Proceedings of the Korean Geotechical Society Conference
/
2006.10a
/
pp.46-55
/
2006
There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2004.09a
/
pp.286-289
/
2004
On site, In situ soil remediation technologies are very important among the remediation technologies and in general efficiency of these technologies are turned to site characterization and environmental condition. specially using of only one technology has so many limitation factors. for example, existing state of tailing and channeling and so on. actually, filled land have high concentration cation exchange capacity because of existence in abundance soil organic matter. Therefore we used various on site in Situ technologies by phase for overcome the limitation factors. Target site is petroleum (diesel) impacted filled land and using technologies are SVE(Soil Vapor Extraction), BV(Bioventing), Bioremediation, Soil flushing, Chemical oxidation.
Proceedings of the Earthquake Engineering Society of Korea Conference
/
1999.04a
/
pp.69-76
/
1999
Because of the limited land in Korea most of the projects require large-scale reclamation. The hydraulic-filled soil deposits are usually loose and susceptible to be liquified during earthquake. The dynamic deformation characteristics which expressed by shear modulus and damping ratio are important to analyze the earthquake ground motion. In this paper resonant column tests were performed on five hydraulic filled soil in Korea and the deformational characteristics at both small and medium strains were investigated. The coefficients in the Hardin equation to predict the representative maximum shear modulus and modulus reduction cure are also proposed.
Lee Jang Hwan;Kim Young Joo;Joung Kwang Sik;Kang Tea Kyung;Jung Keun Ho;Jung Sang Jin
Proceedings of the Korea Concrete Institute Conference
/
2004.05a
/
pp.454-457
/
2004
Due to social problems such as the increasing of land price and the expanding of city, buildings require more complex and bigger components and structure. However, the complex and massive building projects need new technology to solve effect of local buckling and the needs for more space. Hence, Concrete Filled Tube Steel (CFT), the tube steel to hold concrete during pouring and curing of concrete procedure, which helps to reduce local buckling and space, was developed. Most researches on CFT might not be focused on the characteristic of concrete 'filled in tube but structural analysis. However, it is the essential factor to increase the strength of concrete on CFT for having efficient results. Therefore, this paper will describe how to apply CFT into the construction site through examining High Strength Concrete $(800kg/cm^2)$, the strength of core, and bleeding during pouring strategy.
Proceedings of the Korean Institute of Building Construction Conference
/
2001.11a
/
pp.163-168
/
2001
This study examinated the application in construction field and the development of waterproofing material system by the spray water-soluble rubber asphalt to solve the problems of synthetic polymer sheet and gio membrane(A mat sheet of Bentonite) that had been used domestic waterproofing material in advance. As the result of study, characters of study water-souble rubber asphalt are the follows; 1) The amount of water absorption was '0.06'g and the seepage quantity was '0'g in result. 2) The tensile strength was about 30.7kgf/$cm^2$ and the elongation was about 72.4% in result. 3) After reliance of temperature test had been ended, the tensile strength was about 72.4kg/$cm^2$ in low temperature and about 30.7kgf/$cm^2$ in normal temperature. 4) After acid and alkaline treatment had been ended, the tensile strength was about 19.7kgf/$cm^2$ and about 21.9kgf/$cm^2$ in result. 5) After chlorine ion treatment had been ended, the tensile strength was 28.5kgf/$cm^2$ and the elongation was 250% in result. So, this study can propose the spray water-soluble rubber asphalt to satisfy the security and durability of waste filled land.
In order to measure the Radionuclides and Concentration, the directly grinded land samples (river soil, pine leaves and mugwort) among the environment samples around the nuclear power plant were filled in a 450 mL Marinelli beaker and weighed to obtain the dry mass ratio of the samples. Then the background and land samples were measured for 80,000 sec. The analysis of the collected land samples showed that most of them contained less radiation nuclide than the detection minimum limit in the 'Ministry of Education, Science and Technology Public Notice No. 2010-32.'In others, the natural radionuclides $^{40}K$ were detected. Of the products of nuclear reaction discharged by a nuclear reaction, $^{134}Cs$ and $^{137}Cs$ are more easily detected, and their discharge sources can be traced using the relative ratio. Although the radioactive concentration in the vicinity of Kori Nuclear Power Plant, which is more than 1,100km away from Fukushima, the Japanese nuclear accident site, continuous monitoring is needed as the radionuclides can still be accumulated in the soil or animals and plants.
