• Title/Summary/Keyword: ess

Search Result 823, Processing Time 0.031 seconds

Effect Analysis for Frequency Recovery of 524 MW Energy Storage System for Frequency Regulation by Simulator

  • Lim, Geon-Pyo;Choi, Yo-Han;Park, Chan-Wook;Kim, Soo-Yeol;Chang, Byung-Hoon;Labios, Remund
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.227-232
    • /
    • 2016
  • To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.

The Mass Production Weapon System Environmental Stress-Screening Test Design Method based on Cost-effective-Optimization (비용 효과도 최적화 기반 양산 무기체계 환경 부하 선별 시험 설계 방법)

  • Kim, Jangeun
    • Journal of Applied Reliability
    • /
    • v.18 no.3
    • /
    • pp.229-239
    • /
    • 2018
  • Purpose: There is a difficulty in Environmental Stress Screening (ESS) test design for weapon system's electrical/electronic components/products in small and medium-sized enterprises. To overcome this difficulty, I propose an easy ESS test design approach algorithm that is optimized with only one environment tolerance design information parameter (${\Delta}T$). Methods: To propose the mass production weapon system ESS test design for cost-effective optimization, I define an optimum cost-effective mathematical model ESS test algorithm model based on modified MIL-HDBK-344, MIL-HDBK-2164 and DTIC Technical Report 2477. Results: I clearly confirmed and obtained the quantitative data of ESS effectiveness and cost optimization along our ESS test design algorithm through the practical case. I will expect that proposed ESS test method is used for ESS process improvement activity and cost cutting of mass production weapon system manufacturing cost in small and medium-sized enterprises. Conclusion: In order to compare the effectiveness of the proposed algorithm, I compared the effectiveness of the existing ESS test and the proposed algorithm ESS test based on the existing weapon system circuit card assembly for signal processing. As a result of the comparison, it was confirmed that the test time was reduced from 573.0 minutes to 517.2minutes (9.74% less than existing test time).

A Study on the Energy Saving Method by controlling Capacity of Sea Water Pump in Central Cooling System for Vessel (선박용 중앙냉각시스템의 해수 펌프 용량조절에 따른 에너지 절감 기법에 관한 연구)

  • Lee, Ji-Young;Yoo, Heui-Han;Kim, Yun-Hyung;Oh, Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.31 no.5
    • /
    • pp.592-598
    • /
    • 2007
  • The fuel charge is getting higher in navigation cost. Therefore, shipowners try to find the method for reducing oil consumption. ESS(Energy Saving System) is one of he method. ESS is the system consisted with two inverters, ESS control unit and monitoring system. Two inverters control two main sea water cooling pumps. In the ESS control Unit, the control algorithm finds optimized point to decrease a power consumption of main sea water cooling pumps. Monitoring system observes ESS not to work improperly. ESS is experimented in the laboratory with real condition and analyzed in every view. After experiment, the result of the experiment shows that the control algorithm works correctly and safely. ESS has a plan to be operated in the ship soon. In that case, additional devices are needed to connect ESS with cooling system of the vessel. So the development of addition device is needed and being studied.

Development of optimal algorithm for PV-ESS integrated system by 3 Dimensional Dynamic Programming (3차원 동적계획법에 의한 PV-ESS 연계형 시스템의 최적운용 알고리즘 개발)

  • Choi, You-Rim;Lim, Tae-Hun;Jung, Jea-Hoon;Kim, Yong-Ha
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.1027-1032
    • /
    • 2019
  • In this paper, we had developed an algorithm that can cope with all the economic variables that may occur in the operation of PV-ESS system by developing the algorithm for the operation method of PV-ESS connected system. Based on this, the optimal operation schedule of PV-ESS was decided to minimize the electric charges of customers. Through this, we developed a three-dimensional dynamic planning method based on case generation to determine the optimal PV-ESS operation schedule stably even when exogenous variables change.

A Study to Prevent the Occurrence and Spread of Fire Caused by ESS Storage (ESS 저장창고로 인한 화재의 발생 및 확산방지를 위한 연구)

  • Shin, Joung Hyeon;Jo, Su Yeon;Kim, Geon-Woo;Jung, Ui In;Kim, Bong Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.140-141
    • /
    • 2021
  • ESS refers to a device that can store electrical energy produced by renewable energy generation, etc. and use it when necessary. Lithium-ion batteries are composed of high energy density and combustible electrolyte, so once ignited, it is difficult to extinguish. Many studies have been conducted to solve the problem of the battery itself as the cause of the fire. However, there is also a problem with the structure in which ESS(hereinafter referred to as ESS storage) is installed itself. Therefore, the purpose of this paper is to provide data to solve the problems related to ignition and fire spread due to the problem of ESS storage. In summer, the internal temperature of the ESS storage rises due to solar radiation to trigger a fire, so it is necessary to prevent an internal temperature rise due to solar radiation. Research on standards, materials used, structures, etc. for ESS storage and new regulations are required.

