• Title/Summary/Keyword: flood control effects

Search Result 109, Processing Time 0.028 seconds

Analysis of Flood Control Effects of Heightening of Agricultural Reservoir Dam (농업용 저수지 증고에 따른 홍수조절효과 분석)

  • Lee, Gwan Jae;Park, Ki Wook;Jung, Young Hun;Jung, In Kyun;Jung, Kwang Wook;Jeon, Ji Hong;Lee, Ji Min;Lim, Kyoung Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.4
    • /
    • pp.83-93
    • /
    • 2013
  • Annual average precipitation of Korea is 1,277 mm and around 2/3 of annual precipitation and 74 % of available water resources occurred during monsoon period. In recent years, many agricultural reservoirs have been heightened to increase flood control capacity, reduce flooding damage at downstream areas, and provide sustainable environmental flow during drought period. Thus in this study, the flood control effects of heightening of reservoir banks were simulated with HEC-ResSim and HEC-RAS models. These modes were applied to Bonghak reservoir and it was found that flood control effects were 3~4.5 % with 7 -m heightening. Also, with proper operation (1 m lower of full water level) of reservoir right before the monsoon period, flooding at downstream could be prevented even with design storm of 80 -year recurrence interval. As shown in this study, heightening of agricultural reservoir provides positive effects in flood control and flood damage reduction.

Flood Effects Analysis of Reservoir Basin through the Linkage of HEC-HMS and HEC-RAS Models (HEC-HMS와 HEC-RAS모형의 연계에 의한 댐 유역의 홍수영향 분석)

  • Lee, Weon-Hee;Kim , Sun-Joo;Kim , Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.2
    • /
    • pp.15-25
    • /
    • 2004
  • For the effective operation of irrigation reservoirs, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. In this study, the flood effective analysis system was developed through the integration of long-term water budget analysis model, GIS-based HEC-HMS model and HEC-RAS model. The system structure consists of long-term water budget model using modified TANK theory, flood runoff and flood effects analysis model using HEC-GeoHMS, HEC-HMS and HEC-RAS models. The flood effects analysis system simulated the flood runoff from the upstream, downstream flood and long-term runoff of the watershed using the observed data collected from 1998 to 2002 of Seongju dam. The simulated results were reasonably good compared with the observed data. The optimal management method of the reservoir during the whole season is suggested in this study, and the flood analysis system can be a useful tool to evaluate a reservoir operation quantitatively for the mitigation of flood damages of reservoir basin.

Development of Flood Control Effect Index by Using Fuzzy Set Theory (Fuzzy 집합 이론을 이용한 홍수조절효과 정량화 지표 개발)

  • Kim, Juuk;Choi, Changwon;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5B
    • /
    • pp.415-429
    • /
    • 2011
  • Quantitative evaluation indexes for flood control effect of a multi-purpose reservoir used widely in Korea are the discharge control rate, reservoir release rate, reservoir storage rate, and flood control storage utilization rate. Because these indexes usually use and compare inflow, release, and storage data directly, the uncertainties included in these data are not considered in evaluation process, and the downstream flood control effects are not assessed properly. Also, since the acceptable partial failure in a design of water resources system is not considered, the development of a new flood control effect evaluation index is required. Fuzzy set theory is therefore applied to the development of the index in order to consider the data uncertainty, the downstream flood control effect, and the acceptable partial failure. In this study, the flood control effect of a multi-purpose reservoir is evaluated using the flood control effect index developed by applying fuzzy set theory. The Chungju reservoir basin was selected as a study basin and the storm events of July, 2006 are used to study the applicability of the developed index. The related factors for flood control effect are fuzzified, the acceptable failure region is divided from the system state to evaluate the flood control effect using developed flood control effect index. The flood control effect index were calculated by applying to the study basin and storm events. The results show that the developed index can represent the flood control effect of a reservoir more realistically and objectively than the existing index.

