• Title/Summary/Keyword: environmental cost

Search Result 3,854, Processing Time 0.026 seconds

The Research on Economic Valuation of Maintenance Alternatives for Bridge (교량 유지관리 대안의 경제성 평가 연구)

  • Lee, Yongsu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.387-396
    • /
    • 2012
  • Bridge is an indispensable facility as a social overhead capital. This study suggests and examines the ways of Economic valuation on maintenance alternatives for Bridge. In order to evaluate each alterative on the basis of the same time, the concepts of the basic year and the valuation year are introduced and applied. Interest rates and discount rates are also applied according to the time when each cost is incurred. This study also suggests the ways that the objects of the valuation on maintenance alternatives are not limited to construction cost, but the valuation period is fixed and so maintenance cost and remaining value incurred by maintenance alternatives are valuated. Furthermore, this study shows the way to estimate and evaluate maintenance cost through direct construction cost and annuity present value coefficient and the way to estimate remaining value based on the basic year. In addition, this study suggests economic valuation system, cost methods and analyses of the result through verification. The proposed system is considered to be applied to practical business.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site (TBM 굴착 공법 적용 현장의 생산성 분석을 통한 암질별 굴진속도 및 직접공사비 분석)

  • Song, Young Sun;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.637-643
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based Oil the data analyzed TBM operating productivity, This research derived and presented excavation speed (m/day) by TBM diameter (3.0m, 3.5m, 3.8m) and rock. Also, based on the excavation speed (m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. When we perform a similar geological construction in the future, excavation speed and direct construction cost which were derived by TBM diameter and rock is thinking the effective utilization data to estimate construction cost and plan schedule management before the start of construction.

Using Cost-Benefit Analysis for a Feasibility Study on Constructing a Storage Facility in the Small River Basin (비용편익 분석을 통한 소하천유역의 저류조 설치 타당성 분석연구)

  • Seo, Se-Deok;Lee, Seung-Wook;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.135-141
    • /
    • 2016
  • This study aims to analyze the feasibility of installing a storage facility and make recommendations based on a cost-benefit analysis regarding the installation of a storage facility capable of preventing both floods and droughts. The capacity and installation costs are specified for the storage facility necessary to prevent floods, and a cost-benefit analysis is conducted by calculating the costs and benefits for each cost or benefit factor such as loss amounts, recovery costs, and drought prevention. The information can be used as the basic data for suggesting the feasibility of installing a multipurpose storage facility capable of preventing floods and droughts simultaneously. Also, this study expects to utilize its detailed results in a number of different ways including the prediction of loss amounts from natural disasters.

A Modified EGEAS Model with Avoided Cost and the Optimization of Generation Expansion Plan (회피비용을 고려한 EGEAS 모형 개발과 전원개발계획의 최적화)

  • 이재관;홍성의
    • Korean Management Science Review
    • /
    • v.17 no.1
    • /
    • pp.117-134
    • /
    • 2000
  • Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.

  • PDF

Estimation of CO2 Abatement Cost Considering Allocative Inefficiency of Inputs for the Korean Steel Industry: A Cost Function Approach (국내 철강업의 생산요소 간 비효율적 배분을 고려한 CO2 저감비용 산정 및 분석: 비용함수접근법)

  • Lee, Myunghun
    • Environmental and Resource Economics Review
    • /
    • v.23 no.3
    • /
    • pp.453-472
    • /
    • 2014
  • Analyzing the effects of carbon emissions trading, which is scheduled to be introduced in Korea in 2015, requires an accurate assessment of $CO_2$ abatement costs by both industries and firms. Firms faced with regulatory constraints are unlikely to minimize their production costs due to rising production costs caused by allocative inefficiency of inputs. The use of a distance function would results in underestimation of $CO_2$ abatement costs, because it fails to capture the allocative distortion costs. Recognizing the disadvantage of the previous approach, first, this paper tests for allocative efficiency of input for the Korean steel industry over the period 1990-2010, then derives the marginal $CO_2$ abatement costs by applying a cost function approach. The hypothesis of allocative efficiency in inputs is rejected and the steel industry pays an annual average cost of 92,000 won in removing an additional ton of $CO_2$ over the sample period.

The Impacts of Decision Order and Uncertainty on Emissions Trading (배출권거래제에서의 의사결정 순서와 불확실성 영향 분석)

  • Moon, Jin-Young
    • Environmental and Resource Economics Review
    • /
    • v.25 no.3
    • /
    • pp.403-419
    • /
    • 2016
  • Cap-and-trade policies that allow firms to trade emission allowances are designed to reduce emissions at least cost and are shown to be efficient when there is no uncertainty over emissions. This paper examines how uncertainty in emissions affects firms' decisions about permit purchase and abatement. The results show that whether firms abate more under uncertainty compared to a case with no uncertainty depends on the expected penalty cost and marginal abatement cost. If the expected marginal penalty cost is greater than the marginal abatement cost, the firm will choose to reduce emissions and abate more under uncertainty. When the expected marginal penalty is greater than the marginal cost of abatement, increases in uncertainty result in reduced emissions. This paper also examines whether the order of abatement and permit trading and the realization of uncertainty affect firms' decisions. The results show that total expected emissions are the same regardless of the order of moves.

Harvesting Productivity and Cost of Whole-Tree Clear Cutting Using a Tower Yarder in a Larix leptolepis Stand (낙엽송 개벌 임분에서 타워야더를 이용한 전목수확시스템의 작업비용 분석)

  • Cho, Min-Jae;Cho, Koo-Hyun;Oh, Jae-Heun;Han, Han-Sup;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.107-112
    • /
    • 2014
  • The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvesting system in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 $m^3/hr$. The highest production activity was the felling 17.93 $m^3/hr$, followed by the productivity of processing 15.62 $m^3/hr$ and then by the productivity of yarding 9.52 $m^3/hr$. In addition the total stump-to-pile operational cost was 24,086 $won/m^3$. The highest cost activity was the yarding 14,557 $won/m^3$ (60.4% of the total cost), followed by the costs of processing 8,461 $won/m^3$ (35.2%) and then by the costs of felling 1,068 $won/m^3$.

Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines (ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석)

  • Shin, Youngho;Kim, Jeong Hyun;Oh, Jitaek
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.407-415
    • /
    • 2015
  • The railway route and alignment planning have been executed with a limited number of alternatives based on the site pre-survey and the topographic map. This study developed an intelligent railway alignment planning program (ei-Rail) which can derive all the considerable design alternatives and provide the data for the alternative evaluation such as constructions cost, operation cost, and etc. According to the comparisons with prevailing planned railway projects, the time and cost for planning can be reduced as well as the construction costs. This program may contribute to the development of railway industry by reducing the time and cost for planning as well as the total project cost.

The Reasons for Store Loyalty of Beauty Service : Transaction Cost Perspective (미용서비스 산업에 있어서 점포충성도의 원인에 관한 연구: 거래비용적 관점)

  • Park, Sun-Ju;Yi, Seong-Keun
    • Journal of Distribution Research
    • /
    • v.12 no.1
    • /
    • pp.105-123
    • /
    • 2007
  • Recently, the beauty service industry in Korea is growing rapidly as women have increased role in society and consumers have more diversified desire for beauty. In that sense, studies on the environment of transaction is necessary to maintain the customers who use beauty service which Is one of the most prominent services in Korea. However, there is a lack of systematic investigation on that. Under those circumstances, this study tries to propose strategies by shedding light on the reasons of store loyalty based on empirical study. Furthermore, securing regular customers is deemed to be the most important thing as the competition among stores are getting fiercer in the wake of increase in the number of beauty salons. In that light, this study tries to shed light on the transaction cost clearly which affects the store loyalty, and focuses on the development of integrated research model for the transaction cost related to the environmental characteristics of beauty service industry and for the store loyalty.

  • PDF