  • PDF

Foundation Establishment of Professional Evaluation Center for Convergence of Energy Storage System (ESS) (에너지저장장치(ESS) 융복합 전문평가센터 기반구축)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.4
    • /
    • pp.165-170
    • /
    • 2020
  • In the rapidly growing new and renewable ESS parts and materials market, there is a limit for domestic SMEs to cope with the rapidly changing global new and renewable ESS market. There is a growing need to build a new and renewable ESS convergence commercialization support center. Therefore, through the establishment of a new and renewable ESS convergence professional evaluation center base, performance evaluation and standardization of new and renewable ESS products enhance product reliability. And By securing the reliability of new and renewable ESS, it is possible to promote domestic supply business and export activation. In addition, by supporting domestic research institutes and manufacturers to enhance their development capabilities and strengthen their competitiveness, and shortening the test cost and testing period according to the total-test evaluation system, it is possible anti-spill effect can be expected. Therefore, in this paper, we intend to study the establishment of a test certification center beyond the level of developed countries that can establish standardization for performance evaluation and demonstration.

Energy Storage System Model for Facility Plan Connected with Solar and Wind Power Plant (태양광/풍력 연계 기반의 에너지저장장치 설비계획 모델링)

  • Lee, Yong-Bong;Kim, Jeong-Ho
    • Journal of IKEEE
    • /
    • v.19 no.3
    • /
    • pp.295-303
    • /
    • 2015
  • Considering to Energy Storage System (ESS) is a global trend In order to reduce global warming and carbon emissions. South Korea has announced various policies to vitalize the development and uptake of renewable energy. South Korea is planning the cumulative capacity of ESS of two million kW in 2020. According to the government support and development of technology companies, the battery of ESS prices are expected to fall gradually. In this paper, we develop a planning model that take into account the supply expansion of technology of ESS and prices. Based on planning model, we analyze the cost of ESS linked with wind power and the revenue for trading electricity and renewable energy certifications.

Battery Failure Prediction using BMS Information of ESS Rooms at Offshore Installation Vessel (해양설치선 ESS Room의 BMS정보를 활용한 Battery 고장예측)

  • Kim, Woo-Young;Cheon, Bong-Won;Kim, Nam-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.59-61
    • /
    • 2021
  • The electric propulsion development is underway to minimize pollutants and greenhous gas emissions during the operation of ships / offshore installation vessels. The importance of the use and efficient management of batteries, which is an ESS system in ships / offshore installation vessels, is increasing. Generally, in ESS where battery is applied, cell balancing and life span are monitored in real time by BMS. Ships / offshore installation vessel are equipped with several ESS rooms, and ESS rooms with ESS systems of the same specification are being constructed due to the recent demand for electric propulsion development. In this paper, we propose an algorithm to additionally predict and diagnose battery pack and cell balancing failures by comparing BMS data for each rooms. The proposed algorithm compares the BMS data of each ESS Room according to the environmental change of the ship / offshore installation vessels, measures accurate status information, and reliably monitors it to prevent accidents in advance.

  • PDF

Profitability Analysis of ESS with PV Generation (PV연계형 ESS의 설치 규모에 따른 수익영향)

  • Kim, Chang Soo;Choi, Sang Bong
    • Current Photovoltaic Research
    • /
    • v.8 no.3
    • /
    • pp.86-93
    • /
    • 2020
  • The investment in solar and wind generation is rapidly increasing with government's renewable expansion policy and Renewable Portfolio Standard (RPS). Since the large penetration of solar and wind generation increases the variability and uncertainty of supply and demand balance in power system, the government is pursuing the policy of supplying energy storage system (ESS) linked to renewable energy. ESS contributes to the ease of transmission and distribution grid by shifting PV generation from daytime to evening hours. Recently, the declining market price of REC as ESS incentive, policies to cut down incentives and limited ESS storage due to fire events lead to the aggravation of long-term profitability, thus working as a barrier of ESS spreading. In this study, the factors affecting the profit of ESS are analyzed and brief indicators are derived. Based on the indicators, the profit changes are analyzed considering the variation of REC market price and REC incentive weights. Based on the profit change with respect to the increase of ESS capacity, economical ESS installation capacity is suggested.

Development of ESS Scheduling Algorithm to Maximize the Potential Profitability of PV Generation Supplier in South Korea

  • Kong, Junhyuk;Jufri, Fauzan Hanif;Kang, Byung O;Jung, Jaesung
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2227-2235
    • /
    • 2018
  • Under the current policies and compensation rules in South Korea, Photovoltaic (PV) generation supplier can maximize the profit by combining PV generation with Energy Storage System (ESS). However, the existing operational strategy of ESS is not able to maximize the profit due to the limitation of ESS capacity. In this paper, new ESS scheduling algorithm is introduced by utilizing the System Marginal Price (SMP) and PV generation forecasting to maximize the profits of PV generation supplier. The proposed algorithm determines the charging time of ESS by ranking the charging schedule from low to high SMP when PV generation is more than enough to charge ESS. The discharging time of ESS is determined by ranking the discharging schedule from high to low SMP when ESS energy is not enough to maintain the discharging. To compensate forecasting error, the algorithm is updated every hour to apply the up-to-date information. The simulation is performed to verify the effectiveness of the proposed algorithm by using actual PV generation and ESS information.