Study of a Process for Flood Detention Location and Storage Capacity (재해저류지 위치결정과 용량결정 과정에 관한 연구)

  • Oh, Gun-Heung;Park, Ki-Bum;Chang, In-Soo
    • Journal of Environmental Science International
    • /
    • v.17 no.6
    • /
    • pp.601-609
    • /
    • 2008
  • In this study for the development of area due to the increasing of industry, population and spreading of urbanization is rapidly increasing but about seventy percent of our nation's areas consists of the mountainous districts. In such case, when those areas have the heavy rains break, they are washed away by a fast-flowing stream of a valley and overflowed. Thus it could result on human life and property damage and also the widespread of flood damage in the downstream area. To decrease those damage, the construction of flood control reservoir is necessary. This research was aim to construct the flood runoff models of a mountainous small district and to determine the probability rainfall by analyzing precipitation. The study also examined the effects of location and size of flood control reservoir on flood reduction. The result showed that the construction of detention basin was an effective way to ensure the safety of flood control and multiple detention basin had superior result for reducing amount of runoff in the down stream area than the single detention basin.

Preliminary Release Scheme by Flood Forecasting (홍수예측에 의한 예비방유 방안)

  • Sim, Myeong-Pil;Lee, Jae-Hyeong;Gwon, O-Ik
    • Water for future
    • /
    • v.29 no.1
    • /
    • pp.235-248
    • /
    • 1996
  • Apreliminary release scheme (PRS) is suggested for the operating rules during flood period to deal with conflicts between flood control and water conservation purposes. PRS can be used to decide the optimum releases, based on the forecast of an oncoming flood and flow rate at the control point downstream when comparing the variable restricted water level (VRWL) for flood control with the minimum required water level (MRWL) for conservation use. The model is applied to Chungju and Daechung reservoirs through simulations of the technique. This study illustrates the procedure to decide the time and size for preliminary releases. Also, effects of duration and magnitude of preliminary release are reviewed based on historicqal flood records. The simulation results indicate that the proposed PRS is effective for the managers to find optimal operating policies during flood period. The proposed scheme can be used with main release scheme using real-time operation on hour-to-hour basis to decide the release for a flood.

  • PDF

Effect of Chungju Dam Operation for Flood Control in the Upper Han River (충주댐 방류에 따른 댐 상하류 홍수위 영향 분석)

  • Kim, Sang Ho;Kim, Ji-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.537-548
    • /
    • 2013
  • In this study, the hydraulic channel routing model was constructed to analysis the effect of flood control with the operation of Chungju Dam for 2006 flood. Study area was divided with up- and downstream of Chungju Dam in the upper Han River of Paldang Dam. The model was calibrated and verified for the flood event of 1995-2008. The effects of flood control of Chungju Dam were compared with the simulation results without the dam, and the rising effects of stage in the main observation stations were analyzed by the variation of released dam discharge. Consequently, the operation of Chungju Dam for 2006 flood was performed properly, but the effects of flood control of Chungju Dam were so focused in downstream of the dam that institutional complement was demanded to reduce the flood damage in the upper region of the dam. The limit of decision rule of downstream stage in the backwater region of dam was analyzed to solve the problem, and the decision rule of downstream stage was proposed to consider the discontinuity between the backwater region of dam and the design flood of upper stream. The proposed rule will be used to design the reduction of flood damage in upper stream of dam and to apply the analysis of region for flood damage.

Dam Effects on Spatial Extension of Flood Discharge Data and Flood Reduction Scale II (홍수 유출자료의 공간확장과 홍수저감효과에 대한 댐 영향 분석 II)

  • Jung, Yong;Kim, Nam Won;Lee, Jeong Eun
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.221-231
    • /
    • 2015
  • This is a continuous study on the dam effects for the spatial extension of flood data. In this study, flood reduction rates of dams and their influences on downstream using the spatially extended flood data were implemented. Nam-Han River was selected for measuring the impacts of ChoongJu and HoangSung dams. In the evaluations of flood reduction rate at dams, the larger flood events have the lower flood reduction rates for both dams. At the YeoJoo water level station, the analyses of the relations between flood reduction rates and the sizes of watersheds dams located were performed. the sizes of watersheds having a functional dam have highly influenced on the reduction rates of flood. The average of flood reduction rates was smaller than the area rate. For instances, area rates of HoangSung (0.02) and ChoongJu dams (0.6) are larger than the average flood reduction rates for HoangSung (0.01) and ChoongJu dams (0.51), respectively. However, the water level station follows the dam flood reduction characteristics of dams themselves. The spatial effects of dam flood reductions are analyzed based on the three water level stations (GangChun, YeoJoo, YangPyung). The distance of flood reduction rates lower than 0.1 as average flood reduction rate was the area 7 times of watershed having a dam with 0.02 as a minimum reduction rate.

