b } ^{1.05 } } }}}} and {{{{ { W}_{50 }= { 2.5} over { { q}_{b } ^{1.05 } } }}}} respectively. This provides supplementary guide for sketching the unitgraph. 9. Above equations define the three factors necessary to construct the unitgraph for duration tr. For the duration tR, the lag is LgR=Lg+0.2(tR-tr) and this modified lag, LgRis used in qp and Tb It the tr happens to be equal to or close to tR, further assume qpR=qp. 10. Triangular hydrograph is a dimensionless unitgraph prepared from the 40 unitgraphs. The equation is shown as {{{{ { q}_{p } = { K.A.Q} over { { T}_{p } } }}}} or {{{{ { q}_{p } = { 0.21A.Q} over { { T}_{p } } }}}} The constant 0.21 is defined to Nak Dong River basin. 11. The base length of the time-area diagram for the IUH routing is {{{{C=0.9 {( { L. { L}_{ca } } over { SQRT { s} } ) }^{1/3 } }}}}. Correlation coefficient for C was 0.983 which defined a high significance. The base length of the T-AD was set to equal the time from the midpoint of rain fall excess to the point of contraflexure. The constant K, derived in this studies is K=8.32+0.0213 {{{{ { L} over { SQRT { s} } }}}} with correlation coefficient, 0.964. 12. In the light of the results analysed in these studies, average errors in the peak discharge of the Synthetic unitgraph, Triangular unitgraph, and IUH were estimated as 2.2, 7.7 and 6.4 per cent respectively to the peak of observed average unitgraph. Each ordinate of the Synthetic unitgraph was approached closely to the observed one.

  • PDF

Evaluation for Constructing Isochrones using a GIS (GIS를 이용한 등시간도 작성의 평가)

  • Cho, Hyo-Seob;Kim, Ke-Ho;Jung, Kwan-Sue;Kim, Jae-Han
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.6
    • /
    • pp.925-936
    • /
    • 2003
  • The objective of this study is to suggest new drawing methods of isochrones using GIS. For this purpose the Unit Hydrograph (UH) of studied watershed for instantaneous rainfall suggested by Clark have been determined by routing the time-area curve through a single linear reservoir. To evaluate constructing methods of isochrones three methods has been examined; Channel Profile and Clark-kict method; Laurenson method; Average velocity method of S.C.S. Also, these methods have been recomposed by GIS in this study. To apply first method, spatial modeling, the vector based on the stream network and Route_System measuring a distance between points has been used. A raster based on the flow direction grid from burn DEM and the slope grid from original DEM has been applied for the second method. The third method has been applied by a raster based on the landuse grid and a velocity function expressed by slope. Results by these three methods have been evaluated with observed hydrograph, and the method using average velocity method of S.C.S shows more reasonable results comparatively.