• Title/Summary/Keyword: excavation method

Search Result 1,058, Processing Time 0.026 seconds

Dynamic risk assessment of water inrush in tunnelling and software development

  • Li, L.P.;Lei, T.;Li, S.C.;Xu, Z.H.;Xue, Y.G.;Shi, S.S.
    • Geomechanics and Engineering
    • /
    • v.9 no.1
    • /
    • pp.57-81
    • /
    • 2015
  • Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

Planting Properties of Herbaceous Plant and Cool-season Grass in Environmentally Friendly Planting Block Using CSG Materials (CSG 재료를 이용한 친환경 식생 블록 내 초본식물 및 한지형 잔디의 식생 특성)

  • Kim, Young-Ik;Yeon, Kyu-Seok;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.1
    • /
    • pp.33-40
    • /
    • 2010
  • The cemented sand and gravel (CSG) method is a construction technique that adds cement and water to rock-like materials, such as rivered gravel or excavation muck which that can be obtained easily at areas adjacent to dam sites. This study was performed to evaluate the planting properties of herbaceous plant and cool-season grass in CSG blocks that were manufactured by using CSG materials to develop environmentally friendly CSG method. The two types of CSG-0 without cement and CSG-100 with $100\;kg/m^3$ of cement were designed to evaluate compaction, unconfined compressive strength and growth of plants with cement content by using modified E compaction. To analyze growth properties of plants, germination ratio, visual cover, plant height and root length were measured in 4 weeks and 8 weeks after sowing. As the results, the germination regardless kinds of plants started within 5~7days and the germination ratio were in the range of 50~60 %. The visual cover of kinds of plants by visual rating system were in the range of 7~8 and the visual cover of tall fescue and perennial ryegrass was higher than that of lespedeza cuneata. The plant height and root length for tall fescue and perennial ryegrass in 8 weeks after sowing were in the range of 22~26 cm, 12~15 cm and 4~6 cm, 3~5 cm, respectively.

Application of Fracture Toughness for Scaled Model Test (파괴인성의 축소모형실험 적용 연구)

  • Kim, Jong-Gwan
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.87-97
    • /
    • 2020
  • Fracture toughness of rock is a constant that can indicate the initiation and propagation of cracks due to blasting, excavation, etc. Scaled model tests have been applied to the behavior of tunnels and the stability of limestone mines. Through the scaled model, damaged zone evaluation due to blasting is also carried out, and the scale factor is not applied to the failure-related factors. In this study, DCT (diametral compression test) and finite element method ATENA2D numerical analysis results were compared to determine whether the scale factor could be applied to the fracture toughness of rock. The theoretical values of the scale factor applied to the fracture toughness of the rock and the DCT test results and the numerical results are 0.21~0.46, 0.40, and 0.99MPa ${\sqrt{m}}$ respectively, so these three values should be considered when determining scale factor. It is necessary to derive a suitable scale factor in consideration of the length, time, and mass to which the scale factor is applied, as well as the values of the scale factor of major design factors such as uniaxial compressive strength and density.

Study on key safety hazards and risk assessments for small section utility tunnel in urban areas (도심지 소단면 터널식 공동구의 핵심 안전 위험요소 및 위험성 평가 연구)

  • Seong, Joo-Hyun;Jung, Min-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.931-946
    • /
    • 2018
  • In line with the increased usability of utility pipe conduits in urban areas, construction and R&D activities of utility tunnel, incorporated with the shield TBM method, are actively under way. The utility tunnels are installed through underground excavation, and thus are relatively weak in terms of construction safety. However, hazards associated with the utility tunnel construction have not been properly identified, despite the introduction of a policy to the 'Design for Safety' for the purpose of reducing accident rates in the construction industry. Therefore, in this study, following the derivation of hazards associated with utility tunnel, these hazards were then used as the basis to uncover key safety hazards requiring extensive management in a field, which were then used to conduct a risk assessment having applied the matrix method so that the results can be utilized in risk assessment during the stages of utility tunnel planning, design, and construction, while also serving as a data reference.

A study on the utilization of cultural contents through the reproduction of the armor culture archetype - Focusing on armor excavated in Jaemaejeong, Gyeongju - (갑옷문화원형 재현을 통한 문화콘텐츠 활용에 대한 연구 - 경주 재매정 출토 갑옷을 중심으로 -)

