Proceedings of the Korea Inteligent Information System Society Conference
/
1999.10a
/
pp.121-130
/
1999
The objective of this paper is to apply Extended AND-OR Graph (EAOG)-related techniques to extract knowledge from a specific problem-domain and perform analysis in complicated decision making area. Expert systems use expertise about a specific domain as their primary source of solving problems belonging to that domain. However, such expertise is complicated as well as uncertain, because most knowledge is expressed in causal relationships between concepts or variables. Therefore, if expert systems can be used effectively to provide more intelligent support for decision making in complicated specific problems, it should be equipped with real-time inference mechanism. We develop two kinds of EAOG-driven inference mechanisms(1) EAOG-based forward chaining and (2) EAOG-based backward chaining. and The EAOG method processes the following three characteristics. 1. Real-time inference : The EAOG inference mechanism is suitable for the real-time inference because its computational mechanism is based on matrix computation. 2. Matrix operation : All the subjective knowledge is delineated in a matrix form, so that inference process can proceed based on the matrix operation which is computationally efficient. 3. Bi-directional inference : Traditional inference method of expert systems is based on either forward chaining or backward chaining which is mutually exclusive in terms of logical process and computational efficiency. However, the proposed EAOG inference mechanism is generically bi-directional without loss of both speed and efficiency.
Journal of Korean Society of Industrial and Systems Engineering
/
v.9
no.13
/
pp.23-28
/
1986
The qualitative aspects of decision making have been the toughest problems that could nor be easily manipulated and solved by the traditional management science techniques. The expert systems has been emerged as a powerful tool for handling such difficulties. In this article, the concept, the structure of the expert systems would be reviewed and the expert systems application to management would be discussed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.17
no.30
/
pp.73-79
/
1994
This paper propose Adaptive Maintenance as a new type of maintenance for machine failures which are unpredictable. A purpose of adpative maintenance is to decrease inconsistency. In order to pick up some of problems the traditional maintenance policy, We discussed Time Based Maintenance(TBM) and Condition Based Maintenance(CBM) with Bath-Tub Curve. By using Machine Condition Diagnosis Technique (CDT), Monitored condition maintenance deals with the dynamic decision making for diagnosis procedures at maintenance and caution level. Adaptive Maintenance is a powerful tool for Total Production Maintenance(TPM).
Proceedings of the Korean Geotechical Society Conference
/
2006.10a
/
pp.3-20
/
2006
The following lessons have been learned from the application of reliability methods in the practice of geotechnical engineering: 1. Establishing Goals Is Important; 2. Mitigating Consequences Can Be Effective; 3. Performance Depends on Systems; 4. Physical Factors Are Important in Statistical Models; 5. Too Much and Too Little Conservatism Are Both Problems; 6. Value of Information Depends on Decision Making; and 7. Effective Communication Is Essential. While the potential for application of reliability methods in the future is unlimited, there are major needs related to each of these lessons that will have to be addressed in order to realize this potential.
Korean Journal of Construction Engineering and Management
/
v.15
no.1
/
pp.51-61
/
2014
Preventive maintenance of buildings has increased the importance of interest in that it is able to maintain the performance building has and to prevent a problem occurred in future. For improved preventive maintenance work, it should be performed to select works order clearly and preceded the accurate measurement for the state of works order. when measuring the conditions, measurement of the state of work order considering the various criteria is more effective than to measure by only criterion. But, there are something hard to evaluate exactly between the criteria because of decision-maker's subjective judgments. To solve these problems, this research proposes decision making support model to determine preventive maintenance works order using Fuzzy-sets. By using Fuzzy-sets when measuring state of work objects, it can be reduced vagueness of judgments by decision-makers. This model can be used as a tool for objective evaluation of preventive maintenance work orders and offer the guideline to perform decision-making.
Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.71-79
/
2004
In the stage of feasibility study of urban rehabilitation projects, the precise forecast of physical and environmental changes has great influence on the further transaction of the projects. However, various important decision makings are made by the experience and intuition of the person-in-charge in practice without the process and method for systematic and quantitative analysis. In spite of various qualitative influent factors on the projects, the feasibility studies are made by the result of economic analysis only, which often lead the projects to the crucial deficit. The main reasons of such a mal-functional transaction are due to the absence of the reasonal procedure of feasibility study and decision making reflecting the characteristics of urban rehabilitation projects. The objective of this paper is to propose feasibility study processes and decision making methods in relation to various influent factors on urban rehabilitation projects in the initial stage. The goal and process of every analysis stage and the pertinent factors and decision makings are analyzed and proposed through the survey of current research, a case study, interview with the professionals. The processes and methods are well applied to improve current problems of feasibility study of urban rehabilitation projects. In addition, the establishment of the analysis goal at three principal stage and a series of reasonable decision makings with pertinent factors to each stage will lead the project to more successful result than ever.
Decision procedure was done with the evaluation of multi-criterion analysis. Importance of each criterion was considered through heuristically method, specially it was based on the heuristic least mean square algorithm. To consider coalition evaluation, it was carried out by calculation of Shapley index and Interaction value. The model output is also analyzed with the help of those two indexes, and the procedure was also displayed with details. Finally, the differences between the model output and the desired results are evaluated thoroughly, several problems are raised at the end of the example which require for further studying.
In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.
There have been many studies to build a model that can help investors construct optimal portfolio. Most of the previous models, however, are based upon the path-breaking Markowitz model (1959) which is a quantitative model. One of the most important problems with that kind of quantitative model is that, in reality, most of the investors use not only quantitative, but also qualitative information when they select their optimal portfolio. Since collecting both types of information from the markets are time consuming and expensive, making a set of target assets smaller, without suffering heavy loss in the rate of return, would attract investors. To extract only desired assets among all available assets, we need knowledge that identifies investors' preference for the risk of the assets. This study suggests two-layer decision-making rules capable of identifying an investor's risk preference and an architecture applying them to a quantitative portfolio model based on risk and expected return. Our knowledge-based portfolio system is to build an investor's preference-oriented portfolio. The empirical tests using the data from Korean capital markets show the results that our model contributes significantly to the construction of a better portfolio in the perspective of an investor's benefit/cost ratio than that produced by the existing portfolio models.
Shokri, Hamidreza;Ashjari, Behzad;Saberi, Morteza;Yoon, Jin Hee
Industrial Engineering and Management Systems
/
v.12
no.4
/
pp.389-405
/
2013
A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.