• Title/Summary/Keyword: estuary

Search Result 1,212, Processing Time 0.035 seconds

Planning of Extuary Reservoirs for the Development of Water Resources -A Comparative Study of Representation Cases of Korea and Japan- (유역이수의 고도화에 대응하는 하구담수호의 계획론 -한국.일본의 대표적 사례의 비교연구-)

  • 이희영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.1
    • /
    • pp.44-52
    • /
    • 1982
  • Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.

  • PDF

Analysis of the Water Quality by Various Gate Operation Effects at Nakdong Estuary Barrier (낙동강하구둑 수문운영에 따른 수질 영향 분석)

  • Lee, Sang Jin;Ryoo, Kyong Sick;Hwang, Man Ha;Lee, Sang Uk
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.6
    • /
    • pp.651-658
    • /
    • 2008
  • Estuary barrier is a hydraulic structure constructed to supply safely water as protecting chlorine penetration of sea water. However, the barrier brings about a problem which decreases original functions of estuary because hydraulic ecology was disrupted as obstructing natural water exchange between fresh water and sea water. It is important to supply Enough fresh water in the estuary ecosystem. But it is possible to reduce the problems brought from barrier throughout efficient water gate operation of estuary barrier. It was shown in this study that the environmental effect of estuary in Nakdong river was investigated according to the control of water level. Also, the basic information about the effective water gate operation was provided. The analysis results showed that the release rate of estuary was increased about 20% as changing the operational water levels. This helps supplying fresh water durably to the mixing zone. Also, CE-QUAL-W2 model was utilized to assess water quality. The values of BOD and COD were not changed in estuary area. From the result, it was analyzed the effect of water quality according to the water gate operation was not indicated.

A Study on the Topography and Current Characteristic of the Before and After Construction at Geum River Estuary Dike (금강하구둑 축조 전.후의 지형 및 흐름특성에 관한 연구)

  • Shin Moon-Seup;Bae Ki-Seong;Kang Shin-Jung;Kim Jae-Hyoung
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.3 s.70
    • /
    • pp.61-66
    • /
    • 2006
  • The estuary has a very complex coastline and bottom topography. Before the close of floodgate, the Keum river estuary was deposited with sediment from the Keum river, created bythe construction of the Keum river estuary dike. So, a periodical dredging is necessary to assure water depth for boat entry and departure to Kunsan port. Theof this study is to find the change of tidal current of M2tide and the topography before and after construction at the Geum River estuary dike. The change of water depth is investigated by digitizing the sea map (No.305) of Kunsan port, which was edited by National Oceanographic Research Institute. The calculated co-range and co-tidal charts of M2tide before the dike construction are similar to the observed ones. Therefore, the amplitude and phase after construction at Geum River estuary dike increases compared to before construction at Geum River estuary dike. The scour occurred in the A-A' section.

Characteristics of Meteorological Environment Variation Before and After Construction of Nak-dong River Estuary Barrage (낙동강 하구둑 건설 전·후의 기상환경 변화 특성)

  • Jeon, Byung-Il
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.3
    • /
    • pp.135-145
    • /
    • 2005
  • This study was conducted to investigate the characteristics of meteorological environment variation before and after construction of Nak-dong river estuary barrage. We used meteorological data(air temperature, precipitation, relative humidity, visibility, wind) at Gimhae airport meteorological station. The construction of river estuary barrage can change climate at the neighboring districts and influence human's health and vegetable. The construction of Nakdong river estuary barrage brought rise of temperature, decrease of relative humidity and increase of poor visibility frequency.

