Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.137-146
/
2008
Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.
In this paper, a total of 13 beams with bonding, anchorage system, amount of prestressing and span length as variables of experiment were tested in flexural test and analyzed in finite element analysis; one control beam, two simplified FRP-boned beams, four prestressed FRP-unbonded beams and four prestressed FRP-bonded beams. Also, a nonlinear finite element analysis of beams in the flexural test is performed by DIANA program considered material nonlinear of concrete, reinforcement and the interfacial bond-slip model between concrete and CFRP plates. The failure mode of prestressed CFRP plated-beams is not debonding but FRP rupture. RC members strengthened with external bonded prestressed CFRP plates occurred 1st and 2nd debonding of the composite material. After the debonding of CFRP plates occurs in bonded system, behavior of bonded CFRP-plated beams change into that of unbonded CFRP-plated beams due to fix of the anchorage system. Also, It was compared flexural test results and analytical results of RC members strengthened with CFRF plates. The ductility of beams strengthened by CFRP plates with the anchorage system is considered high with the ductility index of above 3. Analysis results showed a good agreement with experiment results in the debonding load, yield load and ultimate load.
Landslides which is one of the major natural hazard is defined as a mass movement of weathered material rock and debris due to gravity and can be triggered by complex mechanism. It causes enormous property damages and losses of human lift directly and indirectly. In order to mitigate landslide risk effectively, a new method is required to develope for better understanding of landslide risk based on the damaged cost produce, investment priority data, etc. In this study, we suggest a new evaluation method for slope stability using risk analysis. 30 slopes including 10 stable slopes, 10 slopes of possible failure and 10 failed slopes along the national and local roads are examined. Risk analysis comprises the hazard analysis and the consequence analysis. Risk scores evaluated by risk analysis show very clear boundaries for each category and are the highest for the failed slopes and the lowest for the stable slopes. The evaluation method for slope stability suggested by this research may define the condition and stability of slope more clearly than other methods suggested by others.
Kang, Suk-Hyung;Seo Yang, Jin;Cho, Steve Sungwon;Cho, Yong-Jun;Jeon, Jin Pyeong;Choi, Hyuk Jai
Journal of Korean Neurosurgical Society
/
v.63
no.6
/
pp.806-813
/
2020
Objective : Lumbar disc herniation (LDH) is a common disease, and lumbar discectomy (LD) is a common neurosurgical procedure. However, there is little previous data on return to work (RTW) after LD. This study investigated the period until the RTW after LD prospectively. Clinically, the pain state at the time of RTW also checked. RTW failure rate 6 months after surgery also investigated. Methods : Patients with daily/regular jobs undergoing LD between September 2014 and December 2018 were enrolled. Pain was assessed by the Oswestri Disability Index (ODI) and the Numeric Rate Scale (NRS). Employment type was divided into self-employed, regular and contracted. Monthly telephone interviews were conducted to check RTW status and self-estimated work capability after surgery. Results : Sixty-seven patients enrolled in this study. Three patients failed to RTW, and three others resigned within 6 months after surgery. The preoperative NRS and ODI were 7.2±1.2 and 22.1±7.9, respectively. The average time to RTW was 5.1±6.0 weeks. At RTW, NRS was 1.5±1.8 and ODI was 6.3±3.9. Amongst patients that successfully returned to work were 16 self-employed workers, 42 regular employees, and three contracted workers. The time to RTW of self-employed, regular, and contracted workers were 5.9±8.8, 4.2±4.3 and 13.3±2.3 weeks, respectively (p=0.011). Thirty-six of the patients that returned to work self-reported a 22.8±15.6% reduction in work capability at 6 months. Conclusion : RTW may vary depending on the employment status. In this study, we found that while employment type may affect the length to RTW, most patients were able to RTW and >40% of patients reported no loss of work capabilities 6 months postoperatively, hopefully alleviating some patient hesitation towards LD.