Effectiveness Analysis of Constructed Washland : (1) Flood Control and Ecological Effect (천변저류지 조성에 따른 효과분석 : (1) 홍수조절 및 생태적인 효과)

  • Kwak, Jae Won;Kim, Jae Guen;Kim, Hung Soo;Yoo, Byung Kook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1B
    • /
    • pp.13-21
    • /
    • 2010
  • In recent, we have a growing interest in the washland construction as a measure of flood control and as a wetland with ecological function in the river. This study performed the flood control analysis and investigated the ecological effect for washland construction plan in Topyoung-cheon basin in Changyeong-gun, Gyeongnam. Several cases were considered for the washland construction on Topyoung-cheon basin, and we analyzed flood stage reduction and flood inundation for each case. From the result of flood control analysis, we found some significant results according to the combination of each washland case. We also found that the washland construction gave the positive results in biodiversity. Therefore, it will be desirable to consider various effects such as flood control, ecological aspects, and so on for the washland construction.

Effects of Agricultural Reservoir Rehabilitation on their Flood Control Capacities (농업용 저수지 둑 높이기에 따른 홍수조절효과 분석)

  • Jun, Sang Min;Kang, Moon Seong;Song, Inhong;Hwang, Soon Ho;Kim, Kyeung;Park, Jihoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.57-68
    • /
    • 2013
  • About 74 % of reservoirs in Korea are older than 40 years and their storage capacities have been decreased substantially. As part of reservoir reinforcement, the dam heightening project has been ongoing for about 110 reservoirs. The main purpose of the dam heightening project is to secure additional environmental water, while improving flood control capacity by gaining additional storage volume. The objective of this study was to evaluate reservoir flood control capacity changes of dam heightening reservoirs for effective management of additional storage volume. In this study, 13 reservoirs were selected for reservoir simulation of 200 year return period floods. Rainfall data of 1981-2100 were collected and divided into 4 periods (1981-2010; 1995s, 2011-2040; 2025s, 2041-2070; 2055s, 2071-2100; 2085s). Probability rainfalls and 200yr design floods of each period were calculated using FARD2006 and HEC-HMS. Design floods were used as inputs of each reservoir simulation using HEC-5. Overall, future probability rainfalls and design floods tend to increase above the past 1995s. Control ratios were calculated to evaluate flood control capacities of reservoirs. As a result, average flood control ratios were increased from 32.6 % to 44.2 % after dam heightening. Control ratios were increased by 12.7 % (1995s), 12.4 % (2025s), 10.3 % (2055s) and 10.9 % (2085s). The result of this study can be used as a basis for establishing the reservoir management structure in the future.

Panel Data Analysis between Flood Damage and Recovery Cost (Panel Data 분석을 통한 홍수피해와 복구비 관계분석)

  • Park, Doo-Ho;Kim, Sun-Young
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • This paper addresses the correlation between the flood damage cost and recovery cost. National data (15 regions) for 20 years, panel data, has been analyzed for this test. Model specification of panel data analysis depends on the characteristics of data set and "fixed" or "random" effects model can be used. The results are represented in both models. As we expected all independent variables show positive relationship with recovery cost, except for the number of death and suffers. The damage of public facilities, such as rivers and road are the major factors on the damage and recovery cost, which means that flood damage can not be decreased without decreasing damages of public facilities from floods. Especially, the recovery cost is always higher than the damage cost and investment for flood control. Unlikely, government investment for flood control is the highest and recovery cost is the always lower than da mage cost andinvestment in Japan. Which means that proper investment can reduce economic damage cost of flood and recovery cost.