Estimation of Nutrient Loading and Trophic States in a Coastal Estuary

  • Bach, Quang-Dung;Shin, Yong-Sik
    • Korean Journal of Ecology and Environment
    • /
    • v.44 no.4
    • /
    • pp.337-346
    • /
    • 2011
  • We investigated nutrient loading and trophic states in a coastal estuarine system in the Asan estuary by assessing phytoplankton biomass and using the trophic index (TRIX). The monthly and yearly nutrient loading (TN, TP) from freshwater discharge from the Asan and Sapgyo reservoirs into the estuary were estimated and analyzed with related factors. Monitoring data (physio-chemical and biological variables) collected at five estuary stations were used to assess trophic states. Descriptive statistics of total phytoplankton cells, chl a concentrations and primary productivity were also used to assess seasonal trophic status. N loading from freshwater ranged $1.0{\sim}1.3{\times}10^4$ ton yearly. The yearly P loading ranged between 350 and 400 ton during 2004~2006, increasing to 570 ton in 2007. Regression results suggest that DIN and DSi were correlated with freshwater discharge at the upper region. Based on phytoplankton biomass and total cell abundance, the trophic state of the estuary was found to be eutrophic during spring due to phytoplankton bloom. Primary productivity level was remarkably high, especially in summer coinciding with high nutrient loading. Pheopigments increased during warm seasons, i.e. summer and fall. Trophic index results indicate that the trophic state varied between mesotrophic and eutrophic in the estuary water body, especially in the upper region. The results suggest that phytoplankton production was regulated by nutrient loading from freshwater whereas biomass was affected by other properties than nutrient loading in the Asan Estuary ecosystem.

Analysis of Saltwater Intrusion by Flushing Discharge in the Seomjin River Estuary (Flushing 방류로 인한 섬진강 하구부 염수침입 영향분석)

  • Noh, Joonwoo;Lee, Jin-Young;Shin, Jae-Ki
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.3
    • /
    • pp.325-335
    • /
    • 2011
  • Estuary is a transitional zone between river and ocean environment that receives the maritime and riverine influence simultaneously. Estuaries are the most productive habitats because their incoming water provides large quantities of nutrients. The Seomjin River estuary, located in the middle south of Korea, has no barrage and shows natural characteristic of estuary. However, due to dredging and reclamation the environment of the estuary has been changed significantly in the river mouth. In addition, increased freshwater intake in midstream of the Seomjin River results in salinity intrusion. In this paper salinity variation in downstream estuary of the Seomjin River has been simulated and tested using EFDC model. The results of simulation were compared with measured data collected at three points, Culture & Art Center, Sumjin Iron Bridge, and Mokdori, located at 9Km, 14Km, and 15.5Km respectively from downstream estuary. Based on the simulated results, the contribution of the flushing discharge has been evaluated in preventing the salinity intrusion by increasing the discharge flowrates released from the Juam dam.

Evaluation of along-channel sediment flux gradients in an anthropocene estuary with an estuarine dam

  • Figueroa, Steven M.;Lee, Guan-hong;Chang, Jongwi;Schieder, Nathalie W.;Kim, Kyeongman;Kim, Seok-Yun;Son, Minwoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.86-86
    • /
    • 2022
  • While estuarine dams can develop freshwater resources and block the salt intrusion, they can result in increased sediment deposition in the estuary. The mechanism of increased sediment deposition in an estuary with an estuary dam is not well understood. To fill this knowledge gap, 7 ADCP measurements of flow and suspended sediment concentration (SSC) were collected along-channel in an estuary with an estuarine dam over a neap-spring cycle. Flow and SSC were used to calculate the sediment flux and sediment flux gradients. The results indicated that the cumulative sediment fluxes at all stations were directed landward. The along-channel sediment flux gradient was negative, which indicated deposition along the channel. The landward mean-flow fluxes were dominant in the deep portion of the channel near the estuary mouth, whereas landward correlation fluxes were dominant in the shallow portion of the channel near the estuarine dam. The tides were the dominant forcing driving the sediment fluxes throughout the estuary.

  • PDF

Delta Development in the Nakdong River Estuary: a Literature Survey (낙동강 하구역 삼각주 발달에 관한 문헌 고찰 연구)