Objective : The aim of the present study was to assess the safety and efficacy of the dynamic stabilization system in the treatment of degenerative spinal diseases. Methods : The study population included 20 consecutive patients (13 females, 7 males) with a mean age of $61{\pm}6.98$ years (range 46-70) who underwent decompression and dynamic stabilization with the Dynesys system between January 2005 and August 2006. The diagnoses included spinal stenosis with degenerative spondylolisthesis (9/20, 45%), degenerative spinal stenosis (5/20, 25%), adjacent segmental disease after fusion (3/20, 15%), spinal stenosis with degenerative scoliosis (2/20, 10%) and recurrent intervertebral lumbar disc herniation (1/20, 5%). All of the patients completed the visual analogue scale (VAS) and the Korean version of the Oswestry Disability Index (ODI). The following radiologic parameters were measured in all patients : global lordotic angles and segmental lordotic angles (stabilized segments, above and below adjacent segments). The range of motion (ROM) was then calculated. Results : The mean follow-up period was $27.25{\pm}5.16$ months (range 16-35 months), and 19 patients (95%) were available for follow-up. One patient had to have the implant removed. There were 30 stabilized segments in 19 patients. Monosegmental stabilization was performed in 9 patients (47.3%), 9 patients (47.3%) underwent two segmental stabilizations and one patient (5.3%) underwent three segmental stabilizations. The most frequently treated segment was L4-5 (15/30, 50%), followed by L3-4 (12/30, 40%) and L5-S1 (3/30, 10%). The VAS decreased from $8.55{\pm}1.21$ to $2.20{\pm}1.70$ (p<0.001), and the patients' mean score on the Korean version of the ODI improved from $79.58%{\pm}15.93%$ to $22.17%{\pm}17.24%$ (p<0.001). No statistically significant changes were seen on the ROM at the stabilized segments (p=0.502) and adjacent segments (above segments, p=0.453, below segments, p=0.062). There were no patients with implant failure. Conclusion : The results of this study show that the Dynesys system could preserve the motion of stabilized segments and provide clinical improvement in patients with degenerative spinal stenosis with instability. Thus, dynamic stabilization systems with adequate decompression may be an alternative surgical option to conventional fusion in selected patients.
The purpose of the water distribution system is gradually changing to increase the flexibility for responding to various abnormal situations. In addition, it is essential to improve resilience through preparing emergency plans against water supply failure. The most efficient way is emergency interconnections which supply water from interconnected adjacent blocks. To operate successful interconnections, it is essential to evaluate the supply performance in spatial and temporal aspects. The spatial and temporal aspects are dominated by its interconnected pipes and interconnected reservoirs respectively. In this study, an emergency interconnection scenario where problem occurred in reservoir 1 at 0:00hr in A city, Korea. An Advanced-Pressure Driven Analysis model was used to simulate the volume and inflow volume of the interconnected reservoirs. Based on the hydraulic analysis results, a multi-dimensional evaluation of the supply performance was conducted by applying possible water supply range indicator (PWSRI) and possible water supply temporal indicator (PWSTI) which are based on fuzzy membership functions. As a result, it was possible to evaluate the supply performance on the sides of consumers in spatio-temporal aspects and to review whether established plans mitigate the damage as intended. It is expected to be used for decision making on structural and non-structural emergency plan to improve the performance of an emergency interconnection.
Journal of the Korea institute for structural maintenance and inspection
/
v.21
no.4
/
pp.1-12
/
2017
This paper concerns the structural behavior of high-strength concrete beams with compressive strength of 80 MPa subjected to flexure. Main test variables were nominal yielding strength of longitudinal rebar including normal strength rebar(SD 400) and high strength rebar(SD 600), reinforcement ratio from 0.98 to 1.58% and beam section size with $200{\times}250$, $200{\times}300mm$. The nine beams were cast and tested under flexure. The study investigated ultimate flexural strength, load-deflection relationship, crack patterns, failure patterns and ductility of the test beams. Test results indicate that when rebar ratio increased flexural strength increased and ductility decreased. In addition, the number of cracks increased and the crack width decreased as the reinforcement ratio increased. The yield strength of rebar did not affect significantly load-crack width relationship. Nonlinear analysis of test beams was performed and then test results and analytical results of ultimate load were compared. Analytical results of high-strength concrete beams overall underestimated flexural strength of test beams.
