• Title/Summary/Keyword: excavation method

Search Result 1,058, Processing Time 0.205 seconds

An Architectural Study on the Building Remains at the Site of Beopsusa Temple in Seongju - With a focus on the remains of Buildings No.2 and 3 - (성주 법수사지 건물지에 대한 건축적 고찰 - 2호, 3호 건물지를 중심으로 -)

  • Hyun, Seung-Wook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.131-137
    • /
    • 2018
  • The two recent excavations at the site of Beopsusa Temple in Seongju revealed that it contained eight building remains, three pedestrian facilities, four drainage facilities, two walls, three embankments, and an estimated pagoda remain. Even though this investigation was restricted to some sections of the site, it confirmed remains of architectural significance and thus attracted the attention of concerned researchers. This study thus set out to make an architectural survey of the site based on the excavation results and examine the characteristics and nature of remains of Buildings No.2 and 3 at the site. The planar analysis results show that Building No.2 (Remains 2-2) at the site of Beopsusa Temple was a gable-roofed building with a single story including 6 kan(間) in the front and 4 kan(間) in the flank and that Building No.3 (Remains 3-3) was a single-story building with a hipped-and-gable roof including 5 kan(間) in the front and 3 kan(間) in the flank. The most noteworthy remain of this excavation was the north-south square platform discovered at the Building No.2 at the site. It is estimated as a high chair platform used for Buddhist sermons. It was confirmed only at the lecture hall remains of Hwangnyongsa Temple and Anyangsa Temple in the nation and had never been found at remains related to Chinese and Japanese Buddhist Temples, being regarded as a very important and unique artifact. Since it was found at the remains of Building No.2, they was estimated as the lecture hall remain at the site. Found at the remains of Building No.3 at the site, the oblong altar remains were also very unique and rare and never found at other Buddhist temple sites. The inside of oblong altar was evenly covered with roof tiles instead of rubble, and there were small crushed stones for internal division, which is an altar construction method distinctly different from its counterparts at other Buddhist temple sites. Those findings raise the possibility high that a wooden facility was put up at the top of oblong remains.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Analysis of the Correlation between the velocity speed of High-Speed Railways and the Suppressing Effect of lateral Displacement of retaining wall according to the Arrangement of Stabilizing Piles (억지말뚝의 배치에 따른 흙막이의 수평변위 억제효과와 고속철도의 속도와의 상관성 분석)

  • Son, Su-Won;Im, Jong-Chul;Seo, Min-Su;Hong, Seok-Woo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • In urban areas, structures are installed deep underground in the lower part of the structure to utilize space. Therefore, a retaining wall is used to prevent earth pressure from the ground when constructing a structure. Due to the development of construction technology, retaining wall applied to excavation work are used to prevent danger such as falling rocks and landslides in temporary facilities when construction or retaining walls are installed. In general, the application of a retaining wall to a temporary facility during the embankment construction is the case of expanding an existing roads or railways. Therefore, it is necessary to study the retaining wall applied to the embankment construction such as the double-track site of the high-speed railway. In this study, two types of common one row H-pile retaining wall and two types of IER retaining wall were analyzed, and the stability of the retaining wall applied to the construction of double-track of the high-speed railway was analyzed. The earth retaining wall is a construction method that combines forced pile applied to the stabilization of the slope with the wall of the earth retaining wall. As a result of the analysis, the IER retaining wall had maximum lateral displacement of 19.0% compared to the type with H-plie installed only in the front while dynamic load was applied. In addition, the slower the speed of high-speed railway, the more displacement occurred, and the results show that more caution is needed when designing the ground in low-speed sections.

