• Title/Summary/Keyword: execution plan

Search Result 358, Processing Time 1.235 seconds

A Comparative Study on the Financial Index of Hospital in accordance with the Weight of Medical Treatment Fee for the Rehabilitative Medicine Department (재활의학과 진료비 비중에 따른 병원 재무지표 비교연구)

  • Oh, Chang Seok;Jung, Cu Jin;Park, Bo Kyung;Bae, Sung Kwon
    • The Korean Journal of Health Service Management
    • /
    • v.1 no.1
    • /
    • pp.125-137
    • /
    • 2007
  • The current hospital industry is showing relatively low profitability in comparison with other industries due to the low medical fees and high costs. Therefore, our government presented the direction of improvement through model execution and support of the specialized hospitals. However, it is estimated that the specialized hospitals also will show differentiated management performances in accordance with their specialized fields due to the characteristics of medical treatment. Therefore, this study had attempted an analysis on the financial index in accordance with the weight of medical treatment items for the rehabilitative medicine department among the whole hospital groups through getting out of analyzing financial indices of individual hospitals centered at their costs. For this p개pose, this study had carried out its research by partially reciting the study on the plan for utilizing participations of private health resources to expand rehabilitative medicine services into the private people of the Korea Health Industry Development Institute(KHIDI). As its results, it was shown that the stability, profitability, activity and productivity of hospitals with high weight of medical treatment for the rehabilitative medicine department were lower than those for the general hospitals. To support smooth operations of these hospitals 'with high weight of medical treatment for the rehabilitative medicine department or of specialized rehabilitation hospitals, it is judged that the plan such as the support for hospital management fund and the additional recognition on the rehabilitative fees, etc. together with the actualization of medical fees must be provided for the institutions which are providing rehabilitative medical services more than the fixed percentage and being equipped with the sufficient medical equipment and personnel to do them.

  • PDF

A Study on the Transformation in Design Process of Ronchamp Chapel (롱샹 성당의 설계 변형 과정 연구)

  • Lee, Jeong-Kyu
    • Journal of architectural history
    • /
    • v.8 no.1 s.18
    • /
    • pp.81-94
    • /
    • 1999
  • This Study aims at searching the meanings in the creative process of Ronchamp chapel by analyzing the drawings of the site, plan, section and elevation in chronological order. The origins of his architectural creation are identifying with the site(memories of Acropolis), analogies of crab shell, air plane wing and hydraulic dams. The architect informed himself about the site ,the tradition of pilgrimage associated with the place, and its devotion to the Holy Virgin; he looked into the rituals of the Catholic religion, spoke with ecclesiastics; he studied and annotated a monograph devoted to the site of Ronchamp. Also ,the plan required that it be possible to collect rainwater, since such was rare on the hill. In the first design phase, overall conception of building was carried out in the sketches and drawings from June 1950 to November 1950. The second phase in the elaboration of the project was from January 1951(at which time preliminary project was presented to the Commission of Holy Art) to April 1953. The modifications made were in response to opinions expressed by the patrons. The building moved to east and gargoyle moved to west, then, the elevations of north and west were changed. He designed the artificial land and bell tower from the first phase even after the beginning of construction ,he wanted them to be built .But they were not constructed, so the outer space for rituals of religion had no tension. I concluded that Le Corbusier had gifted ability and efforts to create spontaneous birth(after incubation) of the whole work, and the execution of drawings itself. He devoted himself to accomplish the project in spite of the change in situation or by clients.

  • PDF

A Case Study on R&D Process Innovation Using PI6sigma Methodology (PI6sigma를 이용한 R&D 프로세스 혁신 사례 연구)

  • Kim, Young-Jin;Jeong, Woo-Cheol;Choi, Young-Keun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.1
    • /
    • pp.17-23
    • /
    • 2010
  • The corporate R&D(Research and Development) has a primary role of new product development and its potential is the most crucial factor to estimate corporate future value. However, its systemic inadequacies and inefficiencies, the shorten product life-cycle to satisfy customer needs, the global operations by outsourcing strategy, and the reduction of product cost, are starting to expose to R&D business processes. The three-phased execution strategy for R&D innovation is introduced to establish master plan for new R&D model. From information technology point of view, PLM(Product Life-cycle Management) is one of the business total solutions in product development area. It is not a system, but the strategic business approach that collaboratively manage the product from beginning stage to end of life in all business areas PLM functions and capabilities are usually used as references to re-design new R&D process. BPA(Business Process Assessment) and 5DP(Design Parameters) in PI6sigma developed by Samsung SDS Consulting division are introduced to establish R&D master plan and re-design process respectively. This research provides a case study for R&D process innovation. How process assessment and PMM(Process Maturity Model) can be applied in business processes, and also it explains process re-design by 5DP method.

Study on the Relationship Establishment among u-City Service, Technology and Infrastructure (u-City서비스.기술.기반시설의 연계성 확보방안)

  • Cho, Chun-Man;Kim, Jung-Hoon
    • Spatial Information Research
    • /
    • v.17 no.3
    • /
    • pp.287-299
    • /
    • 2009
  • For the development and management of u-City(ubiquitous city), Ubiquitous City Construction Law was enacted(March 3, 2008) to form the legal basis of u-City plan, construction and managements afterwards. The ultimate goal of the u-City construction is the advancement of national territory utilization and management using Korea's high level of IT and spatial information infrastructure. Based on the definition of the u-City Construction Law, the u-City refers to a city where u-City services are provided through the u-City infrastructure applying u-City technology. But, based on the current level of relationship model among u-City service, technology and infrastructure, it is not enough to guide the local municipalities to plan and provide the successful u-City services in its vicinity. So as one of the core issues for the legal arrangements of successful u-City services, the purpose of the study is to suggest the basic directions and execution strategies for the relationship establishment among u-City service, technology and infrastructure.