  • Yoon, Han-Sam;Yoo, Chang-Ill;Kang, Yoon-Koo;Ryu, Cheong-Ro
    • Journal of Ocean Engineering and Technology
    • /
    • v.21 no.2 s.75
    • /
    • pp.22-34
    • /
    • 2007
  • We present basic data for developing new research topics and closely examine the existing data on the development and organization of the Nakdong River Estuary Delta by analyzing various studies of the area, including ocean engineering, coastal engineering, ocean environmental engineering, geomorphological, and geological studies. We first defined the general concepts related to the estuary and delta and reviewed the historical development of the Nakdong River Estuary Delta over the past 100 years. We then examined the origin and core elements of the estuary deposits that constitute the delta. In addition, we scrutinized the main factors affecting the development of the delta and analyzed existing research on delta development mechanisms by core researchers. The construction of an estuary barrage is one of the main factors effecting estuarine circulation and has altered the physical oceanic environment, area of deposition, atmospheric environment, and vegetation community of the delta. These factors affect the estuary circulation in turn, altering the delta. Along the Nakdong River, an unsteady-state sandy barrier appears at approximately three times the distance of the wavelength of incident offshore waves, and this terrain forms approximately 10-15 years after reclamation in the interdistributary upper stream and transforms the shoreline. It is necessary to develop a technique to predict terrain change that reproduces the erosion and accumulation of estuarine deposits. To determine the parameters and variables necessary to reproduce this system, continuous on-site monitoring is necessary. The existing research did not fully examine the terrain changes in Nakdong River Estuary or the periodic developmental characteristics. To understand the future process of estuary delta development, it is necessary to establish an integrated management system.

Development and Application of Multiple Box Water Quality Model for Estuary Reservoirs (담수호 Multiple Box 수질모형의 개발과 적용)

  • 임종환;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.31 no.4
    • /
    • pp.111-122
    • /
    • 1989
  • A multiple box model which is suitable for the prediction of water quality in shallow lakes with active mixing is a water quality model expected to be used widely in estuary reservoir. In this study, a multiple box water quality model for estuary reservoirs (MBQER) was developed arid the applicability of the MBQER was tested by applying data obtained from Asan-estuary reservoir. The results of this study can be summarized as follows. 1. The MBQER, dynamic water quality model, was developed to estimate 10-day water qualities of estuary reservoirs. For the proper analysis and the application of hydraulics needed to build a model, lake hydraulics was simplified by condisering only hydrological inflow and lake mixing currents. The box division in the MBQER is longitudinal one dimension for upper and middle part, and two layers for lower part of the reservoir. 2. The methods of box division for the multiple box model were ekamined and applied to Asan-estuary reservoir. For determining the number of boxes, Pe number and Pk number were used. In case of three boxes, the error by the model simplification would be estimated about 5 % Therefore, in Asan reservoir, the proper number of boxes was three. 3. The MBQER was calibrated and verified using measured data in Asan-estuary reservoir from 1986 to 1988. The Root Mean Squares(RMS) for the differences between measured data and simulated results by the MBQER were 1.10$^{\circ}$C C for water temperature, 75.8mg/1 for salinity, 0.082mg/1 for total-phosphorus showing good estimations. 4. Through the simulation of water temperature and salinity by the MBQER, the exchange flow and the mixing coefficients for the estuary lake were determined. As a result of simulation, the horizontal mixing coefficients in Asan-estuary reservoir were in the range of 1.07X 105 to 1.12X 105 cm$^2$/sec and vertical mixing coefficient was 2.90X 10-1 cm$^2$/sec.

  • PDF

A Study on the Topography Change of the Before and After Construction at Geum River Estuary Dike (금강하구둑 축조 전·후의 지형변화에 관한 연구)

  • Hong, Sung-Kun;Shin, Moon-Seup;Kang, Shin-Jung;Kim, Jae-Hyoung
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.179-186
    • /
    • 2006
  • We analyzed the harmonic and non-harmonic constant of Geum River estuary to know tidal change of the before and after construction at Geum River estuary dike. As a result of analysis, the harmonic and non-harmonic constant after estuary dike building increased. Also, depth change analyzed at each section by using each year chart data. As a result, scour was occurred in the channel between south and north side guide bank. And accretion was occurred at channel from Kunsan outer port to estuary dike. Tidal change was judged as the effect of construction and dredge, watergate closing at Geum River estuary dike. And water depth change is a cause by effection of Geum River estuary dike construction and, south-north side guide bank, Kunjang country industrial complex furtherance business, seamangeum 4th sea bankment construction.