A study on the wear and replacement characteristics of the disc cutter through data analysis of the large diameter slurry shield TBM field (대구경 이수식 쉴드TBM 현장의 데이터 분석을 통한 디스크커터의 마모 및 교체 특성 연구)

  • Park, Jinsoo;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.57-78
    • /
    • 2022
  • The disc cutter and cutterbit, which are the most important factors to increase the excavation efficiency of TBM, are key factors in the design and construction of the cutter head. The arrangement, spacing, number, size, and material of disc cutters suitable for the ground conditions determine the success or failure of TBM construction. The disc cutter, which is a representative consumable part in TBM construction, can cause enormous disruption to the construction cost as well as the construction cost unless accurate prediction of wear and replacement cycle is accompanied. Therefore, in this study, the method of calculating the replacement cycle of the disc cutter calculated at the time of design for the slurry shield TBM field, and the depth of wear and replacement location of the disc cutter that occurred during actual construction were compared by analyzing the field data. For a quantitative comparison, weathered soil/weathered rock, soft rock, and hard rock were classified according to the ground in the section showing constant excavation data, and the trajectory of circle was different depending on the location of the disc cutter, so it was compared and analyzed.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.

The Estimation of Appropriate Mixing Amount of Cement-Bentonite Cutoff Walls for Repair and Reinforcement of Reservoir Embankments (저수지 제체의 보수·보강용 Cement-Bentonite 벽체의 적정혼합량 산정)

  • Kim, Taeyeon;Lee, Bongjik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.6
    • /
    • pp.27-32
    • /
    • 2021
  • Due to heavy rainfall and typhoons caused by climate change, it has become common to witness heavy rain that exceeds the design frequency of agricultural reservoirs. This has brought greater attention to the safety of irrigation facilities including agricultural reservoirs. Out of approximately 17,740 reservoirs available in Korea, 83.87% were built before 1970. To ensure the safety of these old reservoirs, their embankments are being repaired and reinforced using various techniques. Among these techniques, using the cement-bentonite cutoff wall makes it possible to construct diaphragm walls with slurry composed of cement and bentonite, while excavation. The advantages of this technique include that it is simple and fast, and ensures the uniformity of cutoff walls by enabling the immediate application of the replacement method to excavation areas; thus excellent performance is guaranteed. However, despite these advantages, the technique is not commonly used in Korea. Thus, this study investigated the changes in strength and permeability by varying the mix ratio of cement and bentonite. As a major experimental results, when the cement of 200 kg/m3 and the bentonite of 60 to 80 kg/m3 is most suitable for the repair and reinforcement of the reservoir embankments.

A Study on Monitoring Surface Displacement Using SAR Data from Satellite to Aid Underground Construction in Urban Areas (위성 SAR 자료를 활용한 도심지 지하 교통 인프라 건설에 따른 지표 변위 모니터링 적용성 연구)

  • Woo-Seok Kim;Sung-Pil Hwang;Wan-Kyu Yoo;Norikazu Shimizu;Chang-Yong Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.1
    • /
    • pp.39-49
    • /
    • 2024
  • The construction of underground infrastructure is garnering growing increasing research attention owing to population concentration and infrastructure overcrowding in urban areas. An important associated task is establishing a monitoring system to evaluate stability during infrastructure construction and operation, which relies on developing techniques for ground investigation that can evaluate ground stability, verify design validity, predict risk, facilitate safe operation management, and reduce construction costs. The method proposed here uses satellite imaging in a cost-effective and accurate ground investigation technique that can be applied over a wide area during the construction and operation of infrastructure. In this study, analysis was performed using Synthetic Aperture Radar (SAR) data with the time-series radar interferometric technique to observe surface displacement during the construction of urban underground roads. As a result, it was confirmed that continuous surface displacement was occurring at some locations. In the future, comparing and analyzing on-site measurement data with the points of interest would aid in confirming whether displacement occurs due to tunnel excavation and assist in estimating the extent of excavation impact zones.

