• Title/Summary/Keyword: fast switch

Search Result 180, Processing Time 0.025 seconds

Development of 900 V Class MOSFET for Industrial Power Modules (산업 파워 모듈용 900 V MOSFET 개발)

  • Chung, Hunsuk
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.33 no.2
    • /
    • pp.109-113
    • /
    • 2020
  • A power device is a component used as a switch or rectifier in power electronics to control high voltages. Consequently, power devices are used to improve the efficiency of electric-vehicle (EV) chargers, new energy generators, welders, and switched-mode power supplies (SMPS). Power device designs, which require high voltage, high efficiency, and high reliability, are typically based on MOSFET (metal-oxide-semiconductor field-effect transistor) and IGBT (insulated-gate bipolar transistor) structures. As a unipolar device, a MOSFET has the advantage of relatively fast switching and low tail current at turn-off compared to IGBT-based devices, which are built on bipolar structures. A superjunction structure adds a p-base region to allow a higher yield voltage due to lower RDS (on) and field dispersion than previous p-base components, significantly reducing the total gate charge. To verify the basic characteristics of the superjunction, we worked with a planar type MOSFET and Synopsys' process simulation T-CAD tool. A basic structure of the superjunction MOSFET was produced and its changing electrical characteristics, tested under a number of environmental variables, were analyzed.

A Study on Efficient Transmission Rate Control of ABR Traffic in PNNI Networks (PNNI 망에서 효율적인 ABR 트래픽 전송률 제어에 관한 연구)

  • Kim Byun-gon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.9 no.5
    • /
    • pp.973-980
    • /
    • 2005
  • In this paper, we analyze previous flow control algorithm for serving ABR traffic, and then propose the algorithm which calculate fair transmission rate and control efficiently ABR traffic using VS/VD switch which has an effect on PNNI environment with long delay. For getting the transmission rate, the proposed algorithm use FMMRA as ER scheme which calculate exactly the fair share. And, in large delay state, we can obtain fair cell sharing by calculating transmission rates which obtained by transmitted queue length information of VD to VS for serve and drain cell in queue Through the computer simulation, we evaluate the performance of proposed algorithm. According to the results, the proposed algorithm shows good performance.

Investigation of Network Application of the Hybrid SFCLs (복합형 초전도 한류기의 한류특성에 따른 계통 적용성 검토)

  • Choe, Won-Joon;Sim, Jung-Wook;Park, Kwon-Bae;Kim, Young-Gun;Oh, Il-Sung;Hyun, Ok-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.223-225
    • /
    • 2008
  • In order to apply SFCLs into electric power systems, the urgent issues to be settled are as follows, such as initial installation price, operation and maintenance cost due to ac loss of superconductor and the life of cryostat, and high voltage and high current problems. We designed novel hybrid SFCLs which combine superconductor and conventional electric equipments including a vacuum interrupter, an electro-magnetic contactor and a current limiting reactor. The main purpose of the hybrid SFCL is to drastically reduce total usage of superconductor by adopting current commutation method by use of the superconductor and the fast switch. According to protective coordination and performance, we investigated two concepts of Hybrid SFCLs. First is a half cycle fault current limitation type and second is a non-half cycle fault current limitation type. We concluded that the non-half cycle fault current limitation type is batter than the other.

  • PDF

The PC Clustering of the SIMD Structure for a Distributed Process of On-line Contingency (온라인 선로상정사고 분산처리를 위한 SIMD 구조의 PC 클러스터링)

  • Jang, Se-Hwan;Kim, Jin-Ho;Park, June-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.7
    • /
    • pp.1150-1156
    • /
    • 2008
  • This paper introduces the PC clustering of the SIMD structure for a distributed processing of on-line contingency to assess a static security of a power system. To execute on-line contingency analysis of a large-scale power system, we need to use high-speed execution device. Therefore, we constructed PC-cluster system using PC clustering method of the SIMD structure and applied to a power system, which relatively shows high quality on the high-speed execution and has a low price. SIMD(single instruction stream, multiple data stream) is a structure that processes are controlled by one signal. The PC cluster system is consisting of 8 PCs. Each PC employs the 2 GHz Pentium 4 CPU and is connected with the others through ethernet switch based fast ethernet. Also, we consider N-1 line contingency that have high potentiality of occurrence realistically. We propose the distributed process algorithm of the SIMD structure for reducing too much execution time on the on-line N-1 line contingency analysis in the large-scale power system. And we have verified a usefulness of the proposed algorithm and the constructed PC cluster system through IEEE 39 and 118 bus system.