Song, Joon Ho;Kim, Young Seok;Jung, Bok Ki;Lee, Dong Won;Song, Seung Yong;Roh, Tai Suk;Lew, Dae Hyun
Archives of Plastic Surgery
/
v.44
no.6
/
pp.516-522
/
2017
Background Implant-based breast reconstruction is being performed more frequently, and implants are associated with an increased risk of infection. We reviewed the clinical features of cases of implant infection and investigated the risk factors for breast device salvage failure. Methods We retrospectively analyzed 771 patients who underwent implant-based breast reconstruction between January 2010 and December 2016. Age, body mass index, chemotherapy history, radiation exposure, and smoking history were assessed as potential risk factors for postoperative infection. We also evaluated the presence and onset of infection symptoms, wound culture pathogens, and other complications, including seroma, hematoma, and mastectomy skin necrosis. Additionally, we examined the mastectomy type, the use of acellular dermal matrix, the presence of an underlying disease such as hypertension or diabetes, and axillary node dissection. Results The total infection rate was 4.99% (58 of 1,163 cases) and the total salvage rate was 58.6% (34 of 58). The postoperative duration to closed suction drain removal was significantly different between the cellulitis and implant removal groups. Staphylococcus aureus infection was most frequently found, with methicillin resistance in 37.5% of the cases of explantation. Explantation after infection was performed more often in patients who had undergone 2-stage expander/implant reconstruction than in those who had undergone direct-to-implant reconstruction. Conclusions Preventing infection is essential in implant-based breast reconstruction. The high salvage rate argues against early implant removal. However, when infection is due to methicillin-resistant S. aureus and the patient's clinical symptoms do not improve, surgeons should consider implant removal.
The purpose of this study is to capture the essentials in survey and evaluation scheme which are able to assess the hazard of a rock slope systematically. Statistical analysis are performed on slope instability parameters related to failure of the rock slope. As the slope instability parameters, twelve survey items are considered such as tension crack, surface deformation, deformation of retaining structures, volume of existing failures, angles between strike of discontinuity and strike of cut slope face, angles between dip of discontinuity and dip of cut slope face, discontinuity condition, cut slope angle, rainfall or ground water level, excavation condition, drainage condition, reinforcement. A total of 233 road cut slopes located in Gyeongnam were considered. The stability of the road cut slopes were evaluated by estimating the slope instability index(SII) and corresponding stability rank. 126 rock slopes were selected to analyze statistical relation between SII and slope instability parameters. The multiple regression analysis was applied to derive statistical models which are able to predict the SII and corresponding slope stability rank. Also, its applicability was explored to predict the slope failures using the variables of slope instability parameters. The results obtained in this study clearly show that the methodology given in this paper have strong capabilities to evaluate the failures of the road cut slope effectively.
Design provisions for the development length of headed bars in ACI 318-08 include concrete compressive strength and yield strength of headed bars as design parameters but do not consider the effects of transvers reinforcement. In addition, they have very strict limitation for clear spacing and material strengths because these provisions were developed based on limited tests. In this study, splice tests using SD600 headed bars with $2d_b$ clear spacing and transverse reinforcement were conducted. Test results show that unconfined specimens failed due to prying action and bottom cover concrete prematurely spalled. The contribution of head bearing on the anchorage strength is only 15% on average implying that unconfined specimens failed before the head bearing was not sufficiently developed. Confined specimens with stirrups placed along whole splice length have enhanced strengths in bearing as well as bond because the stirrups prevented prying action and improved bond capacity. Bond failure occurred in locally confined specimens where stirrups were placed only at the ends of splice length. The stirrups at ends of splice lengths can prevent prying action but the bond capacity did not increase. From regression analysis of test results, an equation to predict anchorage strength of headed bars was developed. The proposed equation consists of bond and bearing contributions and includes transverse reinforcement index. The average ratio of tests to predictions is 1.0 with coefficient of variation of 6%.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.