A Investigation on the Soil-Peel Methods in Conservation Method of Historical Site (유구 보존방법론 중 토층전사에 관한 고찰)

  • Wi, Koang-Chul;Seo, Jeong-Ho
    • Journal of Conservation Science
    • /
    • v.26 no.3
    • /
    • pp.341-348
    • /
    • 2010
  • After excavation work of relics, historical site which has historically meaningful, are preserved using the various methods. There are three method in the relocation methods that are original relocation method, the remaining structure-peel method, and soil peel method. The original relocation method is restored after relocating in historical site such as residential site, iron foundry site, kiln site, old mound. The remaining structure-peel method are restored only the feature of exposed remaining structure using polymeric resin, when it is difficult to relocate the entire remaining structure. And soil-peel method is exhibited after peeling in case when soil layers such as grave of old mound, foundation of building site, sedimentary deposit layer, shell heap, and etc. Soil-peel method becomes important historical data of changes according to environment at that time, that is, flooding by storm, traces of fire and living features of that time such as heaps of shells discarded after eating shellfish and living wastes. In particular, in case of soil layer for preparing foundation sites of building by compacting in turn soils with different components such as clay soil, rough sand soil and etc, it becomes important data which can judge foundation technology of that time. It can be said to be an important data preservation method for utilizing these historical data as historical data as well as for the purpose of education, exhibitions and public relations which can be shared not only by experts but also by general public. In this paper, we present the reliable definition of soil-peel method in various preservation methods and explain the using polymer in this method. So, we will come up with the accurate index about this method that is used the eminent analysis method for soil layer.

The Study on the Design and Numerical Analysis of Self-Supported Retaining Wall with Cement Treated Soil by Vertical Mixing Method(V-DCM) (연직교반혼합처리(V-DCM) 연속벽을 이용한 자립식 흙막이공법의 설계 및 해석에 관한 연구)

  • Byung-Il Kim;Kang-Han Hong;Young-Seon Kim;Jin-Hae Kim;Sang-Jae Han
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.9-23
    • /
    • 2023
  • In this study, the design methods of self-supported retaining wall with cement treated soil constructed by vertical mixing method (trencher mixing method, V-DCM), which are using in domestic and foreign field, are investigated, and the characteristics of it are presented with comparing the results of numerical analysis with the drainage and construction conditions. The results indicated that the method 1 (total stress analysis) is the most aggressive, and method 2 (effective stress analysis) and method 3 are similar in the internal stress, and the stress and the horizontal displacement are effected on the soil type and drainage conditions in backfill of the wall. Also, in the case of the design combined with numerical analysis the method 1 can be applied, in that of the traditional design without the analysis the method 2 or the method 3 can be used. Finally, if the numerical analysis is only conduct, the tensile stress in excavation base and in boundary of the wall and the original ground have to be considered in the numerical analysis method.

Experimental Study for Confirmation of Relaxation Zone in the Underground Cavity Expansion (지중 내 공동 확장에 따른 이완영역 확인을 위한 실험적 연구)

  • Kim, Youngho;Kim, Hoyeon;Kim, Yeonsam;You, Seung-Kyong;Han, Jung-Geun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.231-240
    • /
    • 2017
  • Recently, there have been frequent occurrences of ground sink in the urban area, which have resulted in human and material damage and are accompanied by economic losses. This is caused by artificial factors such as soil loss, poor compaction, horizontal excavation due to the breakage of the aged sewage pipe, and lack of water proof at vertical excavation. The ground sink can be prevented by preliminary restoration and reinforcement through exploration, but it can be considered that it is not suitable for urgent restoration by the existing method. In this study, a model experiment was carried out to simulate the in-ground cavities caused by groundwater flow for developing non-excavation urgent restoration in underground cavity and the range of the relaxation zone was estimated by detecting the around the cavity using a relaxation zone detector. In addition, disturbance region and relaxation region were separated by injecting gypsum into cavity formed in simulated ground. The shape of the underground cavity due to the groundwater flow was similar to that of the failure mode III formed in the dense relative density ground due to water pipe breakage in the previous study. It was confirmed that the relaxed region detected using the relaxation zone detector is formed in an arch shape in the cavity top. The length ratio of the relaxation region to the disturbance region in the upper part of the cavity center is 2: 1, and it can be distinguished by the difference in the decrease of the shear resistance against the external force. In other words, it was confirmed that the secondary damage should not occur in consideration of the expandability of the material used as the injecting material in the pre-repair and reinforcement, and various ground deformation states will be additionally performed through additional experiments.