• 제목/요약/키워드: environmental site assessment

검색결과 724건 처리시간 0.028초

공산오차를 적용한 환경영향평가 대상지역 설정 기준에 관한 연구 - 곡사화기 사격장 조성사업을 중심으로 - ('Probable Errors' as an EIA Method to Define Project Impact Area - Focusing on the Preparation of 'Howitzer' Fire Training Site -)

  • 강재구;최준규;조공장;주용준;한명수
    • 환경영향평가
    • /
    • 제16권6호
    • /
    • pp.495-502
    • /
    • 2007
  • In Korea, military authorities have neglected to consider impacts of military projects on local communities and natural environment. Moreover, local communities have had difficulties in dealing with the Ministry of National Defense (MND), which was stubborn enough not to implement environmental assessment on their projects. In this situation, recent case, "EIA of Baekgol Division's Howitzer Fire Training Site" in the Supreme Court-in which judges upheld the Higher Court's decision that the division violated the Environmental Impact Assessment law by ignoring to implement EIA-reveals that military projects can no longer forgo environmental assessment. The decision has serious ramifications on the future of Environmental Impact Assessment in military-led projects. This paper examines the proper scope of EIA in military-led projects and, more specifically, fire training site and searches for how to improve it through 'probable error,' a military training method that is applied to real 'howitzer' fire training. Probable error of the artillery field manual is nothing more than an error that exceeded as often as it is not exceeded and its scientific method was demonstrated through real fire tests in the US. Army. If it is applied to improve assessment methods about the proper scope of EIA in military 'howitzer' fire training site, 'probable error' will improve effect prediction, mitigation and reliability.

환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구 (Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA)

  • 성현찬;한상욱
    • 환경영향평가
    • /
    • 제3권1호
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

매립지 주변 환경영향평가시 소음지도 활용연구 (A Study on the Utilization of Site Noise Map for Environmental Impact Assessment around Landfill)

  • 박인선;박상규
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 추계학술대회논문집
    • /
    • pp.66-70
    • /
    • 2005
  • Noise prediction are required as part of an environmental impact assessment. Prediction method that is used to domestic environmental impact assessment of construction site and industrial site is not applied work operation rate, work position, moving noise source, inner traffic flow, work type and height of noise source etc. The BS5228 methodology is used mainly for assessment of proposed open industrial sites(mineral extraction, landfill etc.), and larger long-term construction sites(typically for major infrastructure projects). also, estimation which consider various effect factor is possible.

  • PDF

환경영향평가에서 GIS 활용에 관한 연구 : 폐기물매립지 적지분석과 악취영향평가 (GIS Application in Environmental Impact Assessment : Suitability Analysis and Odor Impact Assessment of Landfill Site)

  • 김명진;한의정;이재운;정동환;서창완
    • 환경영향평가
    • /
    • 제4권1호
    • /
    • pp.1-8
    • /
    • 1995
  • Environmental Impact Assessment(EIA) in Korea has developed as a tool for environmental conservation and decision making since Environmental Impact Statement(EIS) preparation in 1981. For effective implementation of it, we do system development and method enhancement continuously. The recently introduced GIS (Geographic Information System) can integrate geographic and attribute data, which will be applied to scoping, assessment, and alternative assessment, etc. in EIA. This study has three major components. First, it explains building of EIA factors of natural environment, living environment, and socio-economic environment of the study area defined in EIS preparation regulation. Second, the study presents applications of assessment method concerning suitability analysis of landfill site using GIS. Finally, it shows integration of GIS and odor impact assessment. Based on these analysis, the study makes some recommendations and conclusions.

  • PDF

대규모 단지조성 미세먼지 관리 방안 (Management Scheme According to Characteristics of PM-10 Occurred from Large Scale Development Site)

  • 권우택;이우식;홍상표
    • 환경영향평가
    • /
    • 제22권1호
    • /
    • pp.79-87
    • /
    • 2013
  • The purpose of this study is to establish PM-10 management manual for developing large scale sites by assessing the status of PM-10 reduction at ongoing large scale development sites. After analyzing the meteorological conditions and air quality characteristics of Sihwa MTV development site, ISCST3 (Industrial Source Complex Short Term Model 3) was implemented to predict PM-10 generation. The outcomes of ISCST3 modelling were utilized for verification of site survey data. As a result of applying air pollution modeling, the diffusion rate of PM-10 decreases according as the wind speed decreases. And the emission rate of PM-10 increase is linear to the concentration of PM-10. The reduction target of PM-10 can be derived quantitatively from the difference between the forecasted emission rate and the permissible emission limit of PM-10. The assessment of PM-10 characteristics which is deduced from ISCST3 and site survey can be practically applied to accomplish environmentally acceptable air quality manual for large scale development sites.