An Improved C-Dump Converter for Switched Reluctance Motors (SRM 구동을 위한 향상된 C-Dump 컨버터)

  • Kim, Chong-Chul;Lee, Dong-Yun;Hur, Jin;Hyun, Dong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2002.04a
    • /
    • pp.90-92
    • /
    • 2002
  • This paper presents an improved C-Dump converter system for switched reluctance motors(SRM). The proposed C-Dump converter derived from the conventional converter for SRM. The proposed converter could overcome the limitation of the conventional C-Dump converter, and could reduce the whole cost of the SRM system since the voltage stress of the dump switch $T_d$ is reduced to $V_{dc}$ when compared with $2V_{dc}$ for the conventional C-Dump converter. The attractive features of the proposed converters are; high-efficient and low-cost, elimination of dump inductor, simple control strategy, smaller size arid light weight. The proposed converter is able to be fast magnetization by $2V_{dc}$, which is sum of the input voltage and charging voltage of the dump capacitor. Also, this topology has many advantages such as freewheeling of phase winding without complex control, reduction of current ripple, reduction of torque ripple, and reduction of switching frequency. Simulation demonstrates the good performance of the converter.

  • PDF

An Application of Generic Algorithms to the Distribution System Loss Minimization Re-cofiguration Problem (배전손실 최소화 문제에 있어서 유전알고리즘의 수속특성에 관한 연구)

  • Choi, Dai-Seub;Lee, Sang-Il;Oh, Geum-Kon;Kim, Chang-Suk;Choi, Chang-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.6-9
    • /
    • 2001
  • This paper presents a new method which applies a genetic algorithm(GA) for determining which sectionalizing switch to operate in order to solve the distribution system loss minimization re-configuration problem. The distribution system loss minimization re-configuration problem is in essence a 0-1 planning problem which means that for typical system scales the number of combinations requiring searches becomes extremely large. In order to deal with this problem, a new approach which applies a GA was presented. Briefly, GA are a type of random number search method, however, they incorporate a multi-point search feature. Further, every point is not is not separately and respectively renewed, therefore, if parallel processing is applied, we can expect a fast solution algorithm to result.

  • PDF

Faster Detouring for Data Plane Failures in Software Defined Networks (SDN에서 데이터 평면 장애를 해결하는 빠른 우회 기법)

  • Thorat, Pankaj;Yeom, Sanggil;Choo, Hyunseung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.124-126
    • /
    • 2016
  • Successful deployment of the Software Defined Network (SDN) depends on its ability to cope up with network failures. There are various types of failures that may occur in an SDN. The most common are switch and link failures. It is necessary to recover the network from failures for a continuous service availability. But for the real-time services fast recovery from the failure is required to minimize the service disruption time. In the proposed work, we focused on minimizing the recovery time after the failure is detected. Once the failure is detected, the controller involvement is needed to dynamically reroute the failure disrupted flows from the failed component to an alternate path. The aim of the proposed scheme is to provide a traffic management scheme which can react to the dynamic network events by rapidly modifying the forwarding behavior of the switches for faster in-band network adaptability. The proposed scheme (1) Considers the shared data and control path delay (2) Optimally utilize the network resources (3) Eliminates the need of constant monitoring overhead at the controller which results into faster detouring and ultimately rapid recovery.

