A Study of the Construction Method of the Pit of Royal Lime Tombs in the Choseon Dynasty (조선왕릉 회격현궁(灰隔玄宮) 축조방법 연구)

  • Kim, Sang-Hyup
    • Journal of architectural history
    • /
    • v.21 no.4
    • /
    • pp.37-46
    • /
    • 2012
  • This study examines the construction method of lime tomb of royal tombs in the Choseon Dynasty based on reference. This was primarily published as "The Five Manners and Courtesy of the Annals of Sejong" as examples, which were followed by the influence of Koryo's culture in the beginning foundation of Choseon, were organized in the time of Sejong; and later, in the time of Sungjong, "The National Five Manners and Courtes y" was published. Such old reference explains the stone materials and construction method of the royal tomb's pit yet there were not many studies regarding the pit of royal tomb in the Choseon Dynasty. And there exists no historical research or reference study in regard to the pit of royal tomb which is formed as a lime tomb. This is believed to be impossible to excavate the royal tomb since ancestral ritual formalities are still given by the descendants and because of our country's culture of giving ancestral ritual formalities which value formalities and filial duty. However, the current excavation of Guhui Tomb, which was the early burial site, was important since it gives an opportunity to look at the shape and structure of lime tombs in the Choseon Dynasty. Thus, this study, based on the excavation of Guhui Tomb, will look into the construction method of the pit of lime tomb and will examine the structure, shape, construction method, etc. of the lime tomb which was formed after the time of Sejo in a way with reference history. This is an important data to learn the construction method of limb tomb of royal tombs in the Choseon Dynasty and is believed to have a very important value as historical materials as to understanding the structure of the pit of royal tombs in the Choseon Dynasty which yet has not been excavated.

A study on the effect of support structure of steel rib in partitioning excavation of tunnel (터널 상·하반 분할 굴착 시 강지보재 지지구조 효과에 대한 연구)

  • Kim, Ki-Hyun;Kim, Yeon-Deok;Hwang, Beoung-Hyeon;Choi, Yong-Kyu;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.543-561
    • /
    • 2020
  • This paper is the result of the study on the effect of the support structure of the tunnel steel rib. In tunnel excavation, the top and bottom half excavation methods result in subsidence of steel rib reinforcement due to insufficient support of steel rib reinforcement when the ground is poor after excavation. The foundation of the steel rib installed in the upper half excavates the bottom part of the base, causing the subsidence to occur due to various effects such as internal load and lateral pressure. As a result, the tunnel is difficult to maintain and its safety is problematic. To solve these problems, steel rib support structures have been developed. For the purpose of verification, the behavior of the supporting structure is verified by model experiments reduced to shotcrete and steel rib material similarity, the numerical analysis of ΔP and ΔP generated by bottom excavation by Terzaghi theoretical equation. As a result, it was found that the support structure of 20.100~198.423 kN is required for the 10~40 m section of the depth for each soil of weathered soil~soft rock. In addition, as a result of the reduced model experiment, a fixed level of 50% steel rib deposit of steel rib support structure was installed. The study shows that the installation of steel rib support structures will compensate for uncertainties and various problems during construction. It is also thought that the installation of steel rib support structure will have many effects such as stability, economy, and air reduction.

A Study on the Excavation of the Center Wall for the Evacuation Passageway in the Operating 2-Arch Tunnel (운행 중인 2-Arch 터널의 피난연결통로 신설을 위한 중앙벽체 굴착에 관한 연구)

  • Lee, Jong-Hyun
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.454-464
    • /
    • 2021
  • Purpose: There is a need to construct an evacuation passageway for the 2-Arch tunnel, which has been constructed and is in operation. Therefore, it aims to analyze tunnel and center wall behaviour and stability due to excavation of the center wall. Method: We describe the theoretical background of 2-Arch tunnel and evacuation passageway, and focused on analyzing the behaviour of tunnel and wall using 3-dimensional finite element analysis. Parametric analysis according to rock rating was performed with various ground conditions, and the displacement and stress of the center wall were intensively analyzed. Result: With the center wall excavation, the largest amount of settlement was shown in the center of the opening, and the stress was greatest during the first excavation. In addition, it was shown that stress concentration occurred at the top of both openings, and stability reviews considering the concept of allowable stress showed that it exceeded the allowable stress. Conclusion: Although the displacement of the tunnel has secured stability within the allowable standard, the generated stress is found to exceed the allowable standard, so it is necessary to prevent sudden stress release by applying appropriate reinforcement methods during construction.

