The optimal woodchip production system was developed and the production cost of a forest woodchip fuel was calculated for utilizing the pitch pine, which covers around 480,000ha nationwide. the marginal price of the woodchip fuel considering the factor of supply price, electricity and heat selling price as well as capacity factor were suggested and the economic sensitivity analysis was conducted for various scenario. The most important variable which determine economic feasibility was a fuel cost for the power generation facility. If the electricity price is higher than the current SMP(System Marginal Price) or the capacity factor is higher than 80%, there fully is a benefit to consume the woodchip fuels produced in the suggested production system in this study. In addition, the additional benefit becomes more obvious when considering REC(Renewable Energy Certificate) and CDM(Clean Development Mechanism). Therefore, it is strongly suggested for domestic power generation sector to utilize the forest biomass fuel to achieve the obligatory target of RPS.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.11
/
pp.2021-2027
/
2011
Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. This paper proposes a method to compute the congestion and loss costs which are the key elements in economic assessment of the power system planning. And the benefit of market participants in CBP (Cost Based Pool) is computed. To demonstrate the efficient of the suggested methods, these methods are applied to peak load system of 2016 in the 4th Basic plan of Long-Them Electricity Supply and Demand.
Proceedings of the Korea Society for Energy Engineering kosee Conference
/
2004.05a
/
pp.341-346
/
2004
In the present work, for various energy and electricity generating systems to be compared in view of integrated social impacts, nuclear, coal-fired, heavy oil-fired, and LNG, and hydroelectricity systems are considered as electricity generating options. The following assessment factors are selected: economic effect, health effect, environmental effect, and benefit at the national level. As a preliminary study, these factors are represented as power generation cost, estimated mortality, Carbon Dioxide gas emission, and fuel supply stability, respectively. For integrated representation of a multi-criteria decision-making (MCDM) problem, radar charts are introduced to facilitate a comparative recognition of estimates. In the near future, based on the estimates, a MCDM methodology for both qualitative and quantitative comparison will be developed.
There are many successful cases in power interconnection among European and South American countries. However, that is not the case in Northeast Asian countries. Even though there will be a considerable benefit in power interconnection in Northeast Asian countries, there will be some difficulties due to various interest relationship and constraints among countries in Northeast Asia. GTMax(Generation and Transmission Maximization) Program is a very useful tool to analyze competitive electricity market and power interconnection developed by Argonne National Laboratory under the Department of Energy in the USA. This study tried to verify applicability and usefulness by GTMax model to domestic electric power system and power transfer from Russia Far East by power interconnection. When the power by importing from Russia is 2,000MW(around 2% of domestic installed capacity in 2017), there is no impact on domestic electricity market because of small power transfer. The power by importing should be large enough for achieving greater cost reduction by power interconnection. Besides, it would be better to supply power to Kyung-In region directly in reducing overall cost when the power by importing from Russia are sold at low price. In the case of interconnecting Young-Dong region, if it is not possible to upgrade transmission line with power transfer capabilities between Young-Dong and Kyung-In region, then the power by importing from Russia can replace the power produced in Jung-Bu region and the relative benefit of importing power can be reduced.
This paper is the second part of a literature review describing the current status of biomass energy use in the USA. The bioenergy technologies that convert biomass resources to a form of energy were presented, in particular focused on existing coal fired boiler, high efficiency gasification combined cycle. We presented latest biomass power energy supply, economic issues such as its production and plant investment cost in the Part I. In the Part II, our review summarized policy and market issues for electricity consumers, benefits from biomass power which could offer an alternative to conventional energy sources in the form of environmental, rural economic growth, and national energy security in the USA.
Journal of Korean Society of Environmental Engineers
/
v.35
no.5
/
pp.363-370
/
2013
Small scale hydropower is one of most attractive and cost-effective energy technologies for installation within sewage treatment plants. This study was conducted to evaluate the potential of a semi-kaplan micro-hydropower (MHP) system for application to sewage treatment plants with high flow fluctuations and a low head. The semi-kaplan MHP is equipped with an adjustable runner blade, and is without a guide vane, so as to reduce the incidence of mechanical problems. A MHP rating 13.4 kWp with a semi-kaplan turbine has been considered for Kiheung Respia sewage treatment plant, and this installation is estimated to generate 86.8 MWh of electricity annually, which is enough to supply electricity to over 25 households, and equivalent to an annual reduction of 49 ton $CO_2$. The semi-kaplan turbine showed a 90.2% energy conversion efficiency at the design flow rate of 0.35 $m^3/s$ and net head of 4.7 m, and was adaptable to a wide range of flow fluctuations. Through the MHP operation, approximately 2.1% of total electricity demand of Kiheung Respia sewage treatment plant will be achievable. Based on financial analysis, an exploiting MHP is considered economically acceptable with an internal rate of return of 6.1%, net present value of 15,539,000 Korean Won, benefit-cost ratio of 1.08, and payback year of 15.5, respectively, if initial investment cost is 200,000,000 Korean Won.
The purpose of this study is to develop a business model that efficiently converts diesel power generation systems to renewable energy microgrids (MG) in large-scale islands. Most of the previous studies on the conversion of renewable energy MG in islands had limitations dealing with efficiency from the perspective of suppliers. However, the microgrid has the characteristic of getting benefits through the interaction between the consumer and the supplier. In addition, the efficient MG business model from the perspective of new institutional economics is a structure in which consumers and suppliers jointly participate. Therefore, this study assumed that the MG business model in which the supplier's MG and the consumer's community solar participated would benefit all participants, and verified the assumptions using domestic island data. In terms of supplier investment, the cost of power supply (LCOE) of assumed model was calculated to be 14.0% lower than that of the diesel model and 3.7% lower than that of the supplier-only MG model. From the perspective of consumer investment, electricity bills are expected to be reduced by more than 200,000 won per household per year through self-generation of solar power. Social benefits are expected to reduce external environmental costs. The CO2 emissions of the assumed model were calculated to be 39.5% lower than the diesel model and 1.5% lower than the supplier-only MG model. Therefore, the MG business model with consumer participation proposed in this study is expected to be an efficient alternative to renewable energy MG conversion in domestic islands, and is meaningful as an energy plan that improves the benefits of local residents.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.