• Title/Summary/Keyword: fault duration

Search Result 68, Processing Time 0.019 seconds

Extraction of Time-varying Failure Rate for Power Distribution System Equipment (배전계통 설비의 시변 고장률 추출)

  • Moon, Jong-Fil;Lee, Hee-Tae;Kim, Jae-Chul;Park, Chang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.11
    • /
    • pp.548-556
    • /
    • 2005
  • Reliability evaluation of power distribution system is very important to both power utilities and customers. It present the probabilistic number and duration of interruption such as failure rate, SATDI, SAIFI, and CAIDI. However, it has a fatal weakness at reliability index because of accuracy of failure rate. In this paper, the Time-varying Failure Rate(TFR) of power distribution system equipment is extracted from the recorded failure data of KEPCO(Korea Electric Power Corporation) in Korea. For TFR extraction, it is used that the fault data accumulated by KEPCO during 10 years. The TFR is approximated to bathtub curve using the exponential(random failure) and Weibull(aging failure) distribution function. In addition, Kaplan-Meier estimation is applied to TFR extraction because of incomplete failure data of KEPCO. Finally, Probability plot and regression analysis is applied. It is presented that the extracted TFR is more effective and useful than Mean Failure Rate(MfR) through the comparison between TFR and MFR

Implementation of DYLAM-3 to Core Uncovery Frequency Estimation in Mid-Loop Operation

  • Kim, Dohyoung;Chang hyun Chung;Moosung Jae
    • Nuclear Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.531-540
    • /
    • 1998
  • The DYLAM-3 code which overcomes the limitation of event tree/fault tree was applied to LOOP (Loss of Off-site Power) in the mid-loop operation employing HEPs (Human Error Probabilities) supplied by the ASEP (Accident Sequence Evaluation Program) and the SEPLOT (Systematic Evaluation Procedure for Low power/shutdown Operation Task) procedure in this study. Thus the time history of core uncovery frequency during the mid-loop operation was obtained. The sensitivity calculations in the operator's actions to prevent core uncovery under LOOP in the mid-loop operation were carried out. The analysis using the time dependent HEP was performed on the primary feed & bleed which has the most significant effect on core uncovery frequency. As the result, the increment of frequency is shown after 200 minutes duration of simulation conditions. This signifies the possibility of increment in risk after 200 minutes. The primary feed & bleed showed the greatest impact on core uncovery frequency and the recovery of the SCS (Shutdown Cooling System) showed the least impact. Therefore the efforts should be taken on the primary feed & bleed to reduce the core uncovery frequency in the mid-loop operation. And the capability of DYLAM-3 in applying to the time dependent concerns could be demonstrated.

  • PDF

Characteristic Analysis of Voltage Sags Due to Faulted Distribution Lines (배전선로 고장에 의한 Voltage Sag의 특성 해석)

  • ;Madhat M. Morcos
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.1
    • /
    • pp.76-84
    • /
    • 2002
  • Voltage sags caused by line faults in transmission and distribution lines have become one of the most important power quality problems facing industrial customers and utilities. Voltage sags are normally described by characteristics of both magnitude and duration, but phase angle shifts should be taken account in identifying sag phenomena and finding their solutions. In this paper, voltage sags due to line faults such as three phase-to-ground, single line-to-ground, and line-to-line faults are characterized by using symmetrical component analysis, for fault impedance variations. Voltage sags and their effect on the magnitude and phase angle are examined. Balanced sags of three phase-to-ground faults show that voltages and currents are changed with equivalent levels to all phases and the zero sequence components become zero. However, for unbalanced faults such as single line-to-ground and line-to-line faults, voltage sags give different magnitude variations and phase angle shifts for each phase. In order to verify the analyzed results, some simulations based on power circuit models are also discussed.

