APPLICATION OF DIGITAL ULTRASONIC IMAGE CONSTRUCTION SYSTEM FOR THE DETECTION OF CRACKS IN WATER DISTRIBUTION SYSTEM

  • Lee, Hyun-Dong;Kwak, Phill-Jae;Shin, Hyeon-Jae;Jang, You-Hyun
    • Environmental Engineering Research
    • /
    • 제11권2호
    • /
    • pp.99-105
    • /
    • 2006
  • A digital ultrasonic image construction system was developed for the nondestructive detection of cracks in water distribution pipes. The system consists of PC based ultrasonic testing system and a scanning device. The PC based ultrasonic system has an ultrasonic pulse/receive board for the generation and reception of ultrasonic signals, an analogue to digital conversion board for the digitization of the received ultrasonic signals, and transducers for the ultrasonic sensors. Using this system, the digitized ultrasonic signals were properly constructed in accordance with the position information obtained by scanning device that moves an ultrasonic transducer along the outer surface of pipes. In the construction of the ultrasonic signals, signal processing concepts, such as spatial average and array concept, were considered to enhance the resolution of ultrasonic images of pipe wall. Using the developed system, crack detection experiments were performed in both laboratory and field, which shows promise for crack detection in the water distribution system.

KINETICS OF AUTOTROPHIC DENITRIFICATION FOR THE BIOFILM FORMED ON SULFUR PARTICLES : Evaluation of Molecular Technique on Monitoring Biomass Growth

  • Kim, Sung-Youn;Jang, Am;Kim, I-Tae;Kim, Kwang-Soo;Kim, In-S.
    • Environmental Engineering Research
    • /
    • 제10권6호
    • /
    • pp.283-293
    • /
    • 2005
  • Characteristics of sulfur-based autotrophic denitrification in a semi-continuous type reactor and the kinetic parameters were studied. Enriched autotrophic denitrifying culture was used for the reactor operation. Biomass growth on sulfur particles and in the liquid medium was monitored using the DAPI staining method. From the result of ion concentration changes and the biomass growth, maximum specific growth rate, ${\mu}_{max}$, and the half velocity constant, $K_M$, were estimated as $0.61\;d^{-1}$ and 3.66 mg/L, respectively. Growth yield coefficient, Y values for electron acceptor and donor were found as 0.49 gVSS/g N and 0.16 gVSS/g S. The biomass showed specific denitrification rate, ranging 0.86-1.13 gN/g VSS-d. A half-order equation was found to best simulate the denitrification process in the packed bed reactor operated in the semi-continuous mode.

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

SUSTAINABILITY SOLUTIONS USING TRENCHLESS TECHNOLOGIES IN URBAN UNDERGROUND INFRASTRUCTURE DEVELOPMENT

  • Dae-Hyun (Dan) Koo;Samuel Ariaratnam
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.367-374
    • /
    • 2013
  • Underground infrastructure systems provide essential public services and goods through buried structures including water and sewer, gas and petroleum, power and communication pipelines. The majority of existing underground infrastructure systems was installed in green field areas prior to development of complex urban built environments. Currently, there is a global trend to escalate major demand for underground infrastructure system renewal and new installation while minimizing disruption and maintaining functions of existing superstructures. Therefore, Engineers and utility owners are rigorously seeking technologies that minimize environmental, social, and economic impact during the renewal and installation process. Trenchless technologies have proven to be socially less disruptive, more environmentally friendly, energy conservative and economically viable alternative methods. All of those benefits are adequate to enhance overall sustainability. This paper describes effective sustainable solutions using trenchless technologies. Sustainability is assessed by a comparison between conventional open cut and trenchless technology methods. Sustainability analysis is based on a broad perspective combining the three main aspects of sustainability: economic; environmental; and social. Economic includes construction cost, benefit, and social cost analysis. Environmental includes emission estimation and environmental quality impact study. Social includes various social impacts on an urban area. This paper summarizes sustainable trenchless technology solutions and presents a sustainable construction method selection process in a proposed framework to be used in urban underground infrastructure capital improvement projects.

  • PDF

건설기계류 소음·진동 특성 (Characteristics of Construction Machinery Noise and Vibration)

  • 강대준;이우석;이재원;홍준기
    • 한국소음진동공학회논문집
    • /
    • 제15권6호
    • /
    • pp.645-651
    • /
    • 2005
  • The construction noise Is one of the main causes of environmental impact. The complaints about it have been increasing every year. In order to reduce construction machinery noise, the product noise labeling for construction machinery has been recommended since 1 February 1996 and In the near future the government will convert the recommended product noise labeling to the mandatory product noise labeling for high noise construction machinery. Therefore, we investigated the noise and vibration level of 302 construction machines in construction work sites. This paper presents the basic data that will be used for setting the standard of construction machinery noise and predicting the noise level near construction work sites in environmental Impact assessment.

INCREASING REALISM OF CONSTRUCTION SIMULATION THROUGH INTEGRATION OF OPERATIONAL AND MANAGERIAL ASPECTS

  • Sangwon Han;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.821-826
    • /
    • 2009
  • Current construction simulation approaches mostly focus on operation aspects of construction projects, ignoring managerial aspects which can radically change operational profiles (e.g., number of resources, expected productivity level, or daily working hours) during the course of construction. As a result, these approaches may mislead construction managers into unrealistic execution plans as well as make them difficult to find potential performance improvement areas. As an effort to address this issue, this paper establishes a comprehensive construction modeling framework which integrates operational and managerial aspects of construction projects. The proposed modeling framework will provide construction managers with more accurate, more reliable, and more realistic simulation results thus reducing the likelihoods of schedule delays and cost overruns.

  • PDF

Understanding the Relationship between Construction Workers' Psychological Conditions and Safety Factors

  • Lim, Soram;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.138-141
    • /
    • 2015
  • The South Korean construction industry has shown a high proportion of industrial accidents (approximately 28% of whole injuries) and the continuously increasing accident rate. Although many safety research emphasized that the 3E (Enforcement, Education, and Engineering) approach is a potential solution to enhance workplace safety, there should be benefits to consider psychological (i.e., Emotional) effects on the safety performance since most construction works are human-oriented. Thus, understanding construction workers' psychological conditions can be a priority. This research studied the relationships between psychological conditions-which cover stress, personal temperament, emotional disturbance, and drinking habit-and specific safety-related factors including safety motivation and knowledge, and safety performance of individual workers at a construction site. This study conducted a survey of 430 respondents and analyzed the data with the multiple linear regressions. The results imply persistence, trait anxiety, and problem-focused coping style are the critical factors that should be controlled for enhancing jobsite safety. Finally, the research outcomes could be applied to build a strategic safety management plan for a construction manager.

  • PDF

Task-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.117-121
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Staffing-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.631-635
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구 (Analysis on the submittal process for a small local environmental construction company: a case study)

  • 이도균
    • 도시과학
    • /
    • 제6권2호
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF