• Title/Summary/Keyword: field load test

Search Result 883, Processing Time 0.032 seconds

Analysis of Skin Friction Behavior in Prebored and Precast Piles Based on Field Loading Test (재하시험을 통한 매입말뚝의 주면마찰력 거동 분석)

  • Jung, Gyoung-Ja;Kim, Do-Hyun;Lee, Chul-Ju;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.1
    • /
    • pp.31-38
    • /
    • 2017
  • Skin friction of prebored and precast pile may be one of the most critical factors affecting the bearing capacity and settlement. Special attention was given to the interface behavior of pile-cement milk-surrounding soil when the load is acting on the prebored and precast pile. The cases of single pile were analyzed through a three-dimensional finite element approach and pile loading tests. A series of numerical analyses of the interface of pile-cement milk-soil was conducted with the proposed t-z curve and field measurements. It is shown that the use of cement milk around the pile increases the skin friction and reduces the pile settlement. It is also known that the suggested t-z curve between the cement milk and the soil, enhances the accuracy of the numerical analysis results.

Effectiveness of Reinforcement for Transitional Zone between Tunnel and Earthwork Using the Large Sleeper (대형침목을 이용한 터널/토공 접속구간의 보강효과)

  • Choi, Chan-Yong;Lee, Jin-Wook;Kim, Hun-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.214-221
    • /
    • 2010
  • The transitional zone between tunnel and earthwork is one of the most vulnerable areas site for railway lines and because of differential settlement due to different stiffness of each supporting layer, it has to conducted a maintenance work constantly. In this study, it is conducted to compare the effect of reinforcement by wheel load and displacement of the sleepers after existing sleepers are replaced with the large sleepers for 20m long in-field transitional zone. Also, numerical parametric study using multi-layer elastic method has been performed to compare rail force, settlement and stresses of ballast while varying size and space of the sleeper. The field test and numerical results show that replacing the large sleepers improves about 10% of total settlement and coefficient of wheel force than conventional sleepers. Effectiveness of improvement is about 9.3%, 4%, 14.5% for rail seat force, settlement of sleepers and ballast pressure respectively with size of sleepers.

Long-Term Performance Evaluation of a GFRP Slab Bridge (GFRP 슬래브 교량의 장기성능 평가)

  • Ji, Hyo-Seon
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.3
    • /
    • pp.349-360
    • /
    • 2012
  • This paper describes a detailed assessment of the structural safety, serviceability, capacity rating and long-term performance of a glass fiber-reinforced polymer (GFRP) slab bridge superstructure. This first all-GFRP slab bridge was installed in Korea on May 2002. The GFRP slab bridge is a simply supported, its length is 10.0 m, and is designed to carry two-lane traffic and has an overall width of 8.0m. The GFRP slab bridge is a sandwich structure with a corrugated core, fabricated by hand lay-up process with E-glass fibers and vinyl ester resins. The assessment of long-term performance for the GFRP slab bridge in 2004, 2011 includes a field load testing identical to that performed in 2002. The assessment indicates that the GFRP slab bridge has no structural problems and is structurally performing well in-service as expected. The assessment may provide a baseline data for the capacity ratings assessment of the GFRP slab bridge and also serve as part of a long-term performance of all-GFRP bridge superstructure.

Case History Evaluation of Axial Behavior of Micropiles (소구경말뚝의 축방향 거동에 대한 사례 연구)

  • Jeon Sang-Soo
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.25-32
    • /
    • 2004
  • This paper examines the results of full-scale field tests on micropiles and side resistance is evaluated with respect to axial displacements and soil properties. Both cohesive and cohesionless soils are included in this evaluation. For all practical purposes, the developed load-displacement relationship and the geotechnical soil properties for each micropile and soil type can be used to represent the available data well through normalized average values and empirical correlations. There is a significant difference in load-carrying capacity between micropiles and drilled shafts that results primarily from the micropile pressure-grouting installation effects on the state of stress in the ground. The results show that micropiles can have a significant increase of capacity over larger-diameter drilled shafts at shallower depths with D/B < 100 or so. In cohesive soils, the typical increase is on the order of 1.5 with values as high as 2.5. For cohesionless soils, the typical increases are in the range of 1.5 to 2.5 with values as high as 6.

