• Title/Summary/Keyword: facilities investment cost

Search Result 154, Processing Time 0.028 seconds

A Feasibility Study of the Construction Project in Pre-Design Phase (건설 프로젝트의 사업타당성 분석에 관한 연구)

  • 노병옥;이상범;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련과 건설사업 타당성분석)

  • No, Byeong-Ok;Song, Jin-U;Choe, Sang-Hyeon;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련관 건설사업 타당성분석)

  • 노병옥;송진우;최상현;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF

Report on VE & LCC (Value Engineering, Life Cycle Cost) Technics Introduction about the Electric Power Equipment (전력시설물에 대한 VE 와 LCC기법 도입에 관한 연구)

  • 김상직;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.81-86
    • /
    • 2003
  • Recently the introduction of VE & LCC techniques for large size electric power facilities be achieved in various kinds form, of and tends to evaluate to the beginning investment cost when think about cost of electric power facilities usually, but must consider all life cycle cost (maintenance cost, repair cost, improvement cost, operation cost, electric power cost etc.). This treatise applies design techniques that consider copper loss related by voltage drop at power supply of long distance in trunk design and all life cycle cost techniques

  • PDF

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

Reliability - Based Decision Analysis for Structures (신뢰성에 기반한 구조물 의사결정 방법)

  • Kim, Lee-Hyeon;Kim, Dong-Geun;Han, Seo-Yeon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3208-3213
    • /
    • 2011
  • It has regarded an attempt to design and construct more safe structures as challenges such as fate. In order to operate public facilities safely, It can be taken how to improve the resistance to applied load by increasing the cross-section of structural members or by installing reinforcement. But inevitably such a way is accompanied by an increase of construction cost or maintenance cost. To make a cost-effective construction, Reliability-based decision analysis which can judge the adequacy of investment is suggested using statistical data of the load, resistance and the maintenance cost.

  • PDF

Optimal Transmission Expansion Planning Considering the Uncertainties of Power Market (전력시장 불확실성을 고려한 최적 송전시스템 확장계획)

  • Son, Min-Kyun;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.560-566
    • /
    • 2008
  • Today, as the power trades between generation companies and power customer are liberalized, the uncertainty level of operated power system is rapidly increased. Therefore, transmission operators as decision makers for transmission expansion are required to establish a deliberate investment plan for effective operations of transmission facilities considering forecasted conditions of power system. This paper proposes the methodology for the optimal solution of transmission expansion in deregulated power system. The paper obtains the expected value of transmission congestion cost for various scenarios by using occurrence probability. In addition, the paper assumes that increasing rates of loads are the probability distribution and indicates the location of expanded transmission line, the time for transmission expansion with the minimum cost for the future by performing the Montecarlo simulation. To minimize the investment risk as the variance of the congestion cost, Mean-Variance Markowitz portfolio theory is applied to the optimization model by the penalty factor of the variance. By the case study, the optimal solution for transmission expansion plan considering the feature of market participants is obtained.

Environmental Accounting of the Total Maximum Daily Loads (TMDL) Program in the Nakdong River Basin using the Emergy Analysis (Emergy 분석을 이용한 낙동강유역의 오염총량관리계획에 대한 환경회계)

  • Kim, Jin Lee;Lee, Su-Woong;Kim, Yong-Seok;Lee, Suk-Mo
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.3
    • /
    • pp.349-356
    • /
    • 2011
  • This study, which evaluated the contribution of the real economic value and system in the Nakdong River Basin, estimated the emergy analysis for environmental accounting of the TMDL program. And an environmental accounting for TMDL is evaluated before and after adopting TMDL program respectively. The value of emergy after adopting the TMDL was 7.90 E+20 sej/yr. Although the real yield of the river after governmental investment was high (before: 9.7118 E+20 sej/yr and after: 9.7224 E+20 sej/yr), the effects of improvement was not great, in terms of an investment cost. The benefit/cost ratio resulted from environmental accounting has decreased from 1.493 to 1.230 due to the cost of managing treatment facilities. The method of improving water quality in the Nakdong River Basin by the TMDL program should be changed into an ecological treatment facilities using resources efficiently from a control of water quality depending on expansion of the wastewater treatment facilities and advanced treatment plant using high cost and non-renewable energies.

A Study on the Amendment of Act to activate the Establishment of Public Kindergarten - Focusing on Urban and Architectural Planning Act - (국·공립 유치원 설립 활성화를 위한 관련 법령 개정방안 연구 - 학교용지법 등 건축 및 도시계획 법령을 중심으로 -)

  • Cho, Chang-Hee;Dong, Jae-Uk;Lee, Hwa-Ryong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.2
    • /
    • pp.11-18
    • /
    • 2019
  • There is a growing demand for public kindergartens due to the problem of private kindergartens. However, when the kindergarten is built in the residential land development area, the cost of purchasing the land increases, and the overall project cost is increasing. This situation puts a lot of burden on educational finances. Therefore, to reduce the cost of establishing a kindergarten, it is required to revise related laws including act on the special cases concerning the procurement, etc. of school sites. The purpose of this study is to propose the revised laws to expand public kindergartens. In this study, the present situation of infants and kindergartens was analyzed through policy data and statistics. And the analysis of the investment evaluation data also analyzed the problems in establishing kindergarten. In addition, we conducted surveys and FGI analyzes on school sites and kindergarten related laws and regulations. Finally, this study aims to find a way to amend related acts of urban and architectural Planning for Invigoration of Public kindergarten establishment by analysis data.

Insulation Level Assessment on the Military Residential Facilities Considering the Investment Payback Period (투자회수기간을 고려한 군 주거시설의 단열수준 산정 연구)

  • Park, Young Jun;Meang, Joon Ho;Kim, Taehui;Kim, Sung Joong;Lee, Seung-Min;Son, Kiyoung
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.57-62
    • /
    • 2015
  • Purpose: This study, which is based on the investment payback periods, aims to suggest the proper insulation level which can be adapted to the Defense Military Facility Criteria regarding the military residential condominiums. For the energy performance simulation, it is required to collect the residential data regarding the military condominiums and climatic data concerning the regions they belongs to. The estimates through energy performance simulation are the regional heating loads and the heating transmission coefficients of building components. Method: With the heating loads, the annual heating cost saving per square meters is assessed. With the heating transmission coefficients of building components, the additional insulation installment cost per square meters is evaluated. With two outcomes, one as an annual value and the other as a present value, the investment payback period is calculated. Result: In result, it could be concluded that 55~70% insulation ratio can lead a superior residental environments as well as be contributed to the national policy associated with zero-energy buildings because the estimated investment payback period is shorter than the life span of the military residental condominiums. This upshot can be used as a foundation to enactment the Defense Military Facility Criteria associated with military residential condominiums.