60Hz 고압 송전선로의 자기장 발생범위에 대한 GIS 적용 방안에 대한 연구 (Study about the Applicable Plan of GIS on Range of Magnetic Field Emitted from 60 Hz Powerline)

  • 홍승철;최성호;김윤신;박재영
    • 환경영향평가
    • /
    • 제15권4호
    • /
    • pp.271-277
    • /
    • 2006
  • In this study, we investigated the applicable plan of GIS on the environmental impact assessment of 60 Hz Powerline. So we assessed distance data based on calculations by use of 2D and 3D Geographical information systems(GIS) and distance data based on measurements on 1: 5000 maps accord with on site distance measurements to use input data for calculating magnetic field. One hundred eight of the on site measured addresses were selected from residences. The data were achieved by measuring the distance between residence and power line on maps with scales of 1: 5000. The digital map was obtained from National Geographic Information Institute with scales of 1: 5000, and we made 2D and 3D map. Correlation analyses were performed for statistical analyses. For the 3D GIS versus on site comparison of different exposure categories, 70 of 108 measurements were assigned to the correct category. Similarly for 2D GIS versus on site comparison, 71 of 108 were correctly categorized. When comparing map measurement with on site measurement, 62 of 108 were correctly categorized. When the correlation analysis was performed, best correlation was found between 3D GIS and on site measurements with r = 0.84947 (p<0.0001). The correlation between map and on site measurement yielded an r of 0.76517 (p<0.0001). Since the GIS measurements and map measurement were made from the center point in the building and the on site measurements had to be made from the closest wall on the building, this might introduce and additional error in urban areas. The difference between 2D and 3D calculations were resulted from the height of buildings.

서식처 적합성 지수(HSI)를 활용한 맹꽁이 서식처 복원 위치 선정 (Site Selection of Narrow-mouth Frog(Kaloula borealis) Habitat Restoration Using Habitat Suitability Index)

  • 심윤진;조동길;홍진표;김덕호;박용수;성현찬
    • 한국환경복원기술학회지
    • /
    • 제18권2호
    • /
    • pp.33-44
    • /
    • 2015
  • This study was performed to propose the site selection plan for the restoration of the target Narrow-mouth Frog(Kaloula borealis) habitat, and has developed the AHP model to select the optimal site for narrow-mouth frog habitat restoration on the basis of the narrow-mouth frog Habitat Suitability Index (HSI) items (factors and variables). The assessment areas were established by the narrow-mouth frog HSI factors such as space, feed, cover, water(breeding), threatening factors and others, and the sub-assessment items by each assessment area were established based on the narrow-mouth frog HSI variables. The weighting values of the assessment areas and items were calculated by the developed AHP method. The weighting values of the 5 assessment areas were arranged in order as cover(0.283), water(breeding)(0.276), feed(0.230), space(0.147), and threatening factor(0.064). The final weighting values of the 14 assessment items were arranged in order of height as low-rise grassland(0.190), soil quality(0.178), and stones and between the stones(0.105). The scoring criteria according to the assessment items and factors were marked and applied by equal intervals considering the criteria by HSI items of the narrow-mouth frog and finally the scoring criteria diagram has been proposed for the optimal site selection of the narrow-mouth frog habitat restoration.

계룡산 국립공원 동학사 제2집단시설지구의 위치선정평가 및 대안비교 (The Evaluation and Comparison of Alternative Site for the Second Service Facilities Zone near the Tonghak Temple in Mt. Kyeryong National Park)

  • 이희선;이규석
    • 환경영향평가
    • /
    • 제4권2호
    • /
    • pp.29-37
    • /
    • 1995
  • The national park should be preserved in accordance with the regulation, but the development planning or facilities management planning has not been faithful to the spirits of the regulation. Recently natural environment has been radically changed, and especially damaged by large scale development of Service Facilities Zone. Thus the effective land use planning of the national park is required. Therefore, the purpose of this study is to propose the alternative site for The Second Service Facilities Zone in Mt. Kyeryong National Park using the GIS, and to compare the alternative site with the existing development site. Site selection was based on Rules of Combination which covers topographic analysis, viewshod analysis, distance analysis from hot spring well, land use analysis, and forest stand analysis.

  • PDF

공적개발원조사업(Official Development Assistance)의 방향과 환경평가 (Official Development Assistance and Environmental Assessment)

  • 이종호
    • 환경영향평가
    • /
    • 제23권1호
    • /
    • pp.51-65
    • /
    • 2014
  • ODA projects such as multi-purpose dam, industrial complex, road construction etc. have resulted in environmental damage and resident relocation including destruction of site of living. Even the grandiose developments as ODA projects have made clear the value clashes between development and environmental conservation, and have brought about conflicts between public interests and public environmental right, and the discordance between public interests and private property rights in the recipient country. This study summarizes and analyses the Korea's ODA projects and will suggest the public participation and governance system based on Saemaul Movement, Strategic Environmental Assessment and Environmental Impact Assessment based on the guideline of OECD DAC, and emphasize Strategic Environmental Assessment and Social Impact Assessment in the procedure of ODA projects. In the future the ODA project should be implemented for the overcome of poverty and response to climate change based on the experience and trial and errors of Korea's compact growth and past ODA projects.

Assessment Items of Outdoor Environment through Analysis of SITES - Focused on the Comparison with G-SEED and LEED -

  • Lee, Hyung-Sook
    • KIEAE Journal
    • /
    • 제14권4호
    • /
    • pp.11-18
    • /
    • 2014
  • Although assessing outdoor environment and green space in terms of sustainability and environmental performance is perceived as an important issue, most existing green building certification systems are more focused on buildings and indoor environment. Recently, the Sustainable Site Initiatives (SITES) has been developed by American Society of Landscape Architecture in order to evaluate sustainability of site development and outdoor environment. Separate from LEED, the SITES are increasingly receiving attentions as a reliable certification system in the United States. As a preliminary study to develop the items of outdoor environmental assessment, the present study is purposed to analyze the assessment items, grading system and applicability of SITES for better understanding on the system. Also it was compared to existing green building certification criteria, including G-SEED, LEED-NC, and LEED-ND in order to investigate similarities and discrepancies. The results would provide insights and basic data to improve assessment items for outdoor environment of G-SEED.