A Study on the Behaviour of Prebored and Precast Steel Pipe Piles from Full-Scale Field Tests and Class-A and C1 Type Numerical Analyses (현장시험과 Class-A 및 C1 type 수치해석을 통한 강관매입말뚝의 거동에 대한 연구)

  • Kim, Sung-Hee;Jung, Gyoung-Ja;Jeong, Sang-Seom;Jeon, Young-Jin;Kim, Jeong-Sub;Lee, Cheol-Ju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.7
    • /
    • pp.37-47
    • /
    • 2017
  • In this study, a series of full-scale field tests on prebored and precast steel pipe piles and the corresponding numerical analysis have been conducted in order to study the characteristics of pile load-settlement relations and shear stress transfer at the pile-soil interface. Dynamic pile load tests (EOID and restrike) have been performed on the piles and the estimated design pile loads from EOID and restrike tests were analysed. Class-A type numerical analyses conducted prior to the pile loading tests were 56~105%, 65~121% and 38~142% respectively of those obtained from static load tests. In addition, design loads estimated from the restrike tests indicate increases of 12~60% compared to those estimated in the EOID tests. The EOID tests show large end bearing capacity while the restrike tests demonstrate increased skin friction. When impact energy is insufficient during the restrike tests, the end bearing capacity may be underestimated. It has been found that total pile capacity would be reasonably estimated if skin friction from the restrike tests and end bearing capacity from the EOID are combined. The load-settlement relation measured from the static pile load tests and estimated from the numerical modelling is in general agreement until yielding occurs, after which results from the numerical analyses substantially deviated away from those obtained from the static load tests. The measured pile behaviour from the static load tests shows somewhat similar behaviour of perfectly-elastic plastic materials after yielding with a small increase in the pile load, while the numerical analyses demonstrates a gradual increase in the pile load associated with strain hardening approaching ultimate pile load. It has been discussed that the load-settlement relation mainly depends upon the stiffness of the ground, whilst the shear transfer mechanism depends on shear strength parameters.

Strength analysis of the driving shift gears for a 67 kW class agricultural tractor according to tire type

  • Baek, Seung Min;Kim, Wan Soo;Kim, Yeon Soo;Baek, Seung Yun;Lee, Nam Gyu;Moon, Seok Pyo;Jeon, Hyeon Ho;Choi, Young Soo;Kim, Taek Jin;Kim, Yong Joo
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.1147-1158
    • /
    • 2020
  • The purpose of this study was to measure the engine torque and rotational speed of a 67 kW class agricultural tractor according to tire type during plow tillage and to analyze the gear strength of the driving shift for the tractor. A field test was performed under the condition with a single tire (Test A) and dual tires (Test B) to increase the ground width of the rear tires. A load monitoring system was developed, and the engine torque and rotational speed were measured using controller area network (CAN) communication. The engine torque and rotational speed during plow tillage were calculated as the equivalent torque and speed using Palmgren Miner's rule. As a result, the equivalent torque and speed in Test A and Test B were 181.0 Nm and 1,913 rpm and 206.1 Nm and 2,130 rpm, respectively. As the ground width of the rear tire was increased, the bending stress in Test B was about 9.9 to 10.5% higher than that of the Test A, and the contact stress was about 4.6 to 4.9% higher than that of the Test A. Under all conditions, the safety factor for the bending and contact stress was 1 or more. Thus, the driving shift gears for the dual tire type are considered safe.

Settlement Data Acquisition and Analysis Technique by Personal Computer (Personal Computer를 이용한 침하 안정 관리기법)

  • 송정락;여유현
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.332-347
    • /
    • 1991
  • Accurate prediction of future settlement is essential for the settlement control of soft soil by pre-loading method. To predict future settlement in clayey soft soils, several methods like Asaoka method, Hyperbolic Method and Hoshino method are currently being used. These methods predict the future sett1ement by mathmatical treatment of the measured settlement data on the basis of consolidtion theory and empiricism. But the correlation coefficient between the measured and the predicted settlement was relatively low (0.8~0.9). Also, the prediction of future settlemet for the design load is very difficult. In this article, the measured field settlement data was treated as the the field consolidation test. Hence, condolidation coefficient(Cv) and compression index(Cc) was evaluated from the field settlement data. Cv and Cc values from field data was used to calculate the degree of consolidation and settlement at desired time. By this method, the correlation coefficent between the measured and the predicted settlement was significantly increased(0.97~0.99). Also the settlement by the design load after the improvement of soft soil could be predicted reasonably. This method is quite rational and sound but it requires thousands of calculation steps. Today, by the aid of low priced personal computers above mentioned technique could be used much acre economically and effectively than conventional methods. This article presented the mechanisms and capacities of this method and demonstrated the enhanced correlation coefficient when applied to actual field settlement data.