Analysis of the congestion control scheme with the discard eligibility bit for frame relay networks (프레임 릴레이망에서의 DE 비트를 사용하는 혼잡제어 방식의 성능해석에 관한 연구)

  • 이현우;우상철;윤종호
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.9
    • /
    • pp.2027-2034
    • /
    • 1997
  • Frame relay is a fast packet switching technology that performs relaying and multiplexing frames with variable lengths over a wide area link at the T1 or E1 speed, by elminating error and flow control in the network. In frame relay networks, congestion control is typically performed through the rate enforcement with a discard eligibility (DE) bit, and the explicit negative feedback meachanisms using explicit congetion notification bits. In this paper, we consider the congestiong control scheme using the rate enforcement mechanism with DE bit for frame relay network. Assuming that each frame with exponentially distributed length arrives according to the Poission fashion, we can treat the frame relay switch as an M/M/1/K priority queueing system with pushout basis. We analyze and present the blocking probabilities and waiting time distributions of frames.

  • PDF

High-Voltage Pulsed Power Modulator based on single IGBT switch with Fast-Rising Time (빠른 상승률 갖는 단일 IGBT 스위치 기반 고전압 펄스 파워 모듈레이터)

  • Liu, Chang-yu;Cho, Chan-Gi;Song, Seung-Ho;Ryoo, Hong-Je
    • Proceedings of the KIPE Conference
    • /
    • 2019.11a
    • /
    • pp.46-48
    • /
    • 2019
  • 본 논문은 Discontinuous Conduction Mode(DCM) 플라이백 컨버터로 생성한 고전압 펄스를 스파크 갭으로 펄스 상승 시간을 줄이는 방법에 관하여 다룬다. 이러한 방법으로 생성된 빠른 상승률 특성을 가지는 고전압 펄스 전원장치는 친환경 가스 처리 분야에 사용할 수 있다. 기존 스태킹 구조의 펄스 전원 장치는 많은 수의 스위치들과 에너지 저장 소자가 필요하므로 부피가 커지고 제조 단가가 증가하는 반면, 분 논문에 제안된 전원 장치는 구조를 단순화하여 전체 시스템의 소형화 및 제조 단가를 낮춘 점을 특징으로 한다. 제안된 설계 토폴로지는 플라이백 변압기 2차 측에 다이오드의 사용 유무에 따라 두 개의 변형된 회로로 응용 가능 하다. 변압기 2차측에 다이오드를 사용하면, 음의 성분 없이 깨끗한 고전압 출력 펄스를 만들 수 있지만 사용한 다이오드의 전압 정격을 고려해야 한다. 다이오드를 사용하지 않는다면, 고전압 출력 펄스에 음의 성분이 발생하지만 비용과 부피를 최대한 줄일 수 있다. PSIM 시뮬레이션을 사용하여 제안하는 전원 장치의 23kV, 0.5 ㎲, 10 ns rising time의 출력 펄스 발생 성능을 검증하고, 다이오드 사용에 따른 출력 펄스의 차이점을 비교하였다.

  • PDF

A Simple Timeout Algorithm for Point-to-Multipoint ABR Service

  • Lai, Wei-Kuang;Chen, Chien-Ting;Li, Chilin
    • Journal of Communications and Networks
    • /
    • v.6 no.1
    • /
    • pp.38-45
    • /
    • 2004
  • The ABR point-to-multipoint connection is now playing a more important role than before. Many consolidation algorithms have been proposed to solve the consolidation noise problem and the slow transient response problem. But few timeout algorithms are proposed to handle the non-responsive branches for the multicast connections. Chen’s algorithm needs exchanging control messages between switches [9]. Besides, it may mistake a responsive branch as a non-responsive branch because of fast changes in source rates, which causes wrong information in BRM cells and may lead to network congestion and data losses in the responsive branch. We propose a simple timeout algorithm which can handle the non-responsive branches without exchanging message between switches. The timeout value for each switch is computed locally. Simulation results show that the proposed timeout algorithm can efficiently handle the non-responsive branches and utilize the available bandwidth within a small period of time. In addition, our algorithm could handle the situation when the source rates change quickly.