Analysis of rock removal shape according to overlapping width of waterjet cutting (워터젯 절삭폭 중첩에 따른 암반제거 단면형상 분석)

  • Oh, Tae-Min;Park, Dong-Yeup;Park, Jun-Sik;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.3
    • /
    • pp.167-181
    • /
    • 2021
  • New type of rock excavation method using a waterjet system is being developed to secure economic feasibility and to reduce vibrations during excavation. In waterjet rock excavation, overlapping of cutting width is essential for high efficiency. In this study, cutting experiments for granite specimens were performed using abrasive waterjet system according to the overlapping ratio and standoff distance. Based on the experimental results, the granite cutting performance was analyzed according to the overlapping ratio. In addition, removal shapes of the cross-section were analyzed in terms of the cutting depth, width, and volume after waterjet cutting. When the overlapping ratio is less than 58%, rock specimens are partially removed due to the insufficient overlapping ratio. However, when the overlapping ratio exceeds 67%, overcutting phenomenon is observed. For the partial overlapping ratio (i.e., 25~75%), cutting efficiency is increased in the removal volume. This study is expected to be used as the important basic data for determining the optimum overlapping ratio when the waterjet system is applied for rock excavation.

Earth pressures acting on vertical circular shafts considering arching effects in c-$\phi$ soils : II. Lab. Model Tests (c-$\phi$ 지반에서의 아칭현상을 고려한 원형수직터널 토압 : II. 실내 모형실험)

  • Kim, Do-Hoon;Cha, Min-Hyuck;Lee, Dea-Su;Kim, Kyung-Ryeol;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.129-144
    • /
    • 2010
  • The earth pressure acting on the vertical shaft is less than that acting on the retaining wall due to three dimensional arching effect. Thus, it might be essential to estimate the earth pressure actually acting on the shaft when designing the vertical shaft. In this paper, large-sized model tests were conducted as Part II of companion papers to verify the newly suggested earth pressure equation proposed by Kim et al. (2009: Part I of companion papers) that can be used when designing the vertical shaft in cohesionless soils as well as in c-$\phi$ soils and multi-layered soils. The newly developed model test apparatus was designed to be able to simulate staged shaft excavation. Model tests were performed by varying the radius of vertical shaft in dry soil. Moreover, tests on c-$\phi$ soils and on multi-layered soils were also performed; in order to induce apparent cohesion to the cohesionless soil, we add some water to the dry soil to make the soil partially-saturated before depositing by raining method. Experimental results showed a load transfer from excavated ground to non-excavated zone below dredging level due to arching effect when simulating staged excavation. It was also found that measured earth pressure was far smaller than estimated if excavation is done at once; the final earth pressure measured after performing staged excavation was larger and matched with that estimated from the newly proposed equation. Measured results in c-$\phi$ soils and in multi-layered soils showed reduction in earth pressures due to apparent cohesion effect and showed good matches with analytical results.

Model for predicting ground surface settlement by field measuring and numerical analysis in shield TBM tunnel (현장계측과 수치해석에 의한 쉴드TBM 터널의 지표침하 예측모델)

  • Kim, Seung-Chul;Ahn, Sung-Youll;Lee, Song;Noh, Tae-Kil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.271-287
    • /
    • 2013
  • In this study, more convenient model(S-model) for predicting ground surface settlement is developed through comparing field monitoring data of the domestic subway applied shield TBM method with conventional equation & numerical analysis. Sample stations are chosen from whole of excavation section and lateral & vertical ground surface settlement characteristic with excavation are analysed. Based on analysis result, through the comparison with actual monitoring data, the model that is possible to compute maximum surface settlement and settlement influence area is suggested with assumption that lateral surface settlement forms are composed relaxed zone and elastic zone. In addition, vertical ground surface settlement patterns with excavation are similar to cubic-function and S-model with assumption that coefficients are function of tunnel diameter and depth is suggested. Consequently, the ground surface settlement patterns are significantly similar to actual monitoring data and numerical method result. Thus, as a result, when tunnels are excavated using sheild TBM through rather soft weathered soil & rock layer, prediction of ground surface settlement with excavation using convenient S-model is practicable.