A Study on the Operating Characteristics of Molded Case Circuit Breakers according to Temperature Rise (온도상승에 따른 배선용 차단기의 동작특성에 관한 연구)

  • Jung, Da-Woon;Kim, Jae-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.8-13
    • /
    • 2015
  • Molded Case Circuit Breakers (MCCBs) are typically used to provide over current protection for electrical safety caused by short circuit faults and overloads in indoor low voltage power systems. The MCCB automatically connects and disconnects loads from the electrical source when the current reaches a value and duration that will cause an excessive. However, the MCCB sometimes is not interrupted due to a malfunction, nuisance tripping, or in a fire. Ensuring electrical safety is very important in a indoor low voltage power system. This paper presents the operating characteristics of MCCBs according to a temperature rise from room temperature to 160 degrees Celsius delivered by a radiant panel heater. The ABS 54c(rated current: 30A) of the hydraulic magnetic trip type was used in the experiments. The signals of temperature, voltage, and current were measured using the high accuracy Signal Conditioning Extensions for Instrumentation (SCXI) measurement system with the LabVIEW program manufactured by National Instruments. The operating characteristics were measured as functions of current amplitude and ramp-up rate. The MCCB tripping time decreased as a result of increasing current amplitude and ramp-up rate under a temperature rise condition, because the temperature and level of the current are directly proportional to the tripping time. Additionally, an instantaneous operation was observed after 8 times of the rated current, and the MCCB began to melt a surface temperature of around 300 degrees Celsius of. The experimental results coincided well with the operating curve.

A Level Group Streaming Technique for Interactive VOD based on P2P (P2P 기반 Interactive VOD를 위한 레벨 그룹 스트리밍 기법)

  • Kim, Jong-Gyung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.11C
    • /
    • pp.955-962
    • /
    • 2008
  • Multicast Strategy is one of the cost-saving methods in the large scale VOD environment. However, it does involve complicated problems to implement VCR-like interactions for user's convenience in the multicast streaming system under considering the limited-server and the network's bandwidth in the multicast-transmission system. Therefore, the proper solution of settling such a problem is necessary. Thus, this paper which revised P2Patching[l] proposes LGST(Level Group Streaming Technique) which supports the VCR's function through cooperation among peers with heterogeneous bandwidth under the environment of P2P. This strategy can reduce latency by improving the acceptance of server and using the bandwidth of network efficiently. And for evaluate the proposed scheme's performance, I simulated the performance of streaming delivery topology and streaming quality in comparison with P2Patching. In evaluation to service request refusal ratio and service quality according to bandwidth decrement, the result of simulation shows that proposed LGST improves about $11{\sim}18%$ of performance than P2Patching. In the test of latency recovery according to fault probability and influence of VCR function operation duration, it shows similar performance.

A Non-Periodic Synchronization Algorithm using Address Field of Point-to-Point Protocol in CDMA Mobile Network (CDMA이동망에서 점대점 프로토콜의 주소영역을 이용한 비주기적 동기 알고리즘)

  • Hong, Jin-Geun;Yun, Jeong-O;Yun, Jang-Heung;Hwang, Chan-Sik
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.26 no.8
    • /
    • pp.918-929
    • /
    • 1999
  • 동기식 스트림 암호통신 방식을 사용하는 암호통신에서는 암/복호화 과정 수행시 암호통신 과정에서 발생하는 사이클슬립으로 인해 키수열의 동기이탈 현상이 발생되고 이로 인해 오복호된 데이타를 얻게된다. 이러한 위험성을 감소하기 위한 방안으로 현재까지 암호문에 동기신호와 세션키를 주기적으로 삽입하여 동기를 이루는 주기적인 동기암호 통신방식을 사용하여 왔다. 본 논문에서는 CDMA(Cellular Division Multiple Access) 이동망에서 데이타서비스를 제공할 때 사용되는 점대점 프로토콜의 주소영역의 특성을 이용하여 단위 측정시간 동안 측정된 주소비트 정보와 플래그 패턴의 수신률을 이용하여 문턱 값보다 작은경우 동기신호와 세션키를 전송하는 비주기적인 동기방식을 사용하므로써 종래의 주기적인 동기방식으로 인한 전송효율성 저하와 주기적인 상이한 세션키 발생 및 다음 주기까지의 동기이탈 상태의 지속으로 인한 오류확산 등의 단점을 해결하였다. 제안된 알고리즘을 링크계층의 점대점 프로토콜(Point to Point Protocol)을 사용하는 CDMA 이동망에서 동기식 스트림 암호 통신방식에 적용시 동기이탈율 10-7의 환경에서 주기가 1sec인 주기적인 동기방식에서 요구되는 6.45x107비트에 비해 3.84x105비트가 소요됨으로써 전송율측면에서의 성능향상과 오복호율과 오복호 데이타 비트측면에서 성능향상을 얻었다. Abstract In the cipher system using the synchronous stream cipher system, encryption / decryption cause the synchronization loss (of key arrangement) by cycle slip, then it makes incorrect decrypted data. To lessen the risk, we have used a periodic synchronous cipher system which achieve synchronization at fixed timesteps by inserting synchronization signal and session key. In this paper, we solved the problem(fault) like the transfer efficiency drops by a periodic synchronous method, the periodic generations of different session key, and the incorrectness increases by continuing synchronization loss in next time step. They are achieved by the transfer of a non-periodic synchronous signal which carries synchronous signal and session key when it is less than the threshold value, analyzing the address field of point-to-point protocol, using the receiving rate of address bits information and flag patterns in the decision duration, in providing data services by CDMA mobile network. When the proposed algorithm is applied to the synchronous stream cipher system using point-to-point protocol, which is used data link level in CDMA mobile network, it has advanced the result in Rerror and Derror and in transmission rate, by the use of 3.84$\times$105bits, not 6.45$\times$107bits required in periodic synchronous method, having lsec time step, in slip rate 10-7.