  • PDF

Enhancing the Usability of National Geographic Information System: Focused on the GIS Utilization System (중장기 국가GIS 활용도 제고방안: GIS활용체계사업을 중심으로)

  • Kim, Jung-Hoon
    • Spatial Information Research
    • /
    • v.15 no.3
    • /
    • pp.251-266
    • /
    • 2007
  • Even on the point that the 3rd National GIS project is being executed following the completion of the 1st and 2nd, the National GIS utilization is still very low. It is well reasonable to anticipate that the utilization will grow much higher, as the national spatial data infrastructure had been almost equipped through the 1st and 2nd project periods. Facing the ubiquitous era, in particular, as the national-level GIS demand is to increase to a great extent, pre-established GIS application scope will become much wider, too. In preparation for these, the current study focused on the National GIS utilization system by reviewing on the execution procedures to evaluate the outcomes. For the actual administration procedures, to note, the National GIS utilization statuses by local municipalities were investigated in depth. And the barriers for the National GIS utilization enhancement were analyzed to look for feasible solutions. The results suggested were aimed to contribute to the amendment of the 3rd Master Plan, and to be used as part of the basic data for the establishment of the 4th Master Plan for the National GIS.

  • PDF

A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building (초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구)

  • Hong, Bo-Bae;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

A Study on the Bulletproof Reliability Program (방탄물자 신뢰성 평가(BRP)에 관한 연구)

  • Gu, Seung Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.300-307
    • /
    • 2020
  • This study examines the reliability evaluation concept and procedure of bulletproof materials (BRP: Bulletproof Reliability Program). ASRP, RAM analysis tasks were utilized for the study. Based on this analysis, the concept, method, performance system, and procedure of BRP were examined. The BRP task execution procedure consists of the following four steps. First, the business (evaluation) planning stage establishes the evaluation plan every year. Second, there is a testing stage that performs the general inspection, functional test, and operational test according to the established plan. Thirdly, there is an evaluation/analysis phase to synthesize/analyze the results and to judge the appropriate grade considering the performance of bulletproof materials. Finally, the follow-up step of each group according to the result. The following criteria are suggested for BRP implementation: BRP testing capability, development of BRP evaluation method, and recognition of the importance of BRP business.

A Benchmarking Study for Deriving Data-driven Asset Management Strategy: U.S. Federal Transit Administration (FTA) Case (데이터 기반 노후 철도시설 자산관리 전략 도출을 위한 벤치마킹 연구)

  • Baek, Seungwon;Yoo, Minkyung;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.591-599
    • /
    • 2021
  • Rail transit agencies in Korea have been struggling to set up a performance-based rail facility maintenance plan because there are no formal definition and decision criteria for aging infrastructure. This study investigates the definition of aging infrastructure through extensive literature review and identifies benchmarking criteria through comparison with rail transit facility management systems in Korea and United States. As results, an aging infrastructure should be defined considering both service age and performance level of a facility. The priority of repair/replacement should be also determined with reasonable criteria based on relationship between service age and performance level. To determine the definition and decision criteria, a practicable classification system for aging rail transit needs to be established in accordance with classification system for performance assessment. Furthermore, a comprehensive database needs to be built including useful life, performance level, and maintenance cost of each component of rail transit. It will allow establishing an efficient budget execution plan for aging infrastructure.

Consideration for defense preparedness against non-traditional security threats (focused on the threat of infectious diseases) (비전통 위협에 대한 국방 업무수행체계 유지방안 (감염병 위협 중심으로))

  • Kwon, Hyukjin;Shin, Donggyu;Shin, Youngjoo
    • Journal of Internet Computing and Services
    • /
    • v.23 no.1
    • /
    • pp.105-112
    • /
    • 2022
  • The national defense requires uninterrupted decision-making, even under direct or indirect impacts on non-traditional threats such as infectious diseases. Since all work utilizes the information system, it is very important to ensure the availability of the information system. In particular, in terms of security management, defense work is being performed by dividing the network into a national defense network and a commercial Internet network. This study suggests a work execution plan that takes into account the efficiency of work performed on the Internet and the effectiveness of security through effective defense information system operation. It is necessary to minimize the network contact point between the national defense network and the commercial Internet, and to select a high-priority one among various tasks and operate it efficiently. For this purpose, actual cases were investigated for "A" institution and characteristics were presented. Through the targeted tasks and operation plans to improve the effectiveness of defense tasks and ensure security, presented in this paper, it will be possible to increase the availability of task performance even in non-traditional threats such as infectious diseases.

A Study on Decisions of Selection Factors in the Fishing Village New-deal 300 Project Using the Analytic Hierarchy Process (계층의사분석 기법을 적용한 어촌뉴딜 300사업의 선정 결정요인 연구)

  • Kim, Dong Min;Kim, Gunwoo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.5
    • /
    • pp.692-699
    • /
    • 2022
  • The fishing village new-deal 300 project covers 300 fishing villages and ports for integrated development including reforming backward facilities and utilizing regionally indigenous resources for specialized programs. An analysis was conducted to decide selection factors in the fishing village new-deal 300 project through the expert interview based on AHP(Analytic Hierarchy Process). The results of high-class appraisal items showed that the weights were ranked in the order of the development conditions and basic plan, project effects, project plan, and project execution and management. The project effect obtained 15.57 point in the AHP analysis, whereas the guideline stipulated the point as 6 point for the project effect item, The derived weights for each appraisal item in this study will hereafter be referred in determining the assessment points for the fishing village and port development projects.