An Experimental Study on Behavior Characteristics of the Pretension Soil Nailing Systems (프리텐션 쏘일네일링 시스템의 거동특성에 관한 실험적 고찰)

  • Choi, Young-Geun;Shin, Bang-Woong;Park, Si-Sam;Kim, Hong-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.2
    • /
    • pp.87-96
    • /
    • 2004
  • Application of the soil nailing method is continuously extending in maintaining stable excavations and slopes. However, ground anchor support system occasionally may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then could play important roles to reduce deformations mainly in an upper part of the nailed-soil excavation system as well as to improve local stability. In this study, a newly modified soil nailing technology named as the PSN (Pretension Soil Nailing) is developed to reduce both facing displacements and ground surface settlements in top-down excavation process as well as to increase the global stability. Up to now, the PSN system has been investigated mainly focusing on an establishment of the design procedure. In the present study, laboratory model tests are carried out to investigate the failure mechanism and behavior characteristics of the PSN system. Various results of model tests are also analyzed to provide a fundamental basis for the efficient design.

Seepage Behavior with Unsaturated Soil-Water Characteristic in Reclaimed Deep Excavation Area (해안매립지 대심도 굴착지역의 불포화 함수특성에 따른 침투류 거동)

  • Shin, Bang-Woong;Lee, Heung-Gil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.4
    • /
    • pp.47-58
    • /
    • 2005
  • Development of underground space is conducted for various useful facility and underground structures and deep excavation technology for reclaimed area has been researched and developed. The seepage flow and behavior of phreatic line in reclaimed area was predominated by transient flow caused by tidal action. Also the soil-water characteristic relation is most important factor for transient flow analysis, therefore the research about the soil-water characteristic is strongly required. In this paper, laboratory tests (pressure cell, desiccator, and tensiometer test) and theoretical analysis were performed to investigate the soil-water characteristic such as air-entry value, metric suction, and residual water content. And the feasibility of prediction method for soil-water characteristic are presented by transient seepage analysis and comparison between analysis results and in-situ measured seepage flux in LNG TK-00 storage tank. Based on the result of laboratory and theoretical analysis, Fredlund and Xing's method provide to work out well for reclaimed ground soils. Also, the transient analysis result is more reasonable and effective for design of deep excavation work in coastal and reclaimed ground.

  • PDF

Stability Analysis and Reliability Evaluation of the Pretensioned Soil Nailing System (프리텐션 쏘일네일링 시스템의 안정해석 및 신뢰도 분석)

  • 김홍택;강인규;박사원;고용일;권영호
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.2
    • /
    • pp.105-127
    • /
    • 1999
  • Application of the soil nailing method is continuously extended in maintaining stable excavations and slopes. Occasionally, however, ground anchor support system may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then, could play important roles in reducing deformations mainly in an upper part of the nailed-soil excavation system as well as improving local stability. In the present study, the analytical procedure and design technique are proposed to evaluate maximum pretension force and stability of the pretensioned soil nailing system. Also proposed are techniques to determine the required thickness of a shotcrete facing and to estimate probability of a failure against the punching shear. The predicted results are compared with the limited measurements obtained from the excavation site constructed by using the pretensioned soil nails. Based on the proposed procedure and technique, effects of the radius of a influence circle and dilatancy angle on the thickness of a shotcrete facing, bonded length and safety factors are analyzed. In addition, effects of the reduction of deformations expected by pretensioning of the soil nails are examined in detail throughout an illustrative example and FLAC$^{2D}$ program analysis.s.

  • PDF

A preliminary study for numerical and analytical evaluation of surface settlement due to EPB shield TBM excavation (토압식 쉴드 TBM 굴착에 따른 지반침하 거동 평가에 관한 해석적 기초연구)

  • An, Jun-Beom;Kang, Seok-Jun;Kim, Jung Joo;Kim, Kyoung Yul;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.3
    • /
    • pp.183-198
    • /
    • 2021
  • The EPB (Earth Pressure Balanced) shield TBM method restrains the ground deformation through continuous excavation and support. Still, the significant surface settlement occurs due to the ground conditions, tunnel dimensions, and construction conditions. Therefore, it is necessary to clarify the settlement behavior with its influence factors and evaluate the possible settlement during construction. In this study, the analytical model of surface settlement based on the influence factors and their mechanisms were proposed. Then, the parametric study for controllable factors during excavation was conducted by numerical method. Through the numerical analysis, the settlement behavior according to the construction conditions was quantitatively derived. Then, the qualitative trend according to the ground conditions was visualized by coupling the numerical results with the analytical model of settlement. Based on the results of this study, it is expected to contribute to the derivation of the settlement prediction algorithm for EPB shield TBM excavation.