Evaluation on Reinforcing Effect of Inclined System Bolting by Model Tests and Numerical Analysis (모형시험 및 수치해석을 통한 경사 시스템 록볼트의 보강효과 분석)

  • Lee, Jea-Dug;Kim, Byoung-Il;Yoo, Wan-Kyu;Han, Jin-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1529-1539
    • /
    • 2013
  • Recent case studies in Japan have shown that rockbolts are commonly installed at an oblique angle to the excavation direction of the tunnel, instead of at a right angle, due to restriction of the working space. In particular, in the case of expansion in an existing tunnel, the working space can be very small, due to the large protective structures necessary to operate within an existing tunnel. In this case, where both the current use of the existing tunnel, and the reinforcement of the ground around the tunnel are required, the effects of installation angles and patterns of rockbolts are important factors in the design process. Therefore, in this study, a total number of 24 model tests are performed, to investigate the reinforcing effects of system bolting installed obliquely from the excavation direction of the tunnel, by changing the installation angle of bolts, longitudinal distance, and bonded length of bolts. The model test results indicate that the relaxed load ratio decreases, with the increase of both the bonded lengths and the number of the installed bolts, resulting in the decrease of the supported area by one bolt. Two-dimensional numerical analysis, which considered the reinforcement effect of inclined system bolting as the change of engineering properties near the tunnel, demonstrated that the deflection patterns at the tunnel crown in the numerical simulations, show a similar tendency to those measured in the model tests.

A study on the relationship between initial and final convergence in NATM tunnels (NATM 터널 굴착시 초기 내공변위와 최종 내공변위의 상관관계 연구)

  • Kim, Bum-Joo;Hwang, Young-Cheol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.233-243
    • /
    • 2008
  • A tunnel behavior predicted in the investigation and design stage is often different from its actual behavior due to mainly the complexity of ground conditions. In a tunnel construction, therefore, it is necessary to ensure the stability of the tunnel by predicting the behaviors of the ground and the supports through observations and measurements, and modifying immediately excavation and reinforcing methods when necessary. To do so, it is important to be able to predict the final tunnel behavior based on the initial tunnel behavior as early as possible. In this study, the correlations were obtained between the initial and the final convergence by analyzing statistically the convergence measurement data, collected from two domestic road tunnels under construction using NATM. In order to estimate the unknown displacements, occurred during the period between the excavation and the first measurement, two methods were used - one is the method by means of regression analysis using a modified exponential function and the other the method by a simple linear regression analysis using the data measured within the distance from tunnel face equal to the tunnel diameter (D). Finally, the relationships were obtained between the initial and final convergence, including the non-measured displacements estimated from the two different methods, by performing linear regression analyses. The regression analysis results showed that there are clear linear relationships between the initial and final convegence and the difference between the two linear regression equations was not that large for when using the exponential function and the simple linear function to estimate the non-measured displacements.

  • PDF

Analysis of Pillar Stability for Ground Vibration and Flyrock Impact in Underground Mining Blasting (발파진동 및 비산충격에 대한 광주 안정성 분석)

  • Park, Hyun-Sik;Kim, Ji-Soo;Ryu, Bok-Hyun;Kang, Choo-Won
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.9-20
    • /
    • 2012
  • These days, mining industry prefers underground development for large mining because of exhaustive minning resources and large drafts and mining cavities thanks to extensive distribution of heavy excavation machines. In a mining design, to control collapse of cavities and secure stability, design of cavities and pillars are considered as very important. Therefore, this study obtained a prediction equation of blasting vibration through instrumentation for underground cavities. And we obtained theoretical shock vibration imposed on pillar through fragmentation analysis and measurement of flyrock distance. To examine the influence of pillar in underground mining blasting, we carried a finite element analysis and compared the result with prediction equation of blasting vibration, and shock vibration of flyrock when a impact was imposed on pillar and theoretical shock vibration.

Influence of Zero Reading on Predicting Crown Displacement of Tunnel (초기계측 시점이 터널 내공변위 예측에 미치는 영향분석)

  • Kim, Kwang-Yeom;Kim, Ho-Geun;Seo, Youg-Seok
    • Tunnel and Underground Space
    • /
    • v.22 no.3
    • /
    • pp.214-220
    • /
    • 2012
  • Deformation behaviour of rock mass around an opening measured during tunnel excavation is very important in order to assess the stability of the tunnel. Unfortunately displacement measured only after the installation of displacement measuring device can be acquired, which results in inevitably excluding the pre-displacement occurred and accumulated before the displacement measuring devices are installed. So it is very important to consider the pre-displacement based on the elapsed time before zero reading after deformation behaviour started. In this study, the accuracy of total estimated displacement depending on the distance between face and measurement position is calculated by statistical non-linear fitting on measurable displacement data. Besides, the influence of the unavoidable measurement error is considered by using Monte-Carlo simulation. As a result, the faster the initial reading started and the smaller the measurement error is, the higher the accuracy of estimating total displacement is obtained.

A Study on the Nano-Plasma Rock Breaking Blasting Method Using Rapidly Expansive Metal Mixture (급팽창 금속혼합물을 이용한 나노프라즈마 바위 파쇄공법에 관한 연구)

  • Kim Sung-Kook;Ahn Myung-Seog;Cho Myung-Chan
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.57-74
    • /
    • 2005
  • In the past, explosives like dynamite was used to blast rock. However, today it is difficult to use explosives in urban blastinglike excavation for subway, building, and housing land. According to Korea Department of Construction and Transportation's proposal for blasting design manual and test blasting, from TYPE I blasting to TYPE IV blasting are recommended when we determine 0.3cm/sec(centisec) as a maximum allowable ground vibration with a distance between $25m\~120m$ from structures. This article was written to introduce one of TYPE I (reck blasting within 25m from structures) blasting method, Nano-Plasma blasting method. When Nano-Plasma blasting method is applied in urban blasting job, ground vibration (15m away from blasting point) is expected 0.1cm/sec, which is only half of a ground vibration when low ground vibration blasting method is applied. By this unique characteristic, Nano-Plasma blasting method is epochal urban blasting technique.

