• Title/Summary/Keyword: engineering site

Search Result 7,648, Processing Time 0.04 seconds

Factor Analysis on Citizen's Motives to Tree Burial and Choice Conditions to Tree Burial Site (수목장의 동기와 수목장지 선호조건에 대한 요인 분석)

  • Woo, Jae-Wook;Byun, Woo-Hyuk;Park, Won-Kyung;Kim, Min-Soo;Yim, Min-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.639-649
    • /
    • 2011
  • The purpose of this study aimed to analyze factors on motives to tree burial and choice conditions to tree burial site in order to suggest policy direction for the desirable settlement of tree burial. For those purpose, this study performed questionnaire, targeting 522 visitors of funeral hall all around Korea. As the result, the factors of motives to tree burial were extracted as follows: funeral ceremony progressed along with trees, simplicity, memorial site's easy insurance, environmental friendliness and consideration toward descendants. The factors on choice conditions to tree burial sites were extracted as follows: beauty of natural scenery, emotional mood as a memorial site, convenience, stability and economic feasibility. Based on the results of factor analysis, this study suggested policies related to motives to tree burial as follows: develop various types of tree burial sites, develop a funeral ceremony suitable for tree burial, come into wide use of tree burial as a social welfare service, develop tree burial methods capable of many burials, and improve professionalism to manage tree burial system. In addition, this study proposed related choice conditions to tree burial sites as follows: establish natural forest scenery, convert existing graveyards into tree burial sites, select easily accessible places for tree burial sites, form tree burial sites as places for both rest and memory, and reduce using fee of tree burial site.

Evaluation of Biomechanical Properties of Fractured Adjacent Soft Tissue Due to Fracture Site Spacing During Closed Reduction After Forearm Fracture: Finite Element Analysis (전완 골절 후 도수 정복 시 골절 부위 간격에 따른 골절 인접 연부 조직의 생체역학적 특성 평가: 유한요소해석)

  • Park, Jun-Sung;Lee, Sang Hyun;Song, Chanhee;Ro, Jung Hoon;Lee, Chiseung
    • Journal of Biomedical Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.308-318
    • /
    • 2022
  • The purpose of this study is to evaluate the biomechanical properties of fractured adjacent soft tissue during closed reduction after forearm fracture using the finite element method. To accomplish this, a finite element (FE) model of the forearm including soft tissue was constructed, and the material properties reported in previous studies were implemented. Based on this, nine finite element models with different fracture types and fracture positions, which are the main parameters, were subjected to finite element analysis under the same load and boundary conditions. The load condition simulated the traction of increasing the fracture site spacing from 0.4 mm to 1.6 mm at intervals of 0.4 mm at the distal end of the radioulnar bone. Through the finite element analysis, the fracture type, fracture location, and displacement were compared and analyzed for the fracture site spacing of the fractured portion and the maximum equivalent stress of the soft tissues adjacent to the fracture(interosseous membrane, muscle, fat, and skin). The results of this study are as follows. The effect of the major parameters on the fracture site spacing of the fractured part is negligible. Also, from the displacement of 1.2 mm, the maximum equivalent stress of the interosseous membrane and muscle adjacent to the fractured bone exceeds the ultimate tensile strength of the material. In addition, it was confirmed that the maximum equivalent stresses of soft tissues(fat, skin) were different in size but similar in trend. As a result, this study was able to numerically confirm the damage to the adjacent soft tissue due to the fracture site spacing during closed reduction of forearm fracture.

Applications of Transposon-Based Gene Delivery System in Bacteria

  • Choi, Kyoung-Hee;Kim, Kang-Ju
    • Journal of Microbiology and Biotechnology
    • /
    • v.19 no.3
    • /
    • pp.217-228
    • /
    • 2009
  • Mobile genetic segments, or transposons, are also referred to as jumping genes as they can shift from one position in the genome to another, thus inducing a chromosomal mutation. According to the target site-specificity of the transposon during a transposition event, the result is either the insertion of a gene of interest at a specific chromosomal site, or the creation of knockout mutants. The former situation includes the integration of conjugative transposons via site-specific recombination, several transposons preferring a target site of a conserved AT-rich sequence, and Tn7 being site-specifically inserted at attTn7, the downstream of the essential glmS gene. The latter situation is exploited for random mutagenesis in many prokaryotes, including IS (insertion sequence) elements, mariner, Mu, Tn3 derivatives (Tn4430 and Tn917), Tn5, modified Tn7, Tn10, Tn552, and Ty1, enabling a variety of genetic manipulations. Randomly inserted transposons have been previously employed for a variety of applications such as genetic footprinting, gene transcriptional and translational fusion, signature-tagged mutagenesis (STM), DNA or cDNA sequencing, transposon site hybridization (TraSH), and scanning linker mutagenesis (SLM). Therefore, transposon-mediated genetic engineering is a valuable discipline for the study of bacterial physiology and pathogenesis in living hosts.

Development of Monitoring Site Selection Criteria of the Korean Soil Quality Monitoring Network to Meet its Purposes (토양측정망 운영목적에 따른 토양측정망 지점 선정 방안 연구)

  • Jeong, Seung-Woo
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.2
    • /
    • pp.19-26
    • /
    • 2013
  • This study developed the classification of National Soil Quality Monitoring Network (NSQM) and its site selection criteria to meet the recently established purposes of the NSQM. The NSQM were suggested by this study to classify into the six-purposes site groups from the current classification of land uses. The six purposes site groups were 1) intensive observation sites, 2) contaminant loading sites, 3) human activity sites, 4) background sites, 5) river soil sites, and 6) sites near the groundwater quality monitoring wells. Furthermore, this study developed the site selection criteria of NSQM utilizing the accumulated NSQM data, road traffic data, chemical emission data, census, soil information, and the literature related to soil quality variation due to contaminant loads. For selecting suitable sites for NSQM, this study used road traffic, chemical emission, the distance from the contaminant sources, and population information as specific criteria. The suggested site classification and criteria were appled for the current 100 NSQM sites for evaluation. Forty sites were met to the criteria suggested by this study, but sixty sites were not met to the criteria. However, some of the sixty sites also included the obscure sites that their addresses were not apparent to find them.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

A Study on the Practical lighting Guide for Night Work (야간작업 안전의 적정조명 기준설정을 위한 실험연구)

  • Ro Min-Lae;Son Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.70-77
    • /
    • 2004
  • A Reasonable lighting should be provided for doing night work. All works far construction site can be exposed to potential hazard at night work The purpose of this study is to provide a standard of the lighting against accidents due to insufficient lighting at site. one pilot tea one at building work site, one at mad work site of it have been conducted for figuring out illumination change depending worker's activity direction, using lux checker to show it as numerical indication. The direction are changed with a range of 30, 60, 90, and 135 degree to be checked at site. Tests results show that $10\%\;and\;15\%$ of lighting could be decreased by changing the working direction of works at site. Therefore, steep slope place, cave work and backside of structural elements such as a column, deep beam should be considered for keeping sufficient and reasonable lighting. It is found that $50\%more$ illumination Lux needs f3r civil work than for building work.

Reevaluation of Seismic Fragility Parameters of Nuclear Power Plant Components Considering Uniform Hazard Spectrum

  • Park, In-Kil;Choun, Young-Sun;Seo, Jeong-Moon;Yun, Kwan-Hee
    • Nuclear Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.586-595
    • /
    • 2002
  • The Seismic probabilistic risk assessment (SPRA) or seismic margin assessment (SMA) have been used for the seismic safety evaluation of nuclear power plant structures and equipments. For the SPRA or SMA, the reference response spectrum should be defined. The site-specific median spectrum has been generally used for the seismic fragility analysis of structures and equipments in a Korean nuclear power plant Since the site-specific spectrum has been developed based on the peak ground motion parameter, the site-specific response spectrum does not represent the same probability of exceedance over the entire frequency range of interest. The uniform hazard spectrum is more appropriate to be used in seismic probabilistic risk assessment than the site- specific spectrum. A method for modifying the seismic fragility parameters that are calculated based on the site-specific median spectrum is described. This simple method was developed to incorporate the effects of the uniform hazard spectrum. The seismic fragility parameters of typical NPP components are modified using the uniform hazard spectrum. The modification factor is used to modify the original fragility parameters. An example uniform hazard spectrum is developed using the available seismic hazard data for the Korean nuclear power plant (NPP) site. This uniform hazard spectrum is used for the modification of fragility parameters.

Effect of Co substitution on NiSi and $NiSi_2$: ab initio calculation (NiSi와 $NiSi_2$에 대한 Co 치환의 영향: ab initio 계산)

  • Kim, Yeong-Cheol;Seo, Hwa-Il
    • Journal of the Semiconductor & Display Technology
    • /
    • v.6 no.3
    • /
    • pp.13-17
    • /
    • 2007
  • Effect of Co substitution on crystal structures of two nickel silicides, NiSi and $NiSi_2$, is investigated by using an ab initio calculation. Relaxed NiSi and $NiSi_2$ structures are calculated and the calculated lattice parameters are in good agreement with experimentally determined lattice parameters within about 2%. A Co atom substitutes a Ni and Si site, respectively, to evaluate the preferable site between them. Co prefers Ni site to Si site in both NiSi and $NiSi_2$. The calculated total energy also indicates that the Co substitution to Ni site stabilizes both the NiSi and $NiSi_2$ structures. Co also prefers Ni site in $NiSi_2$ to that in NiSi, indicating that $NiSi_2$ becomes more stable than NiSi with Co substitution. As Co addition to NiSi improves its thermal stability experimentally, this indicates that the energy barrier between the two phases is high enough to prevent the phase transformation from NiSi to $NiSi_2$ up to high temperature.

  • PDF

AN INVESTIGATION INTO RADIATION LEVELS ASSOCIATED WITH DISMANTLING THE KOREA RESEARCH REACTOR

  • Choi, Geun-Sik;Kim, Hee-Reyoung;Han, Moon-Hee
    • Nuclear Engineering and Technology
    • /
    • v.42 no.4
    • /
    • pp.468-473
    • /
    • 2010
  • We confirmed that the dismantling of two research reactors with thermal power of $2MW_{th}$ and $100kW_{th}$, respectively, reveals no significant difference between the radiation levels of the research reactor site and the surrounding environment far away from it, from the radiation level aspect. Radiation dose and radioactivity were measured at monitoring points around the research reactor site of the Korea Atomic Energy Research Institute (KAERI) in Seoul and comparison points 0.5 km to 3.3 km from the site. To grasp trends in the radiation levels during dismantling from the end of 2002 to the end of 2007, the gamma radiation dose rate, the accumulated dose, and the radioactivity of the strontium, tritium, and gamma isotopes were statistically treated and estimated. The averages of these items between the two groups, the research reactor site and comparison points, were assessed by applying a T-test with a significance level of 0.05. P-values found by using the T-test were from 0.12 to 0.83 where the values were much higher than the significance level. As a result, no difference was observed between the radiation levels at the research reactor site and at the comparison points by this T-test. This study showed that dismantling activity of the Korea Research Reactor of the Seoul site did not expose the public or the environment to harmful levels of radiation.

Multi-unit risk assessment of nuclear power plants: Current status and issues

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1199-1209
    • /
    • 2018
  • After the Fukushima-Daiichi accident in 2011, the multi-unit risk, i.e., the risk due to several nuclear power plants (NPPs) in a site has become an important issue in several countries such as Korea, Canada, and China. However, the multi-unit risk has been discussed for a long time in the nuclear community before the Fukushima-Daiichi nuclear accident occurred. The regulatory authorities around the world and the international organizations had proposed requirements or guidelines to reduce the multi-unit risk. The concerns regarding the multi-unit risk can be summarized in the following three questions: How much the accident of an NPP in a site affects the safety of other NPPs in the same site? What is the total risk of a site with many NPPs? Will the risk of the simultaneous accidents at several NPPs in a site such as the Fukushima Daiichi accident be low enough? The multi-unit risk assessment (MURA) in an integrated framework is a practical approach to obtain the answers for the above questions. Even though there were few studies to assess the multi-unit risk before the Fukushima-Daiichi nuclear accident, there are still several issues to be resolved to perform the complete MURA. This article aims to provide an overview of the multi-unit risk issues and its assessment. We discuss the several critical issues in the current MURA to get useful insights regarding the multi-unit risk with the current state art of probabilistic safety assessment (PSA) technologies. Also, the qualitative answers for the above questions are addressed.