Review of Earthquake Studies Associated with Groundwater by Korean Researchers (국내 연구진의 지하수를 이용한 지진 연구 동향 분석)

  • Yun, Sul-Min;Hamm, Se-Yeong;Cheong, Jae-Yeol;Lee, Hyun A
    • Journal of the Korean earth science society
    • /
    • v.43 no.1
    • /
    • pp.165-175
    • /
    • 2022
  • Earthquakes have occurred owing to movements on a fault since several billion years ago. Research on the relationship between earthquakes and groundwater began in the 1960s in the United States, but related works, including hydrogeochemistry research, only began in the 2010s in South Korea. In this study, domestic studies on the relationship between earthquakes and groundwater until 2021 were collected from the Web of Science and characterized by subject area (groundwater level, hydrogeochemistry, combination of the two, and others). The results showed that the number of published articles per year was positively correlated with the 2011 Tohoku earthquake, 2016 Gyeongju earthquake, and 2017 Pohang earthquake, with the maximum numbers observed in 2011, 2018, 2019, and 2020. Most studies on the relationship between earthquakes and groundwater level addressed groundwater level fluctuations in the duration of the subject earthquake, with little consideration of the precursors. Groundwater level monitoring data, as well as hydrogeochemical information and microbial communities, may contribute to a more detailed understanding of groundwater flow and chemical reactions in bedrock caused by earthquakes. Therefore, the establishment of a national groundwater monitoring network for seismic monitoring and prediction is required.

The Effect of Rainfall on the Stability of Mudstone Slope in Consideration of Collapse Record (이암 절취사면의 붕괴이력을 고려한 강우침투에 따른 안정성 분석)

  • Jeon, Byeong-Chu;Lee, Su-Gon;Kim, Young-Muk;Chung, Sung-Rae
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.2
    • /
    • pp.55-66
    • /
    • 2009
  • At the mudstone slope located on the roadside of the Seokri area in Donghae-myeon, Pohang, Gyeongsangbuk-do, this study was performed to analyze the effects of rainfall on the stability of slope through seepage analysis according to the precipitation type of the mudstone slope, referring to the actual case of slope failure. For this, precise geological survey, geophysical exploration and drilling survey for the slope where the failure occurred were performed and followed by analysis of detailed soil layer. For the section where failure surface located, the durability reduction of rocks was measured through slaking/swelling tests and the permeability was measured through in-situ permeability tests for each soil layer. In addition, the change of strength parameter and process of instability were analyzed by back analysis, using Talren 97 and Slope/W programs, in the slope. By applying different precipitation conditions to the geographical conditions of the slope that had actual failure records, the slope stability was analyzed by seepage analysis according to duration of rainfall and rise of groundwater level resulting from the flow of rainfall caused by development of geological structures and the slope surface condition.