Economical aessesment of long tunnel route complex geological formations (복잡한 지질구조암반층에서의 장대터널노선 선정을 위한 경제성 평가에 대한 연구)

  • Kim, Sang-Hwan;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.239-247
    • /
    • 2005
  • A new railway line of about 17km length was planned between Dongbaeksan and the neighboring town Dokye to improve the existing decrepit railway system. New line about 17km of the distance will almost be in circular alignment tunnels owing to the difference of elevation about 380m. Since the geology of the area is rather unusual compared to the normal in South Korea, extensive geological investigations have been carried out to prepare geological maps and profiles along the planned tunnel routes. The tunnel will almost be in sedimentary rock formations, such as limestone, sandstone, shale, coal etc and be near abandoned mines Various rock formations have the complicated, alter ed those rocks, but are well developed with laminated formations. Each rock formations have been classified using the Q-system and the cost of tunnel excavation, support has been estimated and compared for three alternative routes in the design stage. Based on these estimates, the final route of t he railway line was chosen.

  • PDF

Numerical Analysis on the Effect of Heterogeneous Nature of Rock Masses on Tunnel Behavior (터널 거동에 대한 암반 연약대의 영향 평가를 위한 수치해석적 연구)

  • Baek, Seung-Han;Kim, Chang-Yong;Kim, Kwang-Yeom;Hong, Sung-Wan;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.2
    • /
    • pp.115-128
    • /
    • 2006
  • The structural anisotropy and heterogeneity of rock mass, caused by discontinuities and weak zones, have a great influence on the deformation behavior of a tunnel. A tunnel construction in these complex ground conditions is very difficult. No matter how excellent a geological investigation is, local uncertainties of rock mass conditions still remain. Under these uncertain circumstances, an accurate forecast of the ground conditions ahead of the advancing tunnel face is indispensable to a safe and economic tunnel construction. This paper presents the effect of anisotropy and heterogeneity of the rock masses to be excavated by numerical analysis. The influences of distance from weak zone, the size or dimension, the different stiffness and the orientation of weak zones are analysed by 3-D finite element analysis. By analysing these numerical results, the tunnel behavior due to excavation can be well understood and the prediction of rock mass condition ahead of the tunnel face can be possible.

  • PDF

A review of the effects of rock properties on waterjet rock cutting performance (암석물성이 워터젯 암석절삭 성능에 미치는 영향고찰)

  • Oh, Tae-Min;Park, Eui-Seob;Cheon, Dae-Sung;Cho, Gye-Chun;Joo, Gun-Wook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.5
    • /
    • pp.533-551
    • /
    • 2015
  • The rock fracturing during waterjet cutting is very complicated because rock is inhomogeneous and anisotropic, compared with artificial materials (e.g., metal or glass). Thus, it is very important to verify the effects of rock properties on waterjet rock cutting performance. Properties affecting the rock cutting efficiency have been variously described in the literature, depending on the experimental conditions (e.g., water pressure, abrasive feed rate, or standoff distance) and rock-types studied. In this study, a rock-property-related literature review was performed to determine the key properties important for waterjet rock cutting. Porosity, uniaxial compressive strength, and hardness of the rock were determined to be the key properties affecting waterjet rock cutting. The results of this analysis can provide the basic knowledge to determine the cutting efficiency of waterjet rock cutting technology for rock excavation-related construction.

Estimation of Safety Zone of Tunnel due to Adjacent Structure (근접구조물에 의한 터널의 안전영역 평가)

  • Hwang, Taikjean
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.3052-3060
    • /
    • 2013
  • When planning to construct adjacent structure by the side tunnel, the criteria of safety zone of tunnel have been proposed. There are no specific theoretical basis regarding load conditions and the distance of structure and the geological strata and the conditions of adjacent structure's location, and the conditions applied load. Two and three dimensional numerical analysis preformed to prove the deformation of the ground and structures caused by the tunnel excavation and evaluated the correlation and the suitability of the tunnel's safety zone regarding the location of adjacent structures and the changes in the modulus of deformation. This paper proposed the safety zone's range is getting bigger as the modulus of deformation is higher. Also, it seems that the possible range of construction under constraints in the diagram of revalued safety zone significantly expands as shear failure line appears on the invert extension line below the spring line.

A Study on the installation time and method of soundproofing facilities according to a Tunnel blasting work. (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰.)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Proceedings of the KSEE Conference
    • /
    • 2006.10a
    • /
    • pp.119-140
    • /
    • 2006
  • The rock excavation work by doing blasting breaks the rock by using a shock pressure and gas pressure produced when explosive explodes and the shock wave by shock pressure propagated three-dimensionally from the exploding center is on the decrease notably to the distance, however, $0.5{\sim}20%$ of energy produced by blasting propagates into the ground outside a crack zone by the shape of an elastic wave, on the ground it appears as a ground vibration with a seismic amplitude and a seismic cycle, it is called a blasting vibration. on the other side, what propagated in the air is called a blasting sound. The blasting sound of both means the things which the shock sound within the range the audible frequency($20{\sim}20000Hz$) of the elastic wave in the air influences the response system of a human body, it doesn't harm physically to any structures but influences unreasonably a work accomplishment, such as a work discontinuance due to the outbreak of a public complaint by a mental pain, reduction of a blasting scale, etc.. So, this study is examined at about 20 sites on the installation time and method of soundproofing facilities for reduction of the sound accompanied with a tunnel blasting work.