  • PDF

Analysis of the PTO Torque of a Transplanter by Planting Condition

  • Kim, Wan Soo;Chung, Sun Ok;Choi, Chang Hyun;Cho, Jong Seung;Choi, Dug Soon;Kim, Young Joo;Lee, Sang Dae;Hong, Soon Jung;Kim, Yong Joo;Koo, Seung Mo
    • Journal of Biosystems Engineering
    • /
    • v.41 no.4
    • /
    • pp.313-318
    • /
    • 2016
  • Purpose: This study measured and analyzed the PTO (power take off) torque of a transplanter according to the planting conditions during field operation. Methods: A torque measurement system was constructed with torque sensors to measure the torque of a PTO shaft, a measurement device to acquire sensor signals, and a power controller to provide power for a laptop computer. The field operation was conducted at four planting distances (26, 35, 43, and 80 cm) and two planting depths using the transplanter on a field with similar soil conditions. One-way ANOVA with planting distance and Duncan's multiple range test at a significance level of 0.05 were used to analyze the PTO torque. The torque ratio was calculated based on the minimum torque using the average PTO torque measured under each planting condition. Results: The average torques on the PTO shaft for planting distances of 26, 35, 43, and 80 cm at a low planting depth were 11.05, 9.07, 7.04, and 3.75 Nm, respectively; the same for planting distances of 26, 35, 43, and 80 cm at a middle planting depth were 12.20, 9.86, 7.94, and 4.32 Nm, respectively. When the planting distance decreased by 43, 35, and 26 cm, the torque ratio at a low planting depth increased by 88, 142, and 195%, respectively. When the planting distance decreased by 43, 35, and 26 cm, the torque ratio at the middle planting depth increased by 84, 128, and 182%, respectively. Conclusions: PTO torque fluctuated by planting distance and depth. Moreover, the PTO torque increased for short planting distances. Therefore, farmers should determine the planting conditions of the transplanter by considering the load and durability of the machine. The results of this study provide useful information pertaining to the optimum PTO design of the transplanter considering the field load.

Analysis of a Queueing Model with a Two-stage Group-testing Policy (이단계 그룹검사를 갖는 대기행렬모형의 분석)

  • Won Seok Yang
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.53-60
    • /
    • 2022
  • In a group-testing method, instead of testing a sample, for example, blood individually, a batch of samples are pooled and tested simultaneously. If the pooled test is positive (or defective), each sample is tested individually. However, if negative (or good), the test is terminated at one pooled test because all samples in the batch are negative. This paper considers a queueing system with a two-stage group-testing policy. Samples arrive at the system according to a Poisson process. The system has a single server which starts a two-stage group test in a batch whenever the number of samples in the system reaches exactly a predetermined size. In the first stage, samples are pooled and tested simultaneously. If the pooled test is negative, the test is terminated. However, if positive, the samples are divided into two equally sized subgroups and each subgroup is applied to a group test in the second stage, respectively. The server performs pooled tests and individual tests sequentially. The testing time of a sample and a batch follow general distributions, respectively. In this paper, we derive the steady-state probability generating function of the system size at an arbitrary time, applying a bulk queuing model. In addition, we present queuing performance metrics such as the offered load, output rate, allowable input rate, and mean waiting time. In numerical examples with various prevalence rates, we show that the second-stage group-testing system can be more efficient than a one-stage group-testing system or an individual-testing system in terms of the allowable input rates and the waiting time. The two-stage group-testing system considered in this paper is very simple, so it is expected to be applicable in the field of COVID-19.

A Study on the Tolerance Band of Voltage Drop during Motor Startup for Refineries and Chemical Plants with Isolated Power Systems

  • Shin, Ho-Jeon;Cho, Man-Young;Chun, Hong-Il;Kim, Jin-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.486-493
    • /
    • 2017
  • Refineries and chemical plants with isolated power systems that have a limited power supply are more susceptible to voltage changes from disturbances compared to power systems connected with a power company. Furthermore, most loads in such cases are induction motor loads, and therefore, transient voltage characteristics when starting a high-capacity motor must be examined. In general, high-capacity motors are customized appropriately to the load performance curve by the manufacturer during the construction of an industrial plant. Subsequently, when complying with the voltage drop permitted by international standards during the design process, power supply equipment such as transformers and generators is overdesigned. Therefore, a novel analysis is necessary on standards for startup and constraint voltage drops, as well as on identifying the voltage drop limitations for starting high-capacity motors in refineries and chemical plants with isolated power systems. In this study, field tests on an industrial plant were conducted, and simulations modeled under conditions identical to those of the field test system were performed using the general-purpose program ETAP in order to compare the results.