Identifying unsafe habits of construction workers based on real-time location

  • Li, Heng;Chan, Greg
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.10-14
    • /
    • 2015
  • Unsafe behavior is one of the major causes of construction accidents. Managing the behavior of workers in real-time is difficult and requires huge manpower. In this paper, a new real-time locating framework is proposed to improve safety management by collecting and analyzing data describing the behavior of workers to identify habits that may lead to accidents. The aim of the study is to identify working habits of workers based on their location history. Location data is used to compare with that of other workers and equipment. The results indicate that the reuse of real-time location data can provide extra safety information for safety management and that the proposed system has the potential to prevent struck-by accidents and caught-in between accidents by predicting unwanted interaction between workers and equipment. This adds to current research aimed at automating construction safety to the point where the continuous monitoring, managing and protection of site workers on site is possible.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

BUSINESS CREATION BY INDUSTRIALISED BUILDING SYSTEM IN MALAYSIAN CONSTRUCTION INDUSTRY

  • Theong May Chuan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.407-412
    • /
    • 2011
  • Recently, the Malaysian government had been developing new technologies to the construction industry and one of them is the Industrialised Building System (IBS). The government urged that IBS is 100% utilized in all construction projects. It is believed that the application of IBS helps in reducing construction duration and cost, solving the problems of overflow of foreign workers in the site and improving performance and appearance of a structure. However, there are some parties like the contractor who feel reluctant to utilize this system because there are risks. They worry that their trades will be affected as IBS construct a structure using components which are manufactured in a factory and assemble on site. Therefore, this research is to find out whether IBS benefits the country's economy by focusing on the business created by investing in IBS. A comprehensive supply chain for IBS will be developed to compare with the traditional construction supply chain as to determine businesses or trades created and eliminated. This paper is looking at the theoretical framework about business opportunities due to the Government policy on embarking IBS.

  • PDF

An Environmental Analysis of Candidate SBAS Reference Station (위성기반 보강시스템 기준국 후보지의 환경 분석)

  • Han, Younghoon;Park, Sul Gee;Lee, Sangheon;Park, Sang Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.685-688
    • /
    • 2016
  • SBAS(Satellite Based Augmentation System) broadcasts the correction message based on satellite communication to improve the positioning accuracy of GNSS user. For this reason, SBAS is actively being utilized on navigation part. To apply SBAS to navigation part, it should satisfy not only accuracy but also integrity, continuity, availability, coverage requirements and so on. Since SBAS reference station is the base infrastructure of SBAS, it is the main factor to determine the environment, position, and geometry of reference stations to achieve SBAS service performance. Therefore, a site environmental analysis should be performed prior to the selection of SBAS reference station. In this paper, it performs the environmental analysis of NDGPS(Nationwide Differential GPS) reference station sites on the premise that SBAS reference station will be co-operated in the same site of NDGPS operated by MOF(Ministry of Oceans and Fisheries). The environmental analysis is conducted as carrying out the visibility analysis of GPS satellite and interference analysis. This paper also presents the brief procedures and requirements for site survey of SBAS reference station.

  • PDF

Site Monitoring of Crews and Passengers on Board by the BLE and PLM Combination (BLE와 PLM 조합의 승선자 위치 모니터링)

  • Kwon, Hyuk-Joo;Yang, Hyun-Suk;Lee, Sung-Geun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.4
    • /
    • pp.463-467
    • /
    • 2015
  • When unforeseen accidents occur in a ship, it is important to save passengers safely and remove them from the accident area quickly. To solve such a situation, site information of passengers on board always must be identified. This paper implemented a site monitoring of crews and passengers based on the BLE and PLM combination, to prepare for unexpected accidents of the ships. This system was composed of BLE tag for crews, passengers and each room, PLM networks, data server, and monitoring PC. In this system, site information derived from the tag attached to the bodies and cabins of crews and passengers are transmitted through a power line network, and monitored on the screen of a monitoring PC. The proposed system guides them into the only authorized area considering the ship security and passengers' safety, and even has a special alarm call to warn them after entering an unauthorized area. This system enables the BLE-embedded tag battery to use for a long time because the BLE consumes low electric power, and can gain an economic advantage.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Selection and Application of Multipurpose Farmland Sites Using the Farm Manager Registration Records and Spatial Data (농업경영체 등록정보와 공간정보를 활용한 농지범용화 사업 대상지 선정 방안 개발 및 적용)

  • Na, Ra;Joo, Donghyuk;Kim, Hayoung;Yoo, Seung-Hwan;Kwak, Yeong-cheol;Kim, Jeonghoon;Yi, Hyangmi;Cho, Eun Jung
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.1
    • /
    • pp.17-26
    • /
    • 2022
  • It is necessary to prepare a stable production base in advance for a change in the global grain market, and it is required to prepare comprehensive countermeasures such as securing technical skills and cultivation technology. Therefore, Korea, which relies on imports of major grains other than rice, could be exposed to a food crisis at any time unless the self-sufficiency rate of grains is improved. In order to respond to this new food crisis, it is necessary to find ways to efficiently utilize rice fields to increase the domestic grain self-sufficiency rate. From this point of view, interest and demand for the generalization of farmland that can be used as paddy fields and returned to paddy fields are increasing, and related research is also being continuously performed. In order to select a multipurpose farmland project site, this study extracted farmland containing 10% or more purchased and stockpiled farmland through spatial analysis (buffer, dissolve, intersect, etc.), and finally presented areas subject to multipurpose farmland projects. The target site for the multipurpose farmland project was finally selected by integrating data onto a point-by-point basis so that the current status of farmland purchased and stockpiled, Farm Manager Registration Records, and the Korean Soil Information System data (drainage classes, surface soil texture, field-suitability classification, etc.) can be used in combination. There are 175 areas where the multipurpose farmland is possible. Incheon 2, Gyeongbuk 40, Gangwon 2, Chungbuk 7, Chungnam 48, Jeonbuk 34, Jeonnam 19, Gyeongbuk 15, Gyeongnam 8. Chungcheongnam-do has the most target site for the multipurpose farmland project, and Gangwon-do is the least. It is expected to contribute to new commercialization and business expansion by deriving business areas by identifying the scale of the farmland multipurpose farmland project using Farm Manger Registration Records and spatial data.