• Title/Summary/Keyword: flood control method

Search Result 231, Processing Time 0.018 seconds

A study for the target water level of the dam for flood control (댐 홍수조절을 위한 목표수위 산정연구)

  • Kwak, Jaewon
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.7
    • /
    • pp.545-552
    • /
    • 2021
  • The burden of flood control on the dam under frequently flood due to climate change and especially heavy flood in 2020 year are come to the forward and increased. The objective of the study is therefore to establish the method to estimate capacity and target water level for flood control in actual dam management. Frequency matching method was applied to establish a pair of cumulative distribution function (CDF) based on daily dam inflow and discharge records. The relationship between dam storage and discharge volume represented as a percentage of inflow volume was derived and its characteristics was analyzed. As the result, the Soyanggang (45%) and Chungju Dam (39%) contributing to flood control with temporarily storing flood runoff. The method and diagram to estimate flood control capacity and target water level for flood control in the dam were established. The result of the study could be used as a supplementary data for flood control of the dam according to the rainfall prediction on the Korea Meteorological Administration.

Flood control analysis of the sea dike at estuary. (하구방조제의 홍수조절 해석)

  • 서승덕
    • Water for future
    • /
    • v.10 no.2
    • /
    • pp.113-124
    • /
    • 1977
  • Alone the southwesten coast of Korean peninsula, the extensive available arable acreages suited for forming are found in the development of tidal flats in the geographically curved bays with a motable tidal emplitude. It was found that the developments of these tidal flats cover an estimated area more than 276,000ha. In this paper, a flood control system by Pul's Storage Indication Method and Pul's Graphical Method at Return Periods-50 yrs, design rainfall-267mm per 48hrs and design flood-926c.m.s. and at 0.2meter control height above the High Water Ordinary Spring Tide Level (+11.0m) was studied. At the result, the flood demage in the reservoir at Return Periods-50 yrs and the tidal level at H.W.O.S.T.L. were satisfied to the below E.L. 11.20m (Flood Level in the reservoir). Well skilled flood control technique and management and control of draining sluice gate should be required for the disaster prevention from the flood and tide damage.

  • PDF

Improvement and evaluation of flood control safety utilizing a flood risk map - Yeong-Seomjin River Basin - (홍수위험지도를 활용한 치수안전도 방법 개선 및 평가 - 영·섬진강 유역중심으로 -)

  • Eo, Gyu;Lee, Sung Hyun;Lim In Gyu;Lee, Gyu Won;Kim, Ji Sung
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.1
    • /
    • pp.21-33
    • /
    • 2024
  • Recently, the patterns of climate change-induced disasters have become more diverse and extensive. To develop an effective flood control plan, Korea has incorporated the concept of Potential Flood Damage (PFD) into the Long-Term Comprehensive Water Resources Plan to assess flood risk. However, concerns regarding the PFD have prompted numerous studies. Previous research primarily focused on modifying and augmenting the PFD index or introducing new indices. This study aims to enhance the existing flood control safety evaluation method by utilizing a flood risk map that incorporates risk indices, specifically focusing on the Yeong-Seomjin river basin. The study introduces three main evaluation approaches: risk and potential analysis, PFD and flood management level analysis, and flood control safety evaluation. The proposed improved evaluation method is expected to be instrumental in evaluating various flood control safety measures and formulating flood control plans.

Reservoir Operation at Flood Time by Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) (저수지 홍수변환법에 의한 홍수시 저수지 운영)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.105-113
    • /
    • 1998
  • Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This study is concerned with reservoir operation and discusses general reservoir operation at flood time. Flood control has problems such as the uncertainty of hydrologic models. technical limitations and some constraints. Therefore, we may prepare the quantitative flood control methods based on the assured flood control storage for reservoir operation. Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) is a procedure which determines the adequate releases with considering dam safety for flood inflows over non-damaging discharge. Based on the TRF ROM which was explained in our published paper. the study discusses the TRF ROM with additional investigations and the general reservoir operation rules at flood time.

  • PDF

Determination of Flood-limited Water Levels of Agricultural Reservoirs Considering Irrigation and Flood Control (농업용 저수지의 이·치수 기능을 고려한 홍수기 제한수위 설정 기법 개발)

  • Kim, Jihye;Kwak, Jihye;Jun, Sang Min;Lee, Sunghack;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.6
    • /
    • pp.23-35
    • /
    • 2023
  • In this study, we developed a method to determine the flood-limited water levels of agricultural reservoirs, considering both their irrigation and flood control functions. Irrigation safety and flood safety indices were defined to be applied to various reservoirs, allowing for a comprehensive assessment of the irrigation and flood control properties. Seasonal flood-limited water level scenarios were established to represent the temporal characteristics of rainfall and agricultural water supply and the safety indices were analyzed according to these scenarios. The optimal scenarios were derived using a schematic solution based on Pareto front analysis. The method was applied to Obong, Yedang, and Myogok reservoirs, and the results showed that the characteristics of each reservoir were well represented in the safety indices. The irrigation safety of Obong reservoir was found to be significantly influenced by the late-stage flood-limited water level, while those of Yedang and Myogok reservoir were primarily affected by the early and mid-stage flood-limited water levels. The values of irrigation safety and flood safety indices for each scenario were plotted as points on the coordinate plane, and the optimal flood-limited water levels were selected from the Pareto front. The storage ratio of the optimal flood-limited water levels for the early, mid, and late stages were 65-70%, 70%, and 75% for Obong reservoir, 75%, 70-75%, and 65-70% for Yedang reservoir, and 75-80%, 70%, and 50% for Myogok reservoir. We expect that the method developed in this study will facilitate efficient reservoir operations.

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Optimal Flood Control Volume in the Irrigation Reservoir (관개저수지의 적정 홍수조절용량 설정방법)

  • 김태철;문종필;민진우;이훈구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.2
    • /
    • pp.81-91
    • /
    • 1998
  • Water level of irrigation reservoir during the flood season could be kept to a certain level, so called, flood control level by releasing the flood inflow in advance in order to reduce the peak discharge of next coming flood and the damage of inundation. Concept of restriction intensity of water supply was introduced to evaluate the influence of flood control volume on the irrigation water supply. Restriction intensity can be calculated by multiplying the ratio of restriction to the days of restriction which are obtained from the operation rule curve and daily water level of irrigation reservoir and it has the dimension of % day. The method of restriction intensity was applied to the Yedang irrigation reservoir with the observed data of 30 years to review whether the present flood control volume is reasonable or not, and suggest the optimal flood control volume, if possible.

  • PDF

A study for flood control method of Sumjingang Dam considering dam operation constraints (댐 운영 제약사항을 고려한 섬진강댐 홍수조절방식에 관한 연구)

  • Lee, Yongtaek;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.4
    • /
    • pp.249-261
    • /
    • 2024
  • Climate change has intensified the severity of extreme floods, presenting substantial challenges to dam management and operation. Traditionally, flood control strategies for dam operations have been based on theoretical scenarios, such as designed floods, without taking into account downstream conditions. However, in practice, managing floods involves operating dams based on climate forecasts. This strategy encounters challenges due to the limited predictability of climate forecasts, which in turn leads to uncertainty in decisionmaking among dam managers. This study proposes a flood control approach for dam operations that involves gradually increasing the outflow, considering the operational constraints and potential downstream damage, based on inflow data. The effectiveness of this method was assessed through simulation, employing both a designed flood and data from the most significant historical flood. The dam operation strategy for flood control presented in this study provides a framework for dam operators, facilitating consistent decisionmaking in flood management by integrating realistic dam operational conditions.

A Study on the Behavior of Floating Debris in a Flood Control Dam Using the Lagrangian Particle Traking Method (라그랑지안 입자 추적기법을 이용한 홍수조절용댐 내 부유쓰레기 거동 모의에 관한 연구)

  • Jang, Suk-Hwan;Oh, Kyoung-Doo;Oh, Ji-Hwan
    • Journal of Environmental Science International
    • /
    • v.25 no.9
    • /
    • pp.1253-1267
    • /
    • 2016
  • After large-scale flooding damage occurred along the Imjin river in 1996, 1998, and 1999, the Hantan river flood control dam was planned, and it has since been under construction. Unlike existing dams in Korea, the Hantan river flood control dam will remain fully open except during high floods, when the dam will store flood water temporarily to reduce flood peaks and flood water volume downstream. During past flooding seasons, floating debris has caused difficulties in the management of large-scale dams. Most of the existing multipurpose dams in Korea have installed nets to collect floating debris based on many years of experience with and data about inflow and distribution of floating debris in the dams. For the Hantan river flood control dam, however, collection of data about inflow and distribution of floating debris is not possible as the dam is located near the border area between North and South Korea. In order to devise a preliminary plan to collect floating debris in the Hantan river flood control dam, an EFDC hydrodynamic model was used to analyze the behavior of floating debris during high floods. The Lagrangian particle tracking method was utilized to simulate the behavior of floating debris in the dam. Based on the analysis of paths and final destinations of the particles, seven collection points were selected where it seemed to be effective to collect floating debris, as debris is likely to accumulate there in high density.

Development of Storage Management Method for Effective Operation of Small Dams (소규모 댐의 효과적 운영을 위한 저수관리 기법 개발)

  • Kim Phil-Shik;Kim Sun-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.2
    • /
    • pp.27-35
    • /
    • 2006
  • Large dams are managed with operation standard and flood forecasting systems, while small dams do not have management method generally. Shortage of water resources and natural disasters due to drought and flood raised public concerns for management of small dams. Most of small dams are irrigation dams, which need diversified water uses. However, the lack of systematic management of small dams have caused serious water wastage and increased natural disasters. Storage management method and system were developed to solve these problems in small dams. The system was applied to Seongju dam for effective management. The storage management method was established considering hydrology simulation and statistical analysis using the system. This method can bring additional available water, even in the same conditions of the water demand and the supply conditions of watershed. It can improve the flood control capacity and water utilization efficiency by' the flexible operation of storage space.