  • Cho, Hyun Jin
    • The Research Journal of the Costume Culture
    • /
    • v.29 no.1
    • /
    • pp.16-27
    • /
    • 2021
  • The purpose of this study was to identify the structure and characteristics for the reproduction of the armor in the Unified Silla period, and then reproduce and utilize it as a cultural content. In the armor reproduction project excavated from Jaemaejeong, Gyeongju. Jaemaejeong armor is consisting of Singap (身甲, body armor), Sanggap (裳甲, hip armor), and Sangbakgap (上膊甲, upper arm armor) at the time of excavation. Unlike the armor of the Three Kingdoms period, Singap and Sanggap are separated. Singap is Yangdangsik (裲襠式, side opening method) and Gyunggap (頸甲, gorget) was not unearthed, Sangbakgap was divided into a part that protects the left and right upper arms and a part that protects the chest, so that the unexcavated head and neck cover of the helmet can be protected to the shoulder. In addition, in the case of Chalgap (札甲, lamellar armor), the Oejungsik (外重式, folded from outside to inside) is mainly used, but it is peculiar that Naejungsik (內重式, folded from inside to outside) is used in Sangbakgap of Jaemaejeong armor. It is presumed that this was used as a method to ensure that the armor were closely attached to the human body. In order to design with the parade armor of Gochwidae in Gyeongju based on the reproduced Jaemaejeong armor, the designer's imagination and historical work of the times were involved due to the characteristics of performance costumes. Reproduced armor as a cultural content should be considered indispensable to simplify and lighten clothing suitable for performances based on the excavated historical armor.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

New Observational Design and Construction Method in Tunnels and Its Application to Very Large Cross Section Tunnel (터널의 신 정보화 설계시공법과 극대단면 터널에의 적용)

  • Hwang Jae-Yun
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.5-14
    • /
    • 2004
  • The observational design and construction method in tunnels is becoming important recently. In many tunnels, enormous cost and time are consumed to cope with the failing or sliding of rock blocks, which could not be predicted because of the complexity of rock discontinuities. It is difficult to estimate the properties of rock masses before the construction. In this paper, a new observational design and construction method in tunnels are proposed, and then applied to the example of the very large cross section tunnel based on actual discontinuity information observed in situ. The items examined in developing a program for the new observational design and construction method are the following ones: generality, precision, high speed, and friendly usability. At the very large cross section tunnel, 7 key blocks were judged to be unstable because they could not be supported by standard supports. Supplementary supports were installed to these 7 key blocks before the excavation. It is possible to detect key blocks all along the tunnel exactly by using the numerical analysis program developed for the new observational design and construction method in the very large cross section tunnel. This computer simulation method with user-friendly interfaces can calculate not only the stability of key blocks but also the design of supplementary supports.

Estimation of Slime Thickness of Bored Piles by Using Borehole Electrical Resistivity Method (시추공 전기비저항 기법을 활용한 현장타설말뚝의 슬라임층 두께 평가)

  • Chun, Ok-Hyun;Lee, Jong-Sub;Park, Min-Chul;Bae, Sung-Gyu;Yoon, Hyung-Koo
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.3
    • /
    • pp.51-60
    • /
    • 2013
  • The slime, deposited in the bored pile due to falling soil particle, reduces the bearing capacity of bored pile and thus the stability of construction also decreases. The weight pendulum and iron have been used for estimating the slime thickness based on the subjective judgment and thus the previous method has a limitation of reliability. The objective of this paper is to suggest the method for estimating the slime thickness by using characteristics of electrical resistivity as scientific method. The temperature-compensation resistivity probe (TRP), which has a conical shape and the diameter of 35.7mm, is applied to the measurement of the electrical resistivity in the borehole during penetration. The field tests are carried out for estimating the slime thickness in the application site of bored pile. The slime thickness is calculated through the difference between excavation depth of borehole and measured data. Furthermore, the laboratory tests are also conducted for investigating effects of casing, time elapsing and relative density by using the specimen of slime. The laboratory test supporting the suggested method is reasonable for determining the slime depth. The paper suggests that the electrical resistivity method may be a useful method for detecting slime thickness and the method is expected to be applicable to various sites of bored piles.

Numerical Analysis of EPB TBM Driving using Coupled DEM-FDM Part II : Parametric Study (개별요소법과 유한차분법 연계 해석을 이용한 EPB TBM 굴진해석 Part II: 매개변수 해석)

  • Choi, Soon-wook;Lee, Hyobum;Choi, Hangseok;Chang, Soo-Ho;Kang, Tae-Ho;Lee, Chulho
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.496-507
    • /
    • 2020
  • A prediction of the performance of EPB TBM is significant for improving the constructability of tunnels. Thus, various attempts to simulate TBM excavation by the numerical method have been made until these days. In this paper, to evaluate the performance of TBM with different operating conditions, a parametric study was carried out using coupled discrete element method (DEM) and finite difference method (FDM) EPB TBM driving model. The analysis was conducted by changing the penetration rate (0.5 and 1.0 mm/sec) and the rotational speed of screw conveyor (5, 15, and 25 rpm) while the rotation velocity of the cutter head kept constant at 2 rpm. The torque, thrust force, chamber pressure, and discharging with different TBM operating conditions were compared. The result of parametric study shows that the optimum driving condition can be determined by the coupled DEM-FDM numerical model.