Journal of the Korean Society of Environmental Restoration Technology
/
v.4
no.4
/
pp.12-18
/
2001
This study was carried out to analyze physico-chemical properties of soils at the ground of landscape planting in reclaimed land from the sea on Kwangyang Bay, South Korea. Physico-chemical properties of soils at each planting grounds were tested by ANOVA and were significantly(P<0.01) different. The difference came from the soil properties of the covered soil, the disturbance applied to the soil with land use and the accumulation of organic matter after landscape planting. Soil hardness, pH, ECe, Na and K level were in a stable condition at high then low of ground height for landscape planting. Organic matter accumulation was greater at lower planting grounds then top and slope ground of big mounding. The planting grounds of favorable growth for landscape trees were determined as following order : the slope ground and the top ground of big mounding>the ground of medium mounding>the coved ground of improve soil>the lower ground of big mounding>the filled ground of improve soil.
Journal of the Korean Institute of Landscape Architecture
/
v.33
no.6
s.113
/
pp.40-50
/
2006
This study was carried out to examine the tree-ring growth characteristics of Zelkova serrata Makino after replanting, for the built-up planting founds for stability of landscaped trees in the reclaimed land from the sea. the factors, many affecting the growths of Zelkova serrata Makino, were the replanting stress and drought. The growth reduction due to replanting and drought occurred in the replanting year and the following year. The mean sensitivity(year-to-year variation) and the coefficient of variation(tree-to-tree variation in a certain year) in tree rings of Zelkova serrate Makino, were higher in the poor soil sites than in the favourable soil ones. And the poor soil sites were the filled ground of improve soil and the covered ground of improve soil and the top ground of big mounding than mounding ground sites, especially soil hardness, alkali soil, high $Na^+\;and\;K^+,\;low\;Ca^{++}\;and\;Mg^{++}$ and T-C were the most crucial. We suggest technique development of the built-up planting ground for stability in the reclaimed land from the sea. The built-up planting grounds in reclaimed land from the sea, should be considered for the use of fair soil with the physical and chemical soil properties, -high level foundation of planting ground, and the prevention of disturbed soil-.
Proceedings of the Korean Geotechical Society Conference
/
2000.11a
/
pp.177-184
/
2000
Geotube is a tube made of geotextile and hydraulically filled with dredged soil. This technological method has been widely used in the advanced countries of the world to build the shore protection embankment. The dredged contaminated sediments from the lake, river, and harbor can be pumped into the geotube by using the hydraulic pump. So, environments effects can be minimized and enhanced by using this method. This paper presents a field test result of a geotube in the land reclamation project for the Songdo New City construction site. The dredged silty clay was dredged by the dredging ship and hydraulically pumped into the geotube. The height of geotube was measured at every filling stage and also measured width and diameter of geotube with the elapsed time. The unit weight of soil and undrained shear strength of filled soil in a tube were measured at the various locations and heights of geotube with the elapsed time. Geotube technique can be effectively implemented for the silty clayey soil with using the dredging ship.
Journal of The Korean Society of Agricultural Engineers
/
v.47
no.1
/
pp.71-77
/
2005
Recycling of reclaimed concrete (RC) is very important in the management of construction and demolition wastes. Most of RC is utilized for land-filling after crushing in this country. In this study, a series of elution experiments were conducted to investigate the type and amount of pollutants released from the crushed RC. Most water quality parameters including heavy metals and some organic compounds were below standards for drinking water. Some of heavy metals such as As, Cd, Pb, Hg were detected in 0.5 N H2S04 solution after 24-hour immersing RC, which was conducted for evaluating a long term release effect. The concentration of the heavy metals were higher than the drinking water standards. The results also showed significant adsorption of heavy metals by crushed Re. Potential risks, based on the result of this study were not high in using crushed RC for land-filling. Appropriate management of RC would reduce the risk, for example the separation of hazardous materials from construction wastes. Long term evaluations for the sites of land filled with RC would